Resume

Sign in

Engineer Quality

Location:
Qibla, Kuwait City, Kuwait
Posted:
February 20, 2020

Contact this candidate

Resume:

Page * of *

Area of Experience:

Professional Certifications:

Technical Trainings:

RATNA KUMAR BARIGELA (QA/QC ENGINEER CV)

Phone: +965-********.

E-mail: adbv7v@r.postjobfree.com

Visa Status: Transferable Visa (No.18)

Valid Kuwait Driving License & KSE card.

Summery / Brief Overview:

Hold a rich experience of ten (10+) plus Years in Quality Management System/Control Process, Project Start up to handover and well acquainted with International standards including KOC, KNPC & Telecom. Highly motivated, pro active, preventive Quality Assurance and Detective Quality Control professional with People Management and Teamwork to thrive in a fast paced, results oriented project environment. Experience Summary:

1. Currently working as a Quality Control Engineer (KOC Approved) with Salem M Al-Nisf (SNC) 2. Worked as a Quality Control Engineer (KOC Approved) with STFA. 3. Worked as a QA/QC Engineer with IMCO Engineering & Construction Co. W.L.L 4. Worked as a Quality Engineer with PCS Company Ltd. 1. QA/QC Activities & QMS

2. Pre commissioning & commissioning.

3. Vendor / Manufacturer Co ordination.

4. Ability to deal with PMC / KOC.

5. Construction Activities.

6. Detailed Engineering.

7. Project Start up to Handover (End to end)

Educational Qualification:

Bachelor of Technology in Electronics and Communication Engineering (ECE) -2009

(Affiliated to JNTU with NBA) – AP. INDIA

Kuwait Society of Engineers (KSE) Card Holder (267) valid up to 08.04.2020.

Quality Management Essentials Course

Certificate of KOC Approvals as a Quality Engineer.

Certificate of Attendance for Root Cause and Analysis Awareness Program 2014 at Kuwait.

QMS Auditor / Lead Auditor Course.

AutoCAD 2007

Adobe Acrobat 8 & Adobe Reader IX Professional.

Operating System : Windows # XP, 7, 8, 9 & 10

Page 2 of 5

Responsibilities

Computer Software : Oracle Developer 2000, Visual Basic & C, C++, MS Office

Version Number : NT # 5.1, 6.1

Programming Language : C, C++, Mat lab

Network : All Internet explorer

Professional Experience Detailed:

Project-4 : Ahmadi Township Security Project - Phase I Organization : Salem M Al-Nisf General Building Contracting Co.W.L.L Duration : March 2018 – till the date.

Designation : Quality Control Engineer.

Contractor : Salem M Al-Nisf (SNC) Budget # 0.8 MKD Company : Kuwait Oil Company (KOC)/CP-III.

Project- 3 : Small Boat Harbours.

Organization : IMCO Engineering & Construction Co. WLL. Kuwait. Duration : Oct 2016 – 2018 March.

Designation : Quality Control Engineer.

Contractor : STFA / Project Budget # 440 M USD.

Company : Kuwait Oil Company (KOC)/PMC-SSH

Project- 2 : Integrated Security System for all KOC facilities. Organization : IMCO Engineering & Construction Co. WLL. KUWAIT Duration : Aug 2013 – Oct 2016.

Designation : QA/QC Engineer

Contractor : Samsung (SDS) / Project Budget # 490 MUSD Company : Kuwait Oil Company (KOC)/PMCFluor.

Project- 1 : Installation of 3G & 4G BTS

Organization : PCS Company Ltd. Hyderabad.

Duration : Nov 2009 – July 2013

Designation : Quality Engineeró

Contractor : Huawei/58 Million US$.

Company : Bharath Sanchar Nigam Limited (BSNL-Govt.)

Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of

(EPC) Engineering, Procurement and Construction discipline interfacing the multidisciplinary operations and developing quality control system.

Leadership in evaluation, planning, organization, and execution of assigned project requirements. Possess thorough knowledge of all aspects of the assigned project construction execution plan, commissioning execution plans and turnover activities. Page 3 of 5

Preparation and maintaining of QA/QC documents of the entire project including, Engineering deliverables list, Inspection Requests (Site/material), Non-Compliance Reports, Field Change Notice, Site Instruction/ Observations, Calibration Certificates, Test Results in the line of Quality Management System/PDCA.

Develop method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.

Preparation of daily, weekly and monthly progress meetings, attending along with KOC.

Problem-solve and communicate possible solutions to improve the quality of a range of products, and also must work with a wide range of staff members to discuss improvements and ways to implement changes.

Preparation and approvals of Materials manufacturer/supplier and technical proposals.

Preparation and approvals of procedures, plans and manuals.

Preparation and approvals of documents (FAT & SAT) and drawings.

Preparation and maintaining engineering deliverable list for drawings and documents..

Review quality of materials at site and ensure compliance to all project specifications and quality and collaborate with department for all material procurement and maintain quality of materials and Prepare related Documents for Approvals.

Cary out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.

Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP

Supervise effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinate with various teams to perform quality audits on processes

Monitor an efficient system and record for all project activities and analyze all processes to ensure all work according to quality requirements.

Co ordination with Third Party inspection agency and client for inspection and calibration for various E&I equipment’s received for projects.

Develop and issue reports relevant to QA/QC activities MEP clearances

World’s most advanced Integrated security systems Project inside Kuwait Oil company for Process plants like Gathering centers, Booster stations, Gas control manifold, Tank farm, Power plants, Substations, Effluent water disposal plants, Control rooms, all electrical equipment & Security Equipment related to the project.

Prepares the commissioning and Project dossiers. Page 4 of 5

Ensures safe execution of all commissioning activities through the application of the work permit procedure.

Pre commissioning and comm. commences, which can be done in phases as the construction is complete.

Monitor installation, submittals and usage of engineering tools adhering to project and commissioning guidelines.

Preparation of Shutdown, Tie-in Package, Pre Commissioning & commissioning, performance test, and Acceptance test Package and Test reports.

Pre-Energizing and Energizing preparation, lockout & tag out procedure.

Monitor implementation of the Asset/Project/Function Quality Management System through regular audits and review.

Maintaining Project Record Book & Construction Record Books (CRB, PRB).

Installation, testing and maintenance of All type of BTS, (Motorola, Huawei, Zte etc.…) Antenna and Microwave fire and gas detection and protection systems in throughout the plant area and Control rooms, Substations, Instrument equipment shelters, office buildings. And etc.

Activities planning, site Management, Project Management According with Installation, modification, maintenance, troubleshooting related to telecommunication.

Installation, modification, maintenance, troubleshooting related to telecommunication. Safety duties and Responsibilities

Complies with the highest level of safety during all stages of work to avoid any type of incidents and or Accidents.

Take reasonable care of own health and safety and that of others in the workplace.

Work with the Project HSE Engineer and the Project Management Team to ensure that all areas of the Project’s operations conform to applicable regulatory and contractual HSE obligations.

Handing over of the site duly commissioned to the client after Site clearance and Acceptance. Other skills and competencies:

Ability in report writing, business and technical correspondence and data analysis.

Possess team leadership, management and business administration capabilities and with good negotiation and communication skills.

Testing, Loop checking, Integration cause and effect and logic test (Relay) of Simplex Time Recorder Co. USA (Model No.: 4100) addressable fire alarm panel buildings, control rooms, other buildings fire alarm panels, and Master Evacuation.

Page 5 of 5

Different type of Firefighting systems, (Patterson, Reddy buffaloes) pre commissioning and Reports

Safety induction, Trainings, Tool box meeting, PPE Usages, Task specific, Manual Handling, Operation of Pneumatic Equipment be understood.

Personal information:

Sex : Male

Nationality : Indian

Marital status : Married.

No. of dependents : 5 Persons.

Date of Birth : 12th April 1986

Languages Known : English, Hindi, Telugu, and (Tamil/Malayalam/Arabic). Passport Information:

Passport No : T4013971

Residency Status : Article 18.

Passport Issue : Kuwait

Passport Validity : Valid up to 2029

Reference:

Available Upon request

Declaration:

I hereby affirm that the information furnished above is true and correct to the best of my knowledge. Date : Yours sincerely

Place : KUWAIT (RATNA KUMAR BARIGELA



Contact this candidate