Joe Fitzpatrick
Whitby, ON L*R 2V4
Cell: 709-***-****/222-9409
adbqpm@r.postjobfree.com
Education
August 2002 St. John’s, NL
Carpenters Millwright College
Journeyman Certificate
June 1985 Bay Roberts, NL
Ascension Collegiate
Level III Graduate
License and Certificates
Journeyman Scaffolder 2002
Journeyman Ironworker 1995
Field Level Risk Assessment
Leadership for Safety Excellence
Leadership in Safety Workshop
OSSA Permits
PM I
Fall Protection
Confined Space
CSTS-09
H2S Alive
Proficient in Planning and Scheduling
Microsoft Office
Professional Experience Overview
Responsible for representing the organization in dealings with client to ensure all agreements are met. Manage project in order to achieve completion safely within schedule. Supervise work teams for the delivery of daily objectives including the control of work hours, overtime. Participate in regular meetings to identify problems, target dates, forecast and resolve possible delays .Ensure all aspects of work are understood by all concerned parties. Successfully supervised, managed and scheduled a labour force of 100 plus.
Employment History
Nov 2018 - Jan 2018
Aluma Systems Napanee, ON
Foreman
Aug 2018 - Oct 2018 Mississauga, ON
Jacobs Industrial
Foreman
Jan 2016 - July 2018 NWR, AB
Fluor Constructors
Scaffold General Foreman
Responsibilities include but not limited to coordinating assigned work with work of different crafts, departments or other contractors. Maintaining liaison with engineering, estimating, planning and scheduling to ensure work complies with drawings, specifications, cost and schedule. Assist in resolving construction problems (lack of productivity, work interfaces etc.) as required. Assist in the development of look ahead scheduling and progress reporting. Supervise and evaluate foreman to insure compliance with project directives. Ensure foreman and crew perform work in compliance with drawings, specifications and procedures. Requisition manpower from the Craft Personnel & Training Department. Assist the Craft Personnel and Training Department with training or craft personnel. Monitor craft compliance with project safety process requirements, document and ensure corrective measures are implemented. Maintain liaison with other departments (i.e.: Material Controls, Purchasing, QC and Engineering) to ensure all required materials, equipment, inspections etc. Support craft activities and project schedule. Perform additional assignments as per supervisor’s direction.
Aug 2015 - Jan 2016 Suncor, AB
Aluma Systems
Scaffold Inspector/Scaffold Foreman
Responsible to identify training needs, develop, conduct and deliver training on scaffolding. To provide expert advise to the projects with regard to the preparation, erection, alteration and dismantling of scaffolding and ensure proper implementation of safety procedures. To conduct site safety inspections, audits, risk assessment & analysis on a regular basis. To conduct all scaffolding accident and incident investigations in accordance with company policies and procedures to suggest corrective and preventive actions with detailed plan to implement with defined roles, responsibilities and time frame. To undertake evaluation of new and existing scaffolding equipment to ensure it meets accepted standards.
Feb 2015 - Aug 2015 CNRL, AB
Standard Scaffold and Insulation
Scaffold Foreman
Provided strong safety supervision with the relevant information instruction and training to ensure competence. Ensured usability and safety of system erected and ensuring zero accident at all times.
Performed scaffold inspection to certify the usability of the scaffold and to advise for rectification measures.
March 2014 – December 2014 Cold Lake, AB
JV Driver
Scaffold and Insulation General Foreman
Oversaw and coordinated cost effective scaffold system. Responsible for 6 foreman 50+ manpower in the day to day operations for pre shutdown, shutdown and start up.Tracked all projects via Excel spreadsheet. Assessed Foremen and crews readiness for their role at the onset of each shift. Assigned Shift Work Assignments to Foremen while being cognizant of productivity and quality. Coordinated manpower movement within my area of command. Verified all workers have received proper training.Ensured any permitting requirements were in place prior to work activity and that crews were provided the proper PPE. Verified daily time sheets.
June 2009 – January 2014 Kearl Lake, AB
Aluma Systems
Scaffold Superintendent
Responsible for four General Foreman 200+ manpower in the day to day operations for new construction of the Extraction Plant and Tank Farm for Phase I and II from ground to completion including commissioning for start up. Developed a strong understanding of the clients engineering specifications. Ensured all personnel were aware and performing up to safety expectations. Attended coordination, safety, planning and schedule meetings. Constantly assessed the General Foreman and his/her crews construction methodology. Developed a strong understanding of the clients engineering specifications. Ensured all personnel were aware and performing up to safety expectations. Verified all workers have received proper training.Ensured any permitting requirements were in place prior to work activity. Competent in reading and understanding specifications and drawings.Familiar with and enforces strict compliance with QA/QC and Safety procedures plus all company rules and regulations. Developed excellent working relationships with client other department personnel. Engaged in proactive communication with the crews. Ensured all work was within conformity to standards and specifications.
August 2008- May 2009 Bull Arm, NL
Safway Scaffolding
GBS Oil Rig Scaffold Foreman
Responsible for 10 to14 men. Provided strong safety supervision with the relevant information instruction and training to ensure competence in our workforce, Ensured usability and safety of system erected and ensuring zero accident at all times.
Performed scaffold inspection to certify the usability of the scaffold system and to advise and plan for rectification measures.
January 2007 - July 2008 CNRL, AB
Berry Y & V
Scaffold Superintendent
Responsible for three General Foreman 100+ manpower in the day to day operations for new construction of the Extraction Plant and Tank Farm for Phase I and II from ground to completion including commissioning for start up. Developed a strong understanding of the clients engineering specifications. Ensured all personnel were aware and performing up to safety expectations. Attended coordination, safety, planning and schedule meetings. Constantly assessed the General Foreman and his/her crews construction methodology. Developed a strong understanding of the clients engineering specifications. Ensured all personnel were aware and performing up to safety expectations. Verified all workers have received proper training.Ensured any permitting requirements were in place prior to work activity. Competent in reading and understanding specifications and drawings.Familiar with and enforces strict compliance with QA/QC and Safety procedures plus all company rules and regulations. Developed excellent working relationships with client other department personnel. Engaged in proactive communication with the crews. Ensured all work was within conformity to standards and specifications.Reviewed quantities and materials received or used during specified periods to ensure full compliance with QA/QC inspection plans and procedures. Identified “on-the-job” training programs with the aim of developing and improving team members.
August 2006 - December 2006 CNRL, AB
Panels and Pipes
Scaffold General Foreman
July 2004 – March 2006 CNRL, AB
Kiewit Energy
Scaffold Foreman/General Foreman
November 2002 – December 2003 Voisey Bay, NL
Adam Clarke
Journeyman Scaffolder
References available upon request.