● CLARENCE CRAIG ROBERTS jr
Nccer plus pipefitter
OSHA 10
EMAIL: adbe4f@r.postjobfree.com
To whom it may concern attention pipe fitter
employment (any location)
seeking full time employment, to continue my knowledge in all aspects of industrial pipefitting and working with maximum safety.
WORK HISTORY
M@E MECHANICAL
1996-1999
Supervisor: Duane Law
Helped with all aspects of pipefitting and practiced maximum safety. Commercial hospitals high schools pentatentries Chiller systems vab boxes Hearing hot water systems and boilers
ATLANTIC CONSTRUCTORS
1999-2004
Supervisor: Wayne Whittley
Performed all aspects of industrial pipefitting (layout, install, rigging, fabbing, reading prints, ect EMC MECHANICAL
2004-2007
Supervisor: Roger pallet
Performed all duties involved with pipefitting.Commercial and industrial piping High schools computer chip plants Phillip morris
FOURSQUARE CONSTRUCTORS
2007-2011
Supervisor Scott Stevenson
performed all aspects of pipefitting.industrial plants Honeywell DuPont Phillip Morris pharmaceutical plants
And Ashland chemical
PERFORMANCE
2011-2013
supervisor David kittrell
Performed all aspects involved with powerplant pipefitting. I industrial piping kemper county coal burning power plant New constuction gas fire
KBR
2012-2013
supervisor Darryl Howard
Performed all supervisory duties involved with pipefitting.industrial cheveron oil refinery super heater pump allignments and repair New construction
CB@I
2013-2014
Supervisor Jason Mcneal
Performed duties of pipefitter. Industrial New construction Williams chemical plant in Geismer installed carbon and stainless.
YATES
2014 March- June 2014
Supervisor Donnie Gray
Performed all aspects of pipefitter foreman.industrial Rock Tenn paper mill changed boilers from coal burners to fuel gas burners and did the same at international paper in Perry flordia SYSTEMS CONTRACTORS
2014 June- August 2014jb
Supervisor. Daryl Atkins
Performed all skills involved with pipefitting.industrial in North Dakota New construction we did the iron work the mill wright and pipe on job from ground up oil sand terminals FAGAN INC
August 2014-October 2014
Supervisor Mike Spencer
Performed all aspects of pipefitting.New construction in a DuPont ethanol plant I did the water filtetation system 90 percent stainless and valves STARCON
October 2014- November. 2014 shutdown
Supervisor Jarrod McNeal
Performed all aspects of pipefitting. Industrial shutdown in a flint hills chemical plant Chicago we did discovery work on exchangers and piping systems.
REF CHEM
November 2014 -feb 2015
Supervisor Ronald Craig
Performed all aspects of a pipefitter Foreman at natural gas plants. Industrial under ground pipe natural gas 100 percent code work compressor station in great bend PA and in Bradley OK for burns and Mcdonell.
CB@I
feb 2015 - june 2015
Supervisor-juan chavarria
performed all aspects of a pipefitter for new construction ethylene plant.Industrial did all the super heaters in an Ethylene plant
Performance
June 2015-Nov 2015
Supervisor- Jeremy Wiggins
Performed pipefitting at CF Industries ammonia piping. New construction worked on mainly p11 chrome on the ammonnia side of the plant
TIC - Kewitt
Nov2015-Jan 2016
Supervisor Joe Norman
performed all pipefitting duties involved with a power plant coal burner. Industrial Petra Nova new construction New process carbon capture. Federal job PERFORMANCE
Feb 2016-Jan 2017
SUPERVISOR: Harold Sharp
I performed all duties of a pipe foreman in a chemical plant setting. CF INDUSTRIES. New construction commisioning and start up SWS
Mar 2017-april 2017
SUPERVISOR Rhett Johnson
I fabricated pipe during predown and installed during shut down at Honeywell Philadelphia PEAK MECHANICAL
SUPERVISOR: Jay Carpenter
June 2017 - August 2017
Shut down violie plant rebuild incenterater. Structure and pipe fitting ITAC
August 2017 -nov 2017
SUPERVISOR: Mike Riddick
Pipe foreman naval shipyard
Building a welding machine for submarines hydrolic piping gas piping Structural fitting millwright ect
H3O Inc Dec 2017 to March 2018
Pipe fitter
Supervisor
Worked in papermill,steel Mills,dam,ect
Worked independently or supervised a small group of guys Quality tanks April 2018 June 2019
Supervisor Tom cansler
General foreman pipe
Oversaw daily activities was responsible for pulling all measurements and writing iso up for fabrication ordering material
Skills
RIGGING
IRON WORK
BOILER MAKER
PLANTS I'VE WORKED IN
HONEYWELL
PHARMACEUTICALS
PAPERMILLS
DUPONT
OIL REFINERIES
ETHANOL PLANTS
CHEMICAL PLANTS
NATURAL GAS PLANTS
WILLIAMS
BURNS @ MCDONNELL
POWER PLANTS
CONCLUSION
I have worked New construction, shutdowns,various chemical plants,power plants,natural gas,above ground,and underground. There is not much that I can not handle with minimum supervision I feel I would be an asset to a company I do task in a safe and timely fashion,i do stress safe I have a very good safety record as well thank you for your time.