To utilize my technical skills for achieving the target and developing the best performance in the organization. I would like to implement my innovative ideas, skills and creativity for accomplishing the projects.

Having 16+ years of experience in the field of Piping Design for Power plants projects.

Perform Stress Analysis for Boiler External and Non-Boiler External piping by using Caesar II.

Coordinate with other engineering activities (Internal/External) wrt interfaces for stress analysis.

Preparation of Strength Calculation for Pipes and Fittings as per ASME 31.1 & IBR.

Preparation of proposal material estimation BOQ for Machine block critical piping.

Preparation of Ordering Information for raw material and feeder material.

Conduct design reviews and design freeze for piping and support designs.

Ensure proper supporting concept for piping systems.

Selection of spring hangers and special supports.

Ensuring design modification to meet customer requirement arising out of project/contract change.

Ensuring engineering planning in line with the project schedule.

Reviewing Shop Fabrication and spool drawings for Critical Piping like HRH, CRH, FW, Condensate etc., and BOM preparation for manufacturing by ensuring project technical specification.

Reviewing pipe routing and support types wrt Stress analysis report by using PDMS & Navisworks.

Reviewing Piping Isometric, Support drawings, Equipment and Piping Layout drawings.

Detail Engineering of the boiler components.

Ensure fulfilment of design, quality, erectability and functionality at the best cost per the project and contractual requirements.

Deputation to Germany as Piping Designer for Opole 5 & 6 (Ultra-supercritical Tower Type Boiler).

Deputation to Germany as Piping Designer for NLC (Super Critical Tower Type Boiler).

3D Modeling : PDMS Version 12.0 & 12.1

Piping Stress Analysis : Caesar II

2D Drawing Generation : AutoCAD

Reviewing Software : Navis Works

Microsoft office Packages

Diploma in Mechanical Engineering in AKP, Madurai, Tamil Nadu, India - 83.5% - April 2001.

Class XII in Bishop Heber Higher Sec. School, Trichy, Tamil Nadu, India - 62.0% - March 1999.

Class X in Bishop Heber Higher Sec. School, Trichy, Tamil Nadu, India - 56.8% - March 1997.

Position : Team Leader - Piping Period : September 2012 to till date

Role & Responsibilities:

Performing Piping Stress Analysis for Boiler Inland Piping.

Preparing Strength Calculation for Pipes and Fittings as per ASME 31.1 & IBR.

Preparing MTO’s for material ordering and procurement.

Responsible for piping, supports and equipment modeling.

Reviewing of Piping Arrangement, Equipment and Piping Layout drawings.

Review of Piping Isometric and Support drawings.

Responsible for the quality right first time, on-time and complete delivery, within budget of assigned work packages, engineering deliverables, as specified by the assigner by:

-Defining the process and tools requirements & identifying the resources.

-Managing the workload received, when necessary from the different product lines.

Ensuring that the design system engineering discipline complies with the applicable rules, regulations, codes and standards and to the best engineering practices of the industry especially about environmental aspects and health & safety for site personnel, operators, maintenance personnel and third parties.

Monitoring and follow up on piping design progress.

Experience in piping erection / prefabrication. Welding procedure.

Having knowledge on ASME, IBR & EN Standards.

Projects:

Mälarenergi., Vasteres, Sweden (Flue-gas desulfurization)

Hogbytorp, Malmo, Sweden (Flue-gas desulfurization)

Bodenenergi, Sweden (Flue-gas desulfurization)

Telangana Super Thermal Power Project Phase-1 - 2 x 800 MW

Hassyan Power Ltd., (Ultra-supercritical Two Pass Type Boiler) - 4 x 660 MW

Mae Moh (Ultra-supercritical Two Pass Type Boiler) - 2 x 660 MW

Thar Block II (CFB Boiler) - 2 x 330 MW

Opole 5 & 6 (Ultra-supercritical Tower Type Boiler) - 2 x 900 MW

Neyveli Lignite Corp. Ltd., (Super Critical Tower Type Boiler) - 2 x 500 MW

Position : Engineer – Piping Period : Jan 2011 to August 2012

Role & Responsibilities:

Reviewing of piping layouts, Isometric and Support drawings.

Preparing Strength Calculation for Pipes, Headers, End Plates, etc., as per ASME 31.1 & IBR.

Responsible for Power Block and Machine Block Piping’s.

Projects:

Saradha papers & boards Pvt Ltd., BFBC

ARS Metals Ltd., - CFBC.

Dangote Industries Senegal Ltd., - BFBC.

Hexa Thailand corporation Ltd., - BFBC.

Position : Chief Design Engineer - Piping Period : August 2007 to Dec 2010

Role & Responsibilities:

Responsible for piping and arrangement for balance of plants piping.

Reviewing of Piping and Supports modeling by using PDMS.

Reviewing of Piping Isometric and Support drawings.

Coordinating design review meetings.

Schedule Monitoring and proactive follow-up on time delivery of material/documents.

Projects:

Moorburg – 2 x 820 MW, Coal Based Power Plant.

Box berg – 675 MW Thermal Power Plant.

Position : Engineer Period : August 2005 to July 2007

Role & Responsibilities:

Creating 3D model as per contract requirements, work instructions, installation guidelines and best practices comprising of equipment, civil, piping & valves, access and maintenance.

Preparation & review of General Arrangement, Piping composite and civil input drawings.

Piping and Supports modeling by using PDMS.

Preparation of Piping Isometric and Support drawings by using PDMS.

Site/Shop co-ordinations and preparation of As-built drawings.

Projects:

Sohar Aluminium Company limited, 4 Nos. HRSG for 1000 MW CCPP.

Tamil Nadu Electricity Board, 1 No. HRSG for 92.2 MW CCPP.

Gautami power limited, 2 Nos. HRSG for 469 MW CCPP.

Position : Junior Engineer Period : April 2004 to August 2005

Role & Responsibilities:

Preparation of Boiler GA, Pressure Parts Arrangement, P & I Diagram by using Auto CAD.

Preparation of Detailed Drawings for Boiler Pressure Parts and Non Pressure Parts.

Projects:

Hindalco Industries Limited - CFBC.

Jindal Steel and Power Limited - CFBC.

Chennai Petroleum Corp. Limited - Oil/Gas Fired Boiler.

Position : Junior Executive Period : Dec 2001 to March 2004

Role & Responsibilities:

Preparation of Boiler General Arrangements, Pressure Parts and Non Pressure Parts drawings.

Preparation of Composite Piping Layout, Isometric Drawings & Pipe Support Drawings as per Stress Analysis Report for Pressure Parts Piping’s and Non-Pressure Parts Piping’s.

Projects:

Monnet power Limited - WHRB.

Raipur Alloys & Steel Limited - WHRB.

Jubilant Organics Limited - FBC.

Father’s Name : A. S. Rajendran

Date of Birth : 27.02.1982

Gender : Male

Marital Status : Married

Nationality : Indian

Languages Known : Tamil, Hindi and English.

Passport Details : Z 2745438, Valid Till 16.10.2023

Communication Address : 10 G, First Floor, Pocket – B8, Mayur Vihar Phase - 3,

Delhi, New Delhi – 110096, India.

I do hereby declare that by dint of good and loyal service I shall discharge my Duties to the utmost satisfaction of my superiors and prove to be worthy of my selection, if enlisted.

Date:

Place: New Delhi Madhavan Rajendran

Objective:

Experience Summary:

Overseas Exposure:

Engineering Software Skills:

Technical and Educational Qualification:

Professional Experience:

GE Power India Limited (formerly known as Alstom Projects India Ltd.), Noida, India.

Cethar Limited, Trichy, India.

Citec Engineering India Private Limited, Chennai, India.

Alstom India Limited, New Delhi, India.

ISGEC John Thompson, Noida, India.

Cethar Limited, Trichy, India.

Personal Details:

Declaration:



Contact this candidate