Post Job Free

Resume

Sign in

Engineer Civil

Location:
Khobar, Eastern Province, Saudi Arabia
Posted:
January 31, 2020

Contact this candidate

Resume:

Faisal Saleh Al-Ghamdi

Date of birth: **/**/****

Place of Birth: Jeddah, Saudi Arabia

Status: Married

Mobile: 009***********

E-mail: adbjbj@r.postjobfree.com

EDUCATION

Type of Schooling/Training Type of Degree/Certification Graduate College: King Fahd University of Petroleum and Minerals (KFUPM)

B.S. in Civil Engineering

Year of graduate FEB 2006

Professional

Certification:

Certified as Associate Value Specialist (AVS) from the American Society for Value Engineers (SAVE)

Society of American Value Engineers (SAVE)

American Concrete Institute (ACI), Saudi Chapter

Saudi Consul of Engineering (SCE)

Society of Saudi Civil Engineers (SSCE)

WORK EXPERIENCE

Company: Rashid Ali Al Tamimi Contracting From: May.2018 To: Present Dammam, Saudi Arabia

Position Held: Operation Manger

Project Held: 1. Project Name: FIRE WATER PIPE LINE AT S-CHEM. Owner: Saudi Chevron Phillips.

Client: - AYTB (AL YUSR Industrial Contracting Company Ltd. Location: - Jubail industrial city 31961.

2. Project Name :-New Cleaning pad AT S-CHEM

Owner: - Saudi Chevron Phillips

3. Project Name :-Ground flare Turn Around 968639 (remove and installed the gravel) AT S-CHEM Owner: - Saudi Chevron Phillips

Client: - AYTB (AL YUSR Industrial Contracting Company Ltd. Contract No:- C&F 13596

4. Project Name :-Removing Sand From Tank AT S-CHEM Owner: - Saudi Chevron Phillips.

Client: - CB&I

5. Project Name :- RAS TANURA REFINERY CLEAN FUELS PROJECT Owner: - ARAMCO

Client: - TECNICAS REUNIDAS

6. Project Name :- SADARA MAINTENANCE WORK( IPWS SHOT TERM MISCELLANOUS WORK) Owner: - SADARA

Client: - AYTB (AL YUSR Industrial Contracting Company Ltd. 7. Project Name :- Sharma Royal Complex

Owner: - Royal Court

Client: - NESMA & PARTNERS Contracting Co. Ltd

8. Project Name :- Sharma Royal Complex

Owner: - Royal Court

Client: - El Seif Engineering and Contracting Compan Brief Description of Responsibilities:

Manages the growth and success of the team

Coordinates activities that affect operational decisions and business requirements

Responsible for the construction, procurement, and planning of daily operations

Communicates with all relevant employees to ensure delivery times are met

Plans, schedules, and reviews workload and manpower to make sure targets are being met on a cost-effective basis

Manages the stock control, and checks that inventory records are accurate

Ensures the production team has enough time to manufacture and deliver products based on the client's request

Creates a detailed schedule based on strict deadlines

Communicates any changes in the order or delivery date to relevant parties

Monitors production standards

Makes sure the working environment maintains access to quality equipment

Purchases materials and services required for production

Follows up on interruptions to the order

Organizes, plans, and implements inventory activity

Confirms that health and safety regulations are followed

Provides guidance to employees

Company: Azmeel Contracting Company

Managing Director Office

From: Dec. 2104 To: May,2018

Dammam, Saudi Arabia

Position Held: Business Development Director

Brief Description of Responsibilities:

- Establishing “Advance Project Management Division” to develop the company standard and policies in order to be qualified with Saudi Armco Project.

- Lead and initiate “Oil & Gas “Division in the company to help and work with our affiliate companies such as (ARKAD Company).

- Supporting the project management team by resolving any issues with the clients.

- Supporting the project management team in the registration and establishing good relation with new clients.

- Supervising the Rush Projects (King Abdul aziz Camel Fetival Village) and the renovation of The Royal Conference Place.

- Supporting team working with Saudi Aramco in the Gas Booster Compression System (BGCS # 3 and #5 ) for an EPC for the temporary facilities including the offices (around 6,000 square meters both sites) and camps (around 10,000 square meters both sites) for Saudi Aramco and the contractor. The site preparation package for area of around 1.5 million sqm both sites including but not limited to cut, full, replacement and compaction for the sites.

- Lead the Mobilization Department in the company to facilitate the new projects with all the required facilities they need to perform their work such as EPC of the temporary facilities for the Master Gas System Project Package 1, 2 and 3 and Fadhili Down Stream Project with Saudi Aramco as the Client and ArKad Contracting Company as the main contractor including building 13 camps from Fadhil in the east up to Yanbu in west around (1300 km). Company: Bechtel, Construction Department From: Jul. 2011 To: Oct. 2014 Jubail, Saudi Arabia

Position Held: Project Engineer

Brief Description of Responsibilities:

I assigned to work with Royal Commission Projects Department as a Project Engineer and a Royal Commission Representative for the following Projects: Project Held:

Contractor:

General Organization for Social Insurance (GOSI)

Azmeel Contracting Company

Site development & construction of 408 Villas and 18 apartments building with 288 apartments and two daily mosques and a kindergarten the total cost is 888 million SR with duration of 1170 days. Project Held:

Contractor:

Saudi Arabia Basic Industries Corporation (SABIC)

SABIC Mega Housing Project Package #1

Al-Khonaini International Company Limited (KICL)

Site development with secondary infra-structure & construction of 234 at Jalmudah District, Jubail Industrial City the cost around 250 million SR

Project Held:

Contractor:

Saudi Arabia Basic Industries Corporation (SABIC)

SABIC Mega Housing Project Package #2, 3, and 4

Beijing Construction Engineering Group (BCEG)

Site development with secondary infra-structure & construction of 1285 at Jalmudah District, Jubail Industrial City the cost around 1300 million SR

Project Held:

Contractor:

Saudi Arabia Basic Industries Corporation (SABIC)

Sabic Mega Housing Project Package # 5 Saudi Kayan Company Al-Khonaini International Company Limited (KICL)

Site development with secondary infra-structure & construction of 254 at Jalmudah District, Jubail Industrial City the cost around 250 million SR.

Company: Bechtel, Construction Department From: Oct. 2010 To: Jul. 2011 Jubail, Saudi Arabia

Position Held: Lead Field Engineer

Brief Description of Responsibilities:

Promoted to be a Lead Field Engineer on “Site Development of Jubail 2, Stage 2 Phase1” and “Site Development of Jubail 2, Stage 2 Phase2”. I am working these two projects successfully and fully satisfying the requirements of the company and the Royal Commission. Some of my duties is monitoring and supervising Civil, Mechanical, Electrical and Telecommunication works. My responsibilities include but not limited to report to the higher management for any failure or deficiency for any system. It’s also included to make sure the projects are as per our schedule and meets our target and budget. Also to arrange with other end users such as Saudi Electricity Company (SEC), Saudi Telecom Company (STC) MARAFIQ and others to implement their requirement for using the utilities. The cost for these projects more than 470 million SR. Company: Bechtel, Construction Department From: May 2009 To: Oct. 2010 Jubail, Saudi Arabia

Position Held: Field Civil Engineer

Brief Description of Responsibilities:

Worked as Field Civil Engineer on “Site Development of Jubail 2, Stage 3 Phase1” and “Site Development of Jubail 2, Stage 3 Phase2”. I run these two projects successfully and fully satisfying the requirements of the company and the Royal Commission. My biggest accomplishment is to ensure my work and that of the contractor meets quality requirements. Some of my daily duties as a field engineer are to review contractor submittals. Review design documents and drawings and coordinate with discipline engineers when needed. Coordinate with Contract Supervisors to ensure that the required technical submittals are obtained from contractors and reviewed in a timely manner. The real accomplishment right now that is after 13 months from the kick off meetings both projects are about 25-30% ahead of schedule and that is something I am proud of and I promoted to be lead engineer on these project which cost more than 450 million SR.

Company: Bechtel, Construction Department From: Mar. 2009 To: May 2009 Jubail, Saudi Arabia

Position Held: Field Engineer

Brief Description of Responsibilities:

Worked as a Field Engineer on the expansion of the land fill area. In this project we installed and tested new systems for the first time in Jubail for burning the unwanted gases. Also, I was the responsible for handing over this project to the end user, which was accomplished without any delay or system problem. (56 million SR) Company: Bechtel, Construction Department From: Jul. 2008 To: Mar. 2009 Jubail, Saudi Arabia

Position Held: Field Engineer

Brief Description of Responsibilities:

Worked as a Field Engineer on Pipeline Corridor Stage 2 Project. .The duties were to Implemented Quality Assurance application and procedure; reviewed the Technical Submittals and the Technical Queries. Supported Project organization & administration activities

(74 million SR)

Company: Bechtel, Construction Department From: Feb. 2007 To: Jul. 2008 Jubail, Saudi Arabia

Position Held: Cost Estimator

Brief Description of Responsibilities:

Worked as a cost estimator. The duties were to estimate building and site work projects. Reviewed project design packages checked quantities and the prices in BOQ’s. Prepared Conceptual cost estimates for projects. Prepared and collected the data for the scope book. Prepare WPCR (Work Plan Change Request). Perform duties of a cost estimator for various Jubail Industrial, port, residential and services support projects. Reviewed the design packages and assisted in establishing the Scope Book for Jubail Project with Project Controls Department. Selected to attend the Project Controls Workshop in Doha. Company: Bechtel, Construction Department From: Jul. 2006 To: Feb. 2007 Jubail, Saudi Arabia

Position Held: Field Civil Engineer

Brief Description of Responsibilities:

Worked as a Field Civil Engineer on Pipeline corridor project. Implemented Quality Assurance application and procedure; reviewed the Technical Submittals and the Technical Queries. Supported Project organization & administration activities. (54 million SAR) Company: Saudi Bin Ladin Group

Airports and Special Projects Division

From: Feb. 2006 To: Jul. 2006

Makkah, Saudi Arabia

Position Held: Site Engineer

Project Held: King Abdualaziz Endowment Project

Brief Description of Responsibilities:

Worked as a site engineer the main role was to calculate the quantities and review the shop drawings, supervise the concrete pouring and preparing the daily reports



Contact this candidate