MUHAMMAD HARIS
B.SC. Electrical Engineer
Email: **********@*****.***
Cell: +971-********* / +971-*********
Passport No: FY6912981 (Expiry: Dec24,2023)
Visa Status: Visit Visa (Expiry: March25,2020)
Address: International City (Spain Cluster 02) DUBAI
Career Objective:
To secure a career in a reputed organization, which appreciates professional approach and hard work, where I can utilize my knowledge, various skills & experience in contribution towards fulfilling the company’s growth objectives, develop my career and excel in the field of Electrical Engineering. Hope for positive response.
Education
B.SC. ELECTRICAL ENGINEERING FROM UNIVERSITY OF ENGINEERING AND TECHNOLOGY PESHAWAR.
BUILDING MANAGEMENT SYSTEM (BMS).
HUAWEI CERTIFIED NETWORK ASSOCIATION (HCNA).
(C.No. 0101001016238076547392480)
CCNA.
PROFESSIONAL WORK EXPERIENCE 5 YEARS
Since Aug 2017 –Nov2019 ABBAD Associates Peshawar – working as a Electrical Engineer.
Position: Electrical Inspector:
RESPONSIBILITIES:
Monitoring and inspecting the installation of all Electrical underground services.
Inspects the installation and testing of Electrical activities conducted by sub-contractors.
Monitor and evaluate electrical testing such as insulation resistance and Continuity test of cables.
Preparing lighting designs and calculations, as well as power distribution, structured cabling, fire alarm systems, and security system designs.
Field checks installation and location of electrical equipment, electrical duct, conduit, cable, panels and other components of the electrical system being installed. Assures compliance with approved drawings.
Reviews project contract documents and monitors construction activities to ensure compliance with project specification.
Submit report on site progress to Resident Engineer.
Identify nonconformities in materials, & site installation works and issue the non-conformance report (NCR) to contractor.
Conduct QC inspection and testing based on the approved Checklist and Method Statement.
Monitor and supervise contractor's activities to ensure their works comply with project specification and authority standards.
Prepare initial and final punch list for electrical activities at site before calling client for final inspection and handing over.
Work as an Electrical Engineer at PAKISTAN TELEVISION CORPORATION (PTV) Landikotal
RESPONSIBILITIES:
Rebroadcasting.
Evaluate Electrical Systems, Products, and Components etc.
Provide good signal while transmission.
Coordinating and planning the installation, maintenance, and operation of broadcast television equipment and facilities.
Work in broadcast studios during show segments and television episodes.
Working as an Electrical Engineer at PESHAWAR ELECTRIC SUPPLY COMPANY (PESCO)
RESPONSIBILITIES:
Supervising the testing and commissioning works in 400kv, 110kv, 132kv substation and power station.
Main Bus bars various connection to station transformer.
Maintenance of Grid power factor
Primary & secondary coils winding Designs.
Maintenance of Oil used in transformers.
Attend all sorts of break downs in the grid station
Designing of Star & Delta connection.
Main Bus bars various connections to stations transformers.
Attend all sorts of break downs in the grid station.
Overhauling of Tape changers during approved shut down on T/F’s.
PROFESSIONAL WORK EXPERIENCE: Working at MULTINET Pvt Ltd MARDAN as a NETWORK ENGINEER
RESPONSIBILITIES:
Strong knowledge about Routing Protocols LAN/WAN Technologies, OSPF, EIGRP and RIP etc.
Create and Configure Networks. With experience and knowledge of Cisco routing and switching, Cisco network engineers install, maintain, and configure Cisco networks.
Establish the networking environment by designing system configuration, directing system installation and defining, documenting and enforcing system standards.
Resolve Technical Issues.
Test and Evaluate Software.
Assess Network Performance.
Routing Experience.
Knowledge of switches.
Skills
Networking
HCIA
HUAWEI CERTIFIED
C.No. 0101001016238076547392480
CCNA
FROM IT ALROUNDERS
Other-Skills
BUILDING MANAGEMENT SYSTEM
AutoCAD
CISCO PACKET TRACER
MS WORD
MS POWER POINT
PLC
Individual Projects:
FEASIBILITY OF GRAVITATIONAL FORCE BASED AUTOMATIC POWER GENERATION MACHINE.
Languages:
S.No.
READING
WRITING
SPEAKING
1.ENGLISH
EXCELLENT
EXCELLENT
EXCELLENT
2.URDU
EXCELLENT
EXCELLENT
EXCELLENT
3.PASHTO
EXCELLENT
EXCELLENT
EXCELLENT
Personal Information:
Nationality: Pakistani
Religion: Islam
Date of Birth: 11 June, 1994
Contact #009***********
Marital Status: Single
Availability: Immediate
Registered with Pakistan Engineering Council (PEC)
Valid Pakistan Driving License
Add: International City DUBAI (Spain Cluster 02)
Note: All my documents are verified from concern departments i.e. U.A.E EMBASSY, Higher Education Commission of PAKISTAN, IBCC, Foreign Office &, BISE Peshawar.