Post Job Free

Resume

Sign in

Engineer Civil Engineering

Location:
Algiers, Alger, Algeria
Posted:
February 02, 2020

Contact this candidate

Resume:

Akli Hadjoumeur

** *** ***** ******** ***** alger

Algeria.

Cell: 002***********

Email: adbjyf@r.postjobfree.com Personal Email : adbjyf@r.postjobfree.com

Career & Education :

ALGERIA /01/2017 at now : H-Immo (www.hebbacheimmo.com)

Manager Project:

direct and Coordinate the activities of the Projects to ensure that goals, objectives are met within the prescribed time frames and funding parameters.

Establishing staffing requirements and allocating available resources

Establish a work plan and staffing for each phase of the projects and organize the assignment of project staff.

Review status reports prepared by project staff and modify schedules or plans as mandatory fields.

Convene meetings with project staff to provide technical advice and solve problems.

Responsible for overall quality and project management. Supervise the budget, ensure financial accountability.

Recognize and resolve potential problems and evaluate the effectiveness of the project / program

CANADA .06/2006 – 12/2016 CIMA + (www.cima.ca):

Assistant Project Manager, Transport / Bridges

Represent manager project in site

Review shop drawing to ensure compliance with contrat requirement.

Ensure work is produced to the desired standartd.

Review contractor submitals.

Monitor all site activites and ensure quality record are kept up to date.

Make sure all site inspections are carried out.

Attent weekly meeting.

Preparation of monthly reports.

Preparation of applications for payments.

CANADA :2005 - 2006 Qualitas Group: Civil Technician SNC-Lavalin Supervision of work

Quality control materials

Report writin

CANADA :2004 - 2005 Terratech SNC-Lavalin (www.snclavalin.ca):

Laboratory Technician

Materials testing

Report writing

CANADA : 2003 and commercial IND LAB:

Civil Technician (Intern)

ALGERIA :CTCcentre 2001-2002 (www.ctccentre.com)

Engineer-controller

Technical supervision of works (plans-implementation)

Followed by the billing and collection.

Activity reports of the projects supported.

ALGERIA :1997 - 2001 CERGC (board design and production in civil engineering):

Site Engineer

Studies of the structures.

Monitoring compliance of work with the drawings.

Coordination between different sites. Attend meetings on site.

Preparation of reports.

Training :

1994 Engineer, civil construction and

industrial (Algeria)

Continuing education (10 years)

2011 Inspection of superstructures signaling Laval University in Quebec City(Canada)

Maintains structures 2010, University Polytechnique de Montreal CANADA

2009 Inspection of structures, University Polytechnique de Montreal CANADA

2008 work likely to emit asbestos dust, AKT Training Inc.

2008 Construction and repair of structures, Continuing Education, Ecole Polytechnique de Montreal CANADA

2008 Use of restraints in work zones (MTQ), AQTR

2008 Courses "Contractor Orientation Course - Orientation of entrepreneurs," CN Safety (map Expiration: August 2011)

2006 Work Area Traffic Control (supervision), STC-102, AQTR

2006 Managing the impacts of road works on traffic, STC-201, AQTR

2005 ACI (American Concrete Institute) (for testing concrete).

2002 Health and Safety Course on construction sites, CSST Auto CAD

2000 SAP (Structural Analyst Program)

2000 AUTOCAD.

Achievements

Repair / rehabilitation of structures (bridges, viaducts, tunnels)

Rehabilitation of structures exchanger Anjou in Montreal - Phase 2,

construction supervision, MTQ, 2011(17.5 MCAD in progress).

Rehabilitation of structures exchanger Anjou in Montreal - Phase 1,

construction supervision, MTQ, 2009

Shoring and repair of structures exchanger Angrignon in Montreal, supervision, MTQ, 2008

Rehabilitation of bridge structures Clément, Jean-Milot, Wanklyn, Stinson, Airlie and Lafleur, the structure of the input Airlie, the pedestrian tunnel and pedestrian bridge on Highway 138 between the Mercier Bridge and Street Clément in Montreal, supervision, MTQ, 2007

Partial repair of structures and emergency work in Montreal, surveillance, MTQ, 2006-2009

Rehabilitation of structures Viau, above Highway 40, between the exchanger and Anjou Pie-IX Montreal, supervision, MTQ, 2006

Rehabilitation of structures Langelier, above Highway 40, between the

exchanger and Anjou Pie-IX Montreal, supervision, MTQ, 2006

Rehabilitation of structures Lacordaire, above Highway 40, between the

exchanger and Anjou Pie-IX, Montreal, supervision, MTQ, 2006

Construction / reconstruction of structures (bridges, viaducts, tunnels)

Reconstruction of the bridge fountain Pre-Prévost Laval, surveillance, MTQ, 2007 2008 (12 MCAD)

Hochelaga reconstruction of the bridge over the A 25 in Montreal - Phase 2 monitoring, MTQ, 2007 (15 MCAD)

Evaluation of road structures :

Partial repair of the structures of the Turcot Interchange in Montreal,

inspection and survey of damage, MTQ, 2006 2010

Partial repair of structures exchanger Anjou in Montreal, inspection and survey of damage, MTQ, 2006 2010

Partial repair of the structures of Metropolitan Boulevard in Montreal, inspection and survey of damage, MTQ, 2006 2010



Contact this candidate