Post Job Free

Resume

Sign in

Mechanical Engineer

Location:
Dubai, Emirate of Dubai, United Arab Emirates
Posted:
February 01, 2020

Contact this candidate

Resume:

M.AMMAD BUTT

Mechanical Engineer.

OBJECTIVE:

A Young Engineer wants to be a part of organization where there is healthy growth and competitive environment to apply his skills, efforts, technical and analytical expertise effectively. CAREER PROFILE/SKILLS:

• Responsible, Self-motivated and Loyal to work.

• Ability to work under pressure and to quickly understand, analyze and solve complex problems.

• Ability to deal with workers and have strong team leadership and management skills.

• Have computer-aided drafting skills.

• Excellent Communication skills. Communicate in a precise and structured way.

• Have a strong attention to detail and accept responsibility for the result.

• Ability to work in a collaborative and diverse team environment. WORK EXPERIENCE:

Worked at Fast Cables in maintenance department from (SEP 2017- SEP 2019) Fast Cables Limited has emerged as Pakistan’s leading and most trusted electrical cable manufacturer dealing with HV, MV and LV CABLES. Also dealing with CCV line technology with is very rare in Pakistan and fast cables is the first company that uses this technology. JOB RESPONSIBILITIES:

Worked as a Maintenance Engineer Mechanical at fast cables. Responsibilities with are assigned to me as are follows 1.To manage trouble shooting: to manage and overcome the problems which come in running machines in such a way that production do not disturb

2. Preventive maintenance: a planned schedule been made for the preventive maintenance of machines according to their running hours to do machines preventive maintenance on their time of completion hours, 3. Corrective maintenance: to check and visualize any problem like abnormal sound from bearing, greasing/alignment of machine at correct time to avoid any major problem 4. Cooling tower erection: erection of cooling tower in 2nd quarter for the supply of chilled water to extruder machines along with water pipelines

5. Water pumps erection: erection of water pumps for the supply of water to cooling tower and extruders from tank of capacity almost 20,000 liter in 2nd and 3rd quarter. 6. Erection of storage tanks: fabrication and erection of storage tanks for DOP, DIDP, PARAFFIN for PVC plant. The capacity of storage tanks is 2.5, 4 and 5 ton

7. Documentation on daily basis work: report of daily basis work, preventive and corrective maintenance report and documented work to my manager as per planned schedule. 8. To manage all targets in given time: to do all assigned work in a given time and target to achieve the best results 9. Inspection of cranes: inspection of hoist cranes on weekly basis to avoid any abnormality regarding load capacity, gear boxes and safeguard

Phone: +971-**-***-****

Email: adbjhe@r.postjobfree.com

Address: Abibakar bin abi shiba, Street 09, Villa 05, Qadisiya, Sharjah CNIC: 34101-5503464-1

10. Safety purpose: most important from my responsibilities is to keep the safety purpose, first of worker than of machine to avoid any mishap regarding mechanical or electrical point before start or during work 11. Purchase and service indents: maintains inventory list for all machine parts that help us to keep a complete record of all spare parts used along with their specifications and regularizing all service and purchase indents for repair/service of a machine part.

Achievements:

1.Erection and commissioning of PVC PLANT capacity 36 tons/day 2.Erection and commissioning of Tubular machine B 07 3.Erection and commissioning of Stranding machine B 37 4.Installation of Cooling tower

5.Installation and commissioning of Hoist cranes

6.Fabrication of storage tanks for DOP, DIDP and PARAFFIN 7.Installation of ventilation system for PVC PLANT 8.Work on ducting and insulation system

9.Calculation of dimensions for ducting system of complete PVC plant 10.Calculation of dimensions for complete ALUMINIUM plant including whole shed, cranes and exhaust system Internship:

Internship program at KSB PUMPS in marketing department at head office Lahore. June 2016-july 2016 During internship have visit to Hadyara, Shaukat Khanum, Shareef city Lahore for installation of pumps ACADEMICS:

B.Sc. Mechanical Engineering: UET LAHORE CGPA 3.24/4.0 2013-2017 F.Sc. Pre-Engineering: Punjab College of Sciences GRW Percentage 79% 2011-2013 Matriculation: Jadeed Dastagir Ideal High School Gujranwala. Percentage

87.38%

2009-2011

Final Year Project

Experimental analysis on the exhaust of four stroke diesel engine by intake air humidification to reduce exhaust gases. INDUSTRIAL VISITS:

Chenab Foundry Faisalabad

Honda Atlas Sheikhupura

Chaudhary Sugar Mill Gojjra

Ijaz Spinning MILL Sheikhupura

COMPUTER PROFICIENCY:

MS Office (Word, Excel, PowerPoint)

INTERESTS:

Newspaper, Magazines, Novels, Football, Cricket, Swimming Socializing Extra-curricular activities REFERENCE

MUHAMMAD BILAL GENERAL MANAGER AT FAST CABLES PAKISTAN +92-320-*******) IRFAN ANWAR SR. MANAGER AT FAST CABLES PAKISTAN +92-300-*******)



Contact this candidate