PRINCESS D. CASTRO
PERMANENT ADDRESS:
Lot ** Block 18 Arabella Homes Pulo, Cabuyao, Laguna 4025
PRESENT ADDRESS:
Sky Garden 3 Building12B, District 7, Phu My Hung, HCM City Viet Nam PHONE: +849******** (WhatsApp/ Zalo) and +639********* EMAIL: *************@*****.***
CORE EXPERTISE:
• New Product Introduction for
Inverter and Optimizer PCBA and Top-Level Assembly (Box Build)
Module and Socket Board (LGA/VGA)
Camera Module Actuator
Voice and Video Coil Motor
Optical Image Stabilization
(HDD) Magnetic Heads
Laptop UFF Assembly (Ultra-Fast Fan)
• Production Line start-up
• Pick and Place, Tape and Reel Machines
• Solder Ball Mounting, Manual Soldering and Wire Bonding Machine
• Die Dispensing, Laser Marking, and Press fit or Docking Machine
• Magnetic Head (HDD) Testing and Assembly
KEY ACCOMPLISHMENTS:
• Successfully qualify SolarEdge Inverter products to Mass production within 2 months with ~180 USDM yearly projected revenue.
• Successfully convert and qualify iHS Technology up to MP
• Developed and incorporate auto scanning to tester which improved UPH of Camera Module testing by 21% or from 70 to 85 pcs/hour.
• Successfully developed pick and place nozzle cleaning and purging which decreased magnetic head chip contamination by 2%
• Provide a prototype jig for manual application of epoxy/glue or manual encapsulation, improve UPH
/efficiency by 15% or from 180pcs/hour ~210pcs/hour.
• Reduce IPA (Isopropyl Alcohol) consumption by 50% or 4 cans (200 liters) down to 2 cans (100 liters) per month by adding de-ionized water that used to cleaned clean room tables and chairs.
• Save for about $4.64 per tester/month ($222.72) by fixture modification and contacting parts conversion from a pogo pin type to zebra type.
• Improved iHS suspension consumption for daily machine checking by providing/designing master fixture as replacement of iHS suspension (saved $840 per year). CAREER SUMMARY
Jabil Vietnam
Project Engineer II (Program Management Office, June 2019~ Present) EMS (SMT Assembly and Box Build High Level Assembly)
• Cross functional lead management for the project from kick-off to mass-pro.
• Accountable to drive the team to meet the project KPIs (FPY, Scrap, OBA, OTD, CAR, OTP, CRR)
• Leads the project build readiness review (BRR), DFM reviews, build execution, post-mortem, phase gate reviews and project risk assessments.
• Identify project needs, detailed timeline for completion, delegate tasks, and implement changes to teams and processes as needed.
• Report progress to the project manager in their organization and use a personal computer as one of their main tools to maintain accurate, organized project records.
• Customer engagement and alignment for all build and project overall execution. TDK Philippines Corporation
Process/Test Engineer 3 (March 2005 ~ September 2017) Camera Module Actuator/ Voice and Video Coil Motor /Optical Image Stabilization and Magnetic Heads Assembly and Test
• Supervise Test / NPI team from product introduction period up to Mass production stage.
• Reporting, and managing workload in a very fluid and demanding department
• Communicating and documenting risks and issues identified during product development
• Coordinate with make site departments to support the team in delivering Sample Builds through the production facilities
• Coordinates with and gives feedback to suppliers, vendors, customers and design persons-in charge regarding design or machine failures and proposals
• Evaluates, optimized procedures for materials, process, testers /testing methodology to minimize test time. Arrange various meetings, develop agendas and assist with presentation
• Design, develop, implement, and improve safe and environmentally responsible manufacturing processes
• Facilitate & coordinate project meetings and assist in problem solving for project development
• Sustain mass production line and improve machine uptime and utilization.
• Monitors consumable parts/consumption and control, provide necessary improvements.
• Improved process and developed criteria to eliminate transients on testers and programs to ensure product quality. Conducts statistical analysis on critical parameters defined on the process. Introduce new product technology.
• Provide both Micro /Macro schedule of Production build from Prototype up to Ramp up.
• Provide or create necessary documentations and prepare data package requested by the customer.
• Released Daily and Weekly Accomplishment Report
Fujitsu Computer Corporation of the Philippines
Process and Development Machine Operator and Technician (January 1997~ February 2005)
(Wafer Fabrication and Magnetic Head Assembly)
• Qualify Daily performance of Wire Bonding and Die Dispensing Machines.
• Tabulate data from HPGL Gram load, Dage thru Wire full, Peel and Shear Strength as daily machine qualification.
• Initiate analysis and provide CA/PA to improve wire bonding and die attached yield.
• Resolve issues relating to line stoppages or lot put on hold. Verify defective products/units and disposition them accordingly.
• Communicate for equipment spares and auxiliary materials to responsible team.
• Initiate process simplification, equipment modification, tools and improvised fixture to improve productivity, efficiency, quality and cost.
• Perform evaluation for new model, technology and new project up to mass production period. SKILLS AND INTEREST
Computer Skills
• Microsoft Word, Power Point, Excel / Pivot Table and Adobe Photo shop expert
• JMP Application / Mini Tab and Synergy expert
• SAP / MES user
Analytical
• DOE (Design of Experiment)
• FMEA (Failure Mode and Effect Analysis)
• Applying 7 QC Tools
• DMAIC (Define Measure Analyze Improve and Control)
• CPK (Process Capability) and SPC (Statistical Process Control)
• Root Cause Analysis and 8D methodology
• Documentation - Visual Aids, Control Plan, Process Flow EDUCATIONAL BACKGROUND
Manuel S. Enverga University Foundation
Bachelor of Science in Industrial Engineering
Date Graduated: June 2013
TRAINING / SEMINAR / CERTIFICATION
Camera Module New Project Benchmarking
Conducted in Xiamen China
Date: May 01-05, 2016
Optical Image Stabilization Technology Transfer Training Conducted in TDK Yangmei Taiwan
Date: June 01-13, 2015
iHS Technology and Process Qualification Training
Slider Dynamic Testing Pick and Place Machine
Conducted in SAE Donnguan Guandong China
April 26 ~ May 15, 2010
DOE Training by SEIPI
Conducted by Mr. Peter Awayan
Place: 119 East Science Ave. SEPZ Laguna Techopark, Binan Laguna. Philippines Date: April 2017
Root Cause Analysis by Arnold David
Place: 119 East Science Ave. SEPZ Laguna Techopark, Binan Laguna. Philippines Date: August 28 to September 02, 2011
PERSONAL DATA
BIRTHDATE November 5, 1977
NATIONALITY Filipino
MARITAL STATUS Single
SEX Female
CHARACTER REFERENCES
Available upon request