Post Job Free

Resume

Sign in

Warehouse Sr. Supervisor

Location:
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates
Salary:
4500
Posted:
February 01, 2020

Contact this candidate

Resume:

R E S U M E

NAME: Yulito A. Delos Reyes

CONTACT NO.: Personal C.P. No. UAE: +971-***-******, PHIL.: +639-****-***** / +639-****-***** Company Tel. Office No.: +971-*-*******, Fax No. +971-*-******* E-MAIL ADDRESS: Personal: adbje6@r.postjobfree.com, Company: adbje6@r.postjobfree.com CITIZEN : Filipino

SEX : M

DATE of BIRTH : September 30, 1961

AGE : 58 Yrs Old

PLACE OF BIRTH: Cabanatuan City, N.E., Philippines PASSPORT NO.: EC6493513 DATE of ISS.: 15 Jan. 2016 DATE of EXP.: 14 Jan. 2021 PLACE of ISS.: P.E. AUH ADDRESS (Home): Villas Block-4 Lot 2, San Agustin Groove Subdivision, Aguinaldo Hi-Way, San Agustin 2, Dasmarinias City (Zip Code 4114) Cavite, Region 4, Philippines

(Current Office): ALLIANCE SCRAP TRADING LLC. / PGI GROUP Elite Business Investment, Office No. A-5,

P.O. Box 128414, Musaffah 44, Abu Dhabi

U.A.E.

POSITION DESIRED: 1. Logistic & Warehouse Sr. Supervisor 2. Material Technician & Inspector (QA/QC)

OBJECTIVES:

Can MANAGE LOGISTICS SUPPLY & DEMMAND required by the Construction Projects (EPC), Manufacturer Production and Maintenance Services including reducing the COST & FREIGHT of Materials and EXPEDITING Purchase Order to minimize Delivery Time is concerned. Can MANAGE Large Scale of multiple WAREHOUSE & LAY-DOWN YARD AREA from TURNKEY up to OPERATIONAL including MANAGING accurate Material STOCKS & MOVEMENT Operation (Receiving, Stocking, Issuing, Return & Inventory Report), WAREHOUSE and LAYDOWN MATERIAL BIN LOCATION PLANNING, SUBMITTAL of DAILY, WEEKLY, MONTHLY & YEARLY PROGRESS REPORT, Managed WHSE MANPOWER with DUTIES & RENSPOSIBILITIES Task, Maintain CLEAN FACILITIES & UTILITY, Control Proper EQUIPMENTS such as FORKLIFT (1 - 10T), Overhead & Mobile CRANE (1 - 120T) including TASK Lifting Procedure (Loading and Unloading Lifting Plan), Material PRESERVATION Maintenance (indoor & Out door in DRY & WET material condition) and (HSE) Health, Safety & Environment is concerned.

(CV’s Page 1 of 5)

WORK EXPERIENCE:

1). OCTOBER 02, 2019 up to PRESENT (Currently 03 Months): POSITION: PROJECT COORDINATOR

COMPANY: ALLIANCE SCRAP TRADING LLC / PGI GROUP

Elite Business Investment, Office No. A-5

P.O. Box 128414, Musaffah 44, Abu Dhabi,

U.A.E.

CONTACT Tel. No.: +971-*-*******, Fax No. +971-******* COMPANY: The COMPANY is engaged in BUYING & TRADING of Material Scrap Recycling Business Ind. DUTIES & RESPONSIBILITIES: Is to OPEN Dealing and Coordinate to the Oil & Gas Projects Company that Finish or End of Projects that prospect to disposed their remaining surplus/scrap materials at Site.

2). APRIL 2011 – JUNE 2019 (08yrs & 2 Months):

POSITION: MATERIAL CONTROLLER & HAND-OVER SUPERVISOR COMPANY: GS Engineering & Construction Corp.

ADNOC Ruwais Refinery Restoration Projects

P.O. Box 11783, Abu Dhabi,

United Arab Emirates

CONTACT Tel. No. +971-*-***-****, Fax No. +971-*-***-**** COMPANY (Complete 02 Projects): The COMPANY is engaged in Multi-Billion U.S. Dollar Projects for the Engineering, Procurement & Construction (EPC) and General Contractor for the RFCC and Associated Refining Units such as UNSATURATED LPG TREATENING, OLEFINS CONVERSION, ALKYLATION, BUTANE ISOMERISATION, SULFURIC ACID REGENERATION, C4 PREPARATION, ETHYLENE & PROPYLENE RECOVERY of Oil & Gas Refinery Projects (ADNOC RRE2 & RRW Proj.).

DUTIES and RESPONSIBILITIES: 1st. ADNOC Ruwais Refinery Expansion-2 Project and working in GS E&C Material Dept. as Overall Material Controller Supv. (All Discipline) and supervised Warehouse & Yard Lay-down Area operation activities until END of Projects.

2nd ADNOC Ruwais Refinery West Restoration Project and working in GS E&C Project Control Dept. as Material Hand-over Supervisor and responsible for the GS E&C Hand-over Team activities including OEM/Vendor CLAIMS found with Material Technical Discrepancies Specification and Damages. Hand-over of ADNOC SPIR Materials, INSURANCE Spares and SPECIAL TOOLS are Totally DELIVERED and ACCEPTED by the Company (ADNOC). TASK PROJECT ACHIEVEMENT: GS E&C ADNOC RRE-2 Project – Fully Supervised, Controlled, Monitoring & Assist the Material operation activities. And all Materials including Spare Parts, Oil, Catalyst, Chemicals & Equipments completed issued at Site from Start the Construction period up to Turn Over Project to the Company (ADNOC) without any serious problem in the Warehousing and Workflow activities. Also monitoring the Loading and Un- loading of Heavy Equipments with Maximum Weights Load up to 1,907 Tons with Length of 176 Meters without any incidents of accident reports during the task performing operation period.

(CV’s Page 2 0f 5)

GS E&C ADNOC RRW Project – Complete Hand Over to Clients (ADNOC) the SPIR Material Order with Total 185 Purchase Order Number and with Total 14,168 Line Items complete delivered to Company with Joint Inspection by the ADNOC End-user and ADNOC Material Engineering Dept. (MED). All SPIR Orders ACCEPTED by the Company ADNOC and INVOICED.

Same as the INSURANCE SPARES with Total Twenty (20) Different Package of Insurance Spares Orders with 469 Line Items such as Large Turbine & Compressors, Various of Warehouse Spare Pumps, Boiler Tube & Pipes, Electrical & Instrument Equipment Spares.

Same as the SPECIAL TOOLS with Total 1,096 Line Items in Different Package such as Mechanical, Electrical & Instrument Special Tools. Totally Completed Hand-over to Company and all ACCEPTED by End-User (ADNOC Ruwais Refinery West).

3). SEPTEMBER 2006 – NOVEMBER 2010 (04yrs & 2 Months): POSITION: YARD and WAREHOUSE SUPERVISOR

COMPANY: CHIYODA-TECHNIP Joint Venture

(Ras Gas Train 6-7 & Al Khaleeds LNG Proj.)

P.O. Box 24374, Ras Laffan Industrial Area,

State of QATAR

COMPANY (Complete 03 Projects): The COMPANY is Joint Venture Project together CHIYODA Japan and TECHNIP France and General Contractor (EPC) of Multi-Billion U.S. Dollar Projects for the Three (3) Refinery Construction Project (RGX- 6 & 7 and AKG-2).

DUTIES and RESPONSIBILITES: Working in Material Department and supervised warehouse and Laydown Area for Mechanical, Statics, Equipments and Spare Parts such as Bulk Materials for VESSELS, EXCHANGER, PACKAGE UNIT, COMPRESSOR, PUMPS, INTERNALS, OIL and CHEMICALS. Also conduct Physical Inventory for the remaining Materials after finish the Handover of Two (02) Years Spares, Capital Spares and Special Tool to close/comply the Punch List for End of Project purposes.

TASK PROJECT ACHIEVEMENT: All Materials complete issued at Site and complete Handover to Company (RAS- GAS) without any problem and Incidents of Accident Report during operation Loading and Un-loading of Heavy Equipments is concerned. Projects are Totally completed and handover to Company RAS-GAS. 4). APRIL 1995 – SEPTEMBER 2005 (10 yrs & 5 Months): POSITION: LOGISTIC OFFICER

COMPANY: PARIS-MANILA Technology Corp.

PAMATEC Building, 81 EDSA,

Mandaluyong City, M.M, PHILIPPINES

COMPANY: Is Representative and Exclusive Distributor all Products Manufactured by SCHNEIDER GROUP ELECTRIC (France) in the Philippines from LOW Voltage up to HIGH Voltage Equipments & Spares such as Extra High Voltage Substation, Control Panel and Accessories of MERLIN GERIN, Power Transformers from FRANCE TRANSFO, Circuit Breakers from SQUARE-D, Contactors & Relays from TELEMECANIQUE and Power Generating Sets from SDMO.

(CV’s Page 3 of 5)

Duties and Responsibilities: Working in LOGISTIC Department as Logistic Officer and responsible for PROCURING of Electrical Equipment & Materials required in the Projects. Also Follow-up Purchase Order from the Main Manufacturer (EOM) including preparation of Shipping Documents required by the CUSTOMS until materials arrived at PAMATEC Warehouse.

5. JANUARY 1990 – DECEMBER 1994 (04 Years)

POSITION: PURCHASER

COMPANY: ELECT. POWER DISTRIBUTION BOARDS & SWITCHGEAR

(EPS Joint Venture of Merlin Gerin France)

P.O. Box 89249, Riyadh

K.S.A

COMPANY: The COMPANY is Manufacturer and Panel Builder of Low Voltage Panel Boards, HV Control Panel, HV Substation and Switchgear.

DUTIES and REPONSIBILITIES: Working in Logistics Department as IMPORT & LOCAL Purchaser and responsible to procure Materials required by the Production Assembly Plant and Order direct to Main Manufacturer from Abroad such as France, Germany, Italy, USA and other Items buy in LOCAL Market. Also doing the follow-up and expediting the Purchase Order to avoid any delay from the Production Assembly. 6. MARCH 1983 – MAY 1987 (04 Years & 02 Months)

POSITION: STOREKEEPER

COMPANY: SAUDI OGER Ltd.

P.O Box 55475, Riyadh,

K.S.A

COMPANY: is General Contractor and Maintenance Services Provider at Saudi Royal Palace and King Khaled Eye Specialist King Khaled Eye Specialist Hospital in Saudi Arabia. DUTIES & REPONSIBILITIES: is working in Material Maintenance Department and assigned to BIN MATERIAL CARDEX and Controlling, Maintain keep Daily Updating Posting for the In & Out Materials to monitor the Minimu Stocks. And all material DATA information available in the CARDEX Cards such as DESCRIPTION of Materials, REFERENCE, QTY, SKU, LOCATION until ISSUANCE of Materials are recorded. Also involved in Annual Inventory based on Physical Quantity against the Cardex Record and History Information. SKILLS:

1. Understand and Computer literate such as SAP Warehouse Management System (WMS) Data Operation, MS EXCEL File using in DATA Spread Sheet, MS Word and Microsoft OUTLOOK for E-mail Transaction. 2. Can Manage the Procurement activities Local & Importation of Materials. Also attached Seminar Certificate in IMPORT REGULATION INCLUDING GENERAL AGREEMENT TARIFF & TRADE held at HOTEL NIKKO MANILA GARDEN HOTEL, Makati City Phil. Dtd. 17/June/1995. 3. Can Manage large scale of Warehouse and Lay Down Area from Material Planning up to Operational

(Complete Package) without any Problem (See attached copy of my Employment Certificate). 4. Understand reading Isometric and Single Line Diagram Drawings.

(CV’s Page 4 of 5)

EDUCATION ATTAITMENT:

1. COLLEGE/UNIVERSITY: Year 1979 to 1982 – BS Electrical Engineer (3rd Year College) UNIVERSITY OF STO. THOMAS (UST)

UST Bldg., Sampaloc, Manila,

PHILIPPINES

2. SECONDARY HIGH SCHOOL: Year 1974 to 1978 – GRADUATED CABANATUAN CITY COLLEGES

Cabanatuan City, Nueva Ecija,

PHILIPPINES

3. PRIMARY ELEMNTARY SCHOOL: Year 1968 to 1974 – GRADUATED CABANATUAN EAST ELEMENTARY SCHOOL

Cabanatuan City, Nueva Ecija,

PHILIPPINES

REFERENCES:

1. Mr. BK Song - Project Control Manager

GS Engineering & Construction (ADNOC RRW Restoration Project) Contact No. +971-*-***-**** CP No. +971-**-***-**** E-mail Address: adbje6@r.postjobfree.com

2. Mr. Aswin PAI – Project Management Consultancy (PMC) McDonald – GS E&C RRE-2 & RRW Restoration ADNOC Projects Contact No. +971-*********

E-mail Address: adbje6@r.postjobfree.com

4. Mr. BALASUBRAMANIAN Aehan – Plant Mechanical Sr. Section Head Engineer ADNOC Ruwais Refinery West,

Office Contact No. +971-*-***-**** C.P. No. +971-*****-**** E-mail Address: adbje6@r.postjobfree.com

5. Mr. SIVAKUMAR Govindan – Material Inspection Engineering ADNOC Head Office, Material Engineering Dept. (MED) Contact CP No. +971-****-*****

E-mail Address: adbje6@r.postjobfree.com

6. Mr. Andrew A. KERR – Site PMT Manager

JACOBS – Project Management Team (ADNOC RRW Project) Contact Office No. +971-*-***-**** CP No. +971-*****-**** E-Mail Address: adbje6@r.postjobfree.com

YULITO A. DELOS REYES

(Applicant)

Note: All written above are True & Correct and can verify to the Contact Persons on my REFERENCES. Original Documents EMPLOYMENT CERT. and SCHOOL Transcrip of Record to be submit on the Day of Employer Interview.

(CV’s Page 5 of 5)



Contact this candidate