Waseem Ahmad
Resume
Nationality: Indian Date of Birth: 01 July 1979
Family status: Married Email address:*********@*****.***
Tel. Saudi Arabia: +966-*********
*-******** *bjective:
To obtain a challenging position in a well reputed organization, where accomplishments are
Rewarded with responsibilities and advancement.
3-Employment History:
A) Global Business Horizon (GBH), Al Riyadh KSA. (With Saudi Telecom)
Position: Satellite (RF) Technician. (Mar.2018 to Till)
Responsibilities:
Managing Dirab Satellite Earth Station by equipment maintenance and technical operations.
Operation & maintenance of Ku & C Band CHPA (600W, 750W, 1.2KW and 3 KW) HPAs.
(Klystron & TWT)
Performance test, power level adjustment and frequency tuning of HPAs.
Antenna pointing for new Satellite and CPI test with Satellite operator.
Testing of new equipment Klystron & TWTA Tubes, BUCs, SSPA, SSPB and LNA etc.
Good command on test equipment spectrum analyzer, signal generator and power meter.
Responsible to up link the special T.V transmissions e.g. Hajj and others.
PMR (Preventive maintenance routine) daily, weekly, quarterly, half yearly and yearly of all RF
Section at Dirab Satellite Earth Station.
Co-ordinate and directed trouble-shooting, and faulty restore on all communications.
Operation & Maintenance several Ku/C band satellite network in support of the HUB.
Perform daily Parameter check of HPA and Antenna Controller Unit (ACU).
B) Steelman Telecom Pvt.Ltd. (Huawei LTE Project), Delhi & NCR -India
Position: Site Engineer. (Dec. 2015 to Jan 2018)
Responsibilities:
Installation & Commissioning of Vodafone Microwave link.
Worked on Huawei RTN-905, RTN-950, RTN-910 with web LCT Tools.
Extensive experience in the deployment of Transmission & Access network.
Extensive experience in routing & termination of IDU/ODU.
Worked on Ericsson to Ericsson swap.
Solving all the technical issues related to BTS & GSM end.
Manage site EHS report & quality report for Vodafone microwave antenna project.
Manage all the PPE & Safety (ISO) issues related to height works.
Installation and commissioning of Vodafone LTE on GSM and BTS with Huawei Project.
Worked on RFAI and EMF Site survey for Vodafone new site.
Rectify VSWR troubleshoot in BBU-3910, RRU 3953w & DCDU-12c at site.
C) Pearls Broadcasting Corporation Limited, (P7 News Channel), Noida-India
Position: R.F. Engineer. (May.2009 to Nov.2014)
Responsibilities:
Monitoring all equipment use in Link room and also checking time to time.
Installation and Tracking of 6.0m Dish antenna and DTH.
Perform satellite uplink & downlink system maintenance including Satellite Antenna,
BUC, LNA, LNB, UP/DOWN Converter, HPA
perform Broadcast equipment system preventive and corrective maintenance.
Responsible for equipment troubleshooting, re-cabling and equipment installation.
Responsible in audio/video set-up installation during live broadcast coverage operation.
Send weekly/daily/monthly reports directed to engineering head.
Monitoring quality of programs being Telecasted & Measuring the Video as well as Audio level for around Four Channel.
Handling Channel feeding to like APN, BBC, AL-ZAZEERA TV Channel.
D) Senior Media Limited, (S1 News Channel) Noida, India
Position: R.F. Engineer (May 2007 to April 2009)
Responsibilities:
Monitoring and troubleshooting of DSNGs, NOC and uplink equipment for 24/7 live coverage &
Highest standards of reliability and quality of service.
Establishing Satellite link for Live Coverage through DSNG (digital satellite news gallery) as
Well as from fix links.
Good command on operation of Tandberg E-5714 (Encoder) & Tandberg IRD.
maintaining broadcasts that include news bulletins, programs and Transmission in MCR, PCR
And INJEST Operations.
Perform satellite uplink & downlink system maintenance including Encoder, IRD, HPA, BUC, SSPA, LNB and on various uplink & downlink equipment for earth station.
Responsible in on-air operation for Transmitters, Satellite uplink & downlink & control apparatus room (CAR).
Monitoring quality of programs being Telecasted & Measuring the Video as well as Audio level for around TWO Channels.
Worked in Teleport for uplink signal to control and maintenance signal.
E) Obra Thermal Power Plant) Obra (U.P), India
Position: Graduate Apprenticeship Trainee (Jan 2005 to Jan 2006)
Responsibilities:
Worked as a “Apprenticeship Trainee” in Obra Thermal Power Plant in control & instrument division.
4-Education:
A) Bachelor of Technology. (B.Tech, Electronics) 2004
Institute of Integral Technology, Lucknow (U.P), India
B) Diploma in Electronics Engineering. 2001
Govt. Polytechnic College, Bahraich (U.P), India
5-Computer and other Skills:
Installation & basic troubleshoot of all window (windows XP, windows 7, windows 10)
Able to work on Microsoft Office,Microsoft Excel.
7-Languges:
Urdu
English
Hindi