Key Skills
Profile Summary
Project Management
QA/QC Control
ARAMCO Approved
Electrical Engineering
Cathodic Protection
Instrumentation
Reporting & Documentation
Cross-functional Coordination
Stakeholder Management
Resource Optimization
Stakeholder Management
Resource Optimization
Result-oriented professional with around 13 years of experience across Quality Control, Engineering and Project Management.
Witnessed Testing & commissioning of ICCP system for wellheads & storage tanks.
Skilled in executing electrical projects on time within the stipulated budgets; capability to lead teams towards achieving objectives
Comprehensive experience in planning & effectuating preventive, corrective and breakdown maintenance
schedules of several utilities to ensure zero / minimum breakdown so as to increase uptime & reliability.
Used systematic approaches, principles of logic and analytical techniques to define and solve problems
Developed daily maintenance and defect rectification reports and steered analysis on the quality of the plant maintenance works
A team player with excellent communication, analytical, problem-solving and relationship management
competencies
Soft Skills
Career Timeline
Apr’18 – Present Aug’17 – Mar’18 Aug’16 –July’17
Mudabbir Hussain
Electrical Engineer Oil & Gas field Quality Control Project Engineering Substations ********.********@*****.*** +966-*********
********.********@*****.*** +966-*********
Communicator Innovator
Thinker
Collaborator Intuitive
Company: SINOHYDRO
Position: Quality Control
Inspector – Electrical
Project : South Dahran
Home Ownership
Program(SDHOP)
Company: Bin Quraya Holding
Company
Position: Quality Control
Inspector – Electrical
Project: Onshore Maintenance
Potential Project, Khurais
Company:
SAIPEM/SNAMPROGETTI
Position: Quality Control
Inspector – Electrical and
Instrumentation
Project OFFSHORE
Maintenance Potential
Facilities Project, KARAN-
TP-1
Company : Sepam
PM&C
Position : Quality
Control Inspector –
Electrical&
Instrumentation
Project : SADARA –
Gate House - D2
Project, Jubail 2
Nov’15 – July’16 Feb’13 – Aug’15 Mar’11 – Dec’12
Company : KLM Group, Australia
Position : Quality Control - Electrical
Duration : March 2009 – Jan 2011
Project : Crystal Petrochemicals
Company : Micron Electricals Pvt Ltd
Position : Site Engineer/QC Inspector
Duration : April 2007 – Jan 2009
Project : Waste Water Treatment Plant
33 KV Substations
Company: Daewoo E & C
(Engineering and Constructions)
Position: Quality Control
Inspector – Electrical
Project: SADARA – Tank Farm
Project (Oil and Gas) Jubail 2
Company: Thermo LLC, Saudi
Arabia
Position: Quality Control -
Electrical
Project: ARAMCO – Waste
Water Project, Housing
Development Project
King
Abdullah Sport City, Jeddah.
Project : Onshore
Maintenance Potential Project,
Khurais
Education
Electrical & Electronics Engineering: Shadan College of Engineering and Technology (2003-2007).
Others:
Aramco Approved Quality Inspector – Electrical and Instrumentation.
Experience in Receiving, Storage & Preservation, Installation & Testing of LV & MV Cable, Motors, MCC, Switchgear, Transformers, NGRs, Marshalling Panel, Junction Boxes, Transmitters, Loop Check.
Experience in installation, testing pre-commissioning and startup of Electrical Equipment like RTU, Transformer, Switchgears, LV Switchboards, MDB, SMDB, DB, MCC,
lighting Fixtures, Socket outlet, Telephone system, Television system, Fire Alarm Detection System, CCTV, Public address systems, Building Management System etc. Job Responsibilities:
Inspection of Material Receiving, Installation and witness Testing of Switch Boards, Panel Boards, Power transformer/ Dry Type Transformer as per Project Specs and International standards.
Inspect the Installation of various types of conduits (PVC / RGS / EMT / FMC / LT) and fittings as per the Area Classification & Standards.
To supervise & monitor work for loop checking, Interlock Check, P & ID, ILD, and Data Sheet.
Inspect the Installation of Cable Ladder/ Tray as per Standard ( NEMA VE1 and NEMA VE2)
Perform Material Receiving and Installation Inspection of Switch Racks as per the Single Line Diagram and Installation Detail Drawings.
Inspection of Material Receiving, Installation inspection of Indoor, Outdoor and Emergency Lighting Fixtures as per Project and Standard Requirements.
Installation inspection of Stanchion for instrument devices, Marshalling Panel, Junction Boxes, mounting of instruments devices such as Temperature Transmitters, RTD Thermocouple, Pressure, level, Flow transmitters and Temperature Switch and Control Valves.
Inspect the Material and Installation of ACSR/OPGW/MV/LV/Grounding cables by verifying the documents, drawings, test reports and compliance certificates etc.
Performing Receiving and Installation Inspections of OHPL Poles (15, 16.5 and 20) meters as per standard drawings and specifications.
Performing Receiving and Installation Inspections of OHPL accessories (Post Insulators/Surge Arrestors/Cutout Fuse/Guys/Clevis) as per the specifications.
Witness Leak Test of Impulse Tubing for Pressure, Flow, Level Transmitters and IA Tubing.
Inspection of LV Motor Solo Run Testing as Per Procedure.
Witness of Battery Charging and Discharging test and making Test Reports.
Witnessing Pre-Commissioning tests on 13.8 KV/0.48 KV rated Transformer and making Test Reports.
Witnessing HI-POT Test with Termination Kit of 34.5KV and 5KV respectively.
Actively involved in Loop Checking.
Inspection of installation of Cathodic Protection anode and cathode electrodes and its cabling and testing.
ICCP( Impressed Current Cathodic Protection) Junction Box Pre-Commissioning for
Cathodic Protection.
Energized ICCP Circuit testing for Cathodic Protection.
External Tank Bottom Testing for Cathodic Protection.
DC-Rectifier Pre-Commissioning for Cathodic Protection.
Performing Inspections on Cathodic Protection Activities :
Transformer Rectifier Installation.
Cathodic Protection Positive and Negative Cable Laying.
Deep Well Anode Beds Installation.
Junction Box Installation.
Installation of Anode/Cable Marker Posts.
Negative Cable to Well Head Connection.
C.P System Pre-Commissioning.
Witnessing Sagging on ACSR Cables and making Test Report.
Performing Illumination test of Normal and Emergency Lighting.
Awareness on Hazardous Area Classifications and selection of Electrical Equipment.
Verify the Material Receiving request with PO, FAT report, Mill/Test Certificate, Packing list, Loading note, Data specification sheet and operation maintenance manual for Electrical and Instrument.
Monitor/Inspect subcontractor and supplier’s procedures, materials, documentation, testing activities, calibration activities for compliance.
Verify the Equipment and devices used in the Project Requirements meet the Specifications, standards and Tested in accordance with the Procedures.
Close out of Walk through Punch list with the client.
Performing Surveillance on site, discussing with the site representative about the work procedure, raising surveillance reports and N.C.R if any activity performed violates the standard.
Verify the Test Equipment’s such as Multimeter, Process Calibrator, Lux meter, Temperature Bath, Deadweight calibrator, are valid with calibration due date.
Inspect electrical light and power wiring, fixtures, appliances, and apparatus inside or running to buildings or structures for compliance with codes and ordinances governing electrical work.
Visual inspection and witnessing for instrument transformer (CT and VT) and metering testing and recording the result.
Prepare inspection test plans in coordination with the QA/QC Manager in consultation with the construction team.
Control and maintain the testing equipment and measuring instruments including the calibration status in order to ensure accurate and reliable readings.
Maintenance of HV & MV Distribution Transformers, like visual checking of transformer oil level, oil temperature, winding temperature & breather silica gel. If any abnormalities, rectify that.
Supervision for Installation of Electrical Cable tray Installation, Primary cable & Secondary cable Installation, Junction box & Local control panel Installation, Cable Glanding & Termination Installation
Make sure that the best engineering practices are implemented by the execution team. Personal Details:
Father’s Name : Khaja Mushtaq Hussain
Date of Birth : 14th January 1986
Gender : Male
Religion : Islam
Marital Status : Married
Nationality : Indian
Strengths:
Creative, hardworking and confident.
Ability to work in a learning and progressive environment.
Excellent Problem-Solving skills
Work well as a team member or independently.
Use clear, concise communication skills in conjunction with organizational skills to perform daily duties.
Resourceful, energetic, competent, multi-task and results-oriented.
Public speaking and presentation experience.
Demonstrated ability to meet the needs of patrons, dependable, hard working, reliable, and punctual.