Post Job Free
Sign in

Mechanical Engineer Manager

Location:
Shivaji Nagar, Maharashtra, India
Posted:
February 08, 2020

Contact this candidate

Resume:

Page * of *

CURRICULUM VITAE (CV)

Proposed Position : Mechanical Engineer

1. Family name : Lanjwar

2. First names : Ritesh

3. Date of birth : 26/01/1977

4. Nationality : INDIAN

5. Civil status : Married

6. Education :

Institution Ujjain Engineering College Ujjain M.P. Date Mar 2003

Degree(s) or Diploma(s) obtained B.E.(Mechanical)

Other trainings:

Entrepreneurship Development Training Programme at CEDMAP Ujjain Centre organised by Directorate of Industries M.P. Government.

7. Language skills; mark 1 (worst) to 5 (best) for competence: Language Reading Speaking Writing

Hindi 5 5 5

English 5 4 5

8. Membership of professional bodies: No

9. Other skills:

certification of entrepreneurship development training programme CEDMAP (Centre for Entrepreneurship Development Madhya Pradesh) at Ujjain (M.P) organised by Directorate of Industries Madhya Pradesh Government in the year 2015.

Certification in fundamentals of DOS,M.S. Office, LAN by the Authority of the governing council for Academic Affairs and recommendation of the websity faculty at Ujjain centre in the year 2001.

Actively involved in the formation of Alumni Association of Ujjain Engineering college Ujjain (M.P.)

Participated in N.C.C. (NATIONAL CADET CORPS) Annual Training Camp junior division held at Ujjain (M.P.) in year 1992

10. Present position: proprietor

11. Years within the firm: more than 3 years

12. Key qualifications (relevant to the project):

worked as a consultant in EWPL Gas Pipeline project (East West Gas Pipeline) Reliance in Pune( Maharashtra).

Worked as a consultant in 125 M.W. Grid interactive PV Solar Power Project at sakri Maharashtra client MAHAGENCO (Maharashtra Generation Company).

Area of expertise includes project management, Planning, execution, Design Reviews & Construction Supervision and Operation & Maintenance of mechanical components of industrial machines, water supply, waste water components & Pumping Station P.H.E.(Public Health Department) . experience in Installation of Mechanical component for waste water treatment plants and sewerage pumps. Page 2 of 5

13. Specific country experience:

Country Date

India 03/2003 to till date

14. Professional experience record (projects):

From March 2014 to till Date I am doing my own business and from more than three years I started Bhawin Engineering Works an engineering workshop as a vendor of VE commercial Dewas (M.P.).Gabriel India Ltd. Dewas (M.P.) we are doing tooling works for them and develop all other mechanical component as per their requirement. We are also doing reverse engineering and Maintenance work for industries and Sewer Water pump station with contractors of P.H.E. (Public Health Engineering) department Ujjain (M.P.)

Maintenance of 400 H.P. 8MGD sewer water pump station, line size Ø250 mm. suction and delivery, 7.62 m. head and 100 H.P. 4 M.G.D. sewer water pump station.

200 H.P. 940 R.P.M. motor and 6 M.G.D. pump 01 no.,150 H.P. 1440 R.P.M. and 4 MGD pump 01 no. and 50 H.P. 940 R.P.M. and 2 M.G.D. pump is installed.

My role is to provide technical support to the technical team of contractor to rectify the causes of failure and also provide the related maintenance services at optimal minimum cost and time.

Installation of pump as per drawing and specification.

Suggest and support them to Prepare and always ready with the backup at peak hours and always maintain obstacle free suction side for obtaining better performance of pumps.

Monitored all corrective, preventative, and predictive maintenance activities related to Mechanical & Instrumentation, and control systems to ensure the safe, efficient, and reliable operation of the facilities.

Planned defined & implemented strategies/policies and achieved operational expense reduction.

Trained the contractor’s technical staff in the Water and Waste Water Treatment Industry in everything from basic to advanced practices.

Preparation of quotation for maintenance work of pumps and other related mechanical components.

Purchasing of raw material, consumables and tooling. Date Mar 2012 to Nov 2013

Location Sakri Maharashtra

Company TUV- SUD Pvt. Ltd.

Position Manager(Consultant)

Description 125MW Grid interactive solar PV power Project at Shivaji nagar Sakri District Dhule Maharashtra.

Check the progress of work in tandem with resources used during the project viz. Manpower, Plant and Material. Also forecast probable trend of the project inline with the current progress of work, actual cost of resources and variations. Proposed cost saving solutions and optimized use of resources, at the same time never letting quality of work to be compromised at any interval of time.

Inspection and testing of civil work like layout and levels as per drawing cube test and other as per specification.

Inspection of material as per drawing and approved vendor.

Preparation of report by compilation of relevant data and actual results.

Page 3 of 5

coordinating daily activities with other members of the team.

Client communication and management.

Date April 2011 to February 2012

Location Ahemdabad Gujrat

Company HP Patel construction company Rajkot Gujarat Position Site Manager

Description Execution of domestic connection P.E. laying Ф 125,90,63,32 mm.as per drawing and specification, Execution of almost 90 km 2500 Nos. Of connection with testing & commissioning.

coordinating daily activities with other members of the team.

Client communication and management.

Maintain documentation.

Proper planning as per client work order

Date Oct 2010 – Mar 2011

Location Mumbai Maharashtra

Company Unity Infra Projects Ltd.

Position Asst. Manager

Description Tansa Tanila pipeline project (E.P.C. Project) under inspection of M.C.G.M.(Municipal Corporation of Grater Mumbai)

Worked under the direction of project manager to prepare studies and process model.

Worked under supervision of project manger and senior level team members

Worked successfully within a team environment and communicate effectively with other project team members and client

Reviewing design for water system.

Client communication and management.

Supervising and supporting junior level technical staff.

Tracking and maintaining project task and schedules.

Meet established budgets and delivery schedules for each assignment for project task scope schedules and budget.

Oversee and manage project to ensure work output is of a technically high standard.

Date December 2008 to September 2010

Location Haryana

Company D Samar Brothers

Position Site Manager

Description Sultanpur Neemrana Gas pipeline projects client GAIL

Planning and execution of all pipeline activities like survey, grading, stringing, mainline welding, trenching, field joint coating, lowering, tie-in welding & backfilling etc. as per the specification. Page 4 of 5

Client communication and management.

Monitoring and supervise daily activities and reporting to senior level management.

Date Sep 2007 to Oct 2008

Location Pune Maharashtra

Company Reliance

Position Manager (client and consultant)

Description Execution of East West gas pipeline project (EWPL 48”dia, length 1386 kms.)

Streamlining feasible plans for smooth operations and resolving the operational bottleneck for accomplishment of short-term targets.

Managing skill of Field Engineers and surveyors.

Carrying out inspection of various operational activities like grading, trenching, stringing, welding of joints and preparing corrective action plans.

Lowering of welded sections inside the trench.

Installation of manhole, hand hole for optical fibre cable.

Proving of duct and blowing of optical fibre cable. Date Mar 2003 to sep 2007

Location Assam,W.B.,Gujrat

Company D.C.Pipeline

Position Project incharge

Description Gas pipeline projects

1. Dia. 12 inch gas pipeline project under A.G.C.L.(Assam Gas Company Ltd.) 2. Dia 18 inch gas pipeline Project under H.P.C.L. (Hindustan Petroleum corporation Ltd.)

3. Dia 16 Inch gas pipeline project under OIL India Ltd.

mobilisation of camps for labour.

planning and execution of all the pipeline activities as per specification.

coordinate with all the teams related to the activities as well as consultant and client.

maintaining documents and preparation of RA bills.

Conducting WQT(Welder Qualification Test),EQT (Electrode Qualification Test) and cube test to check the quality of work. 15. Others (e.g. publications): No

16. Certification:

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

05/10/2018

[Signature of staff / expert] [Day / Month / Year] Page 5 of 5

[Signature of authorized representative] [Day / Month / Year]



Contact this candidate