Post Job Free
Sign in

Plant Manager

Location:
Prairieville, LA
Posted:
February 08, 2020

Contact this candidate

Resume:

JOEL

JACKSON

** ******** ****

Hattiesburg, MS 39401

16

601-***-****

*************@*****.***

OBJECTIVE

An extraordinarily motivated and performance-driven individual whom possesses impeachable leadership skills with excellent performance that inspire and encourage colleagues, offering more than eight years of experience as a pipe fabricator, equipped with in-depth knowledge of different tools and their function. With extensive knowledge and a reputation for completing tedious projects under tight timelines with high accuracy and success, I am seeking a Pipe Foreman position with a company where I can continue to grow and expand the company.

EDUCATION

AAS in Machine Tool Operation/Machine Shop Technology PEARL RIVER COMMUNITY COLLEGE

EXPERIENCE

Pipefitter Wyatt

APRIL 2019-PRESENT

Assisted in the installation of stainless steel piping systems in the truck receiving area.

Moved to main unit and began installing all 21/4 chrome pipe supports Fab and installed carbon, stainless steel, and11/2 chrome pipe in sizes 1/2 in to 12 in.

Built and installed supports surveyed all supports and shot in elevation throughout plant.

Worked with certified pipe welders by providing accurate pipe preparation and fitting

Pipefitter TimeC

JUNE 2017- MARCH 2019

Assisted in the installation of stainless steel piping systems in the truck receiving area.

Moved to main unit and began installing all 21/4 chrome pipe supports Fab and installed carbon, stainless steel, and11/2 chrome pipe in sizes 1/2 in to 12 in.

Built and installed supports surveyed all supports and shot in elevation throughout plant.

Worked with certified pipe welders by providing accurate pipe preparation and fitting

Pipe Foreman Bechtel

AUGUST 2014– MAY 2017

Supervised 14 hands in the building of piping systems for unit consisting of plant air, instrument air, nitrogen, and pump stations.

Over saw the ordering of material and equipment needed for job.

Obtained precise results by performing accurate hydro testing.

Worked with certified pipe welders by providing accurate pipe preparation and fitting.

Installed valves, hangers, supports and flanges inside piping systems.

Reported the quality of performance on site to all site construction managers

Pipe Foreman CB&I

JULY 2010 – JULY 2014

Eliminated risks by correctly identifying potential safety hazards.

Interpreted blueprints to determine locations, quantities and sizes of materials required.

Secured pipes to structures with clamps, brackets and hangers.

Obtained precise results by performing accurate hydro testing.

Supervised 18 hands from start through start up.

SKILLS

Coordinate with job site manager to configure pipe system layout

Fix and alter orders; measure, mark, cut and repair pipe to fit the specifications using tools such as saws, cutting torches, and pipe threads and bender

Test pipes to check for leaks and fixed pipes as necessary

Secure pipes to radiators, tanks, walls, and fixtures using: brackets, clamps, tools, or welding equipment

List one of your strengths



Contact this candidate