Resume:

● CLARENCE CRAIG ROBERTS jr

Nccer plus pipefitter

OSHA 10

804-***-****

804-***-****

EMAIL: adbe4f@r.postjobfree.com

To whom it may concern attention pipe fitter

employment (any location)

seeking full time employment, to continue my knowledge in all aspects of industrial pipefitting and working with maximum safety.

WORK HISTORY

M@E MECHANICAL

1996-1999

Supervisor: Duane Law

Helped with all aspects of pipefitting and practiced maximum safety. Commercial hospitals high schools pentatentries Chiller systems vab boxes Hearing hot water systems and boilers

ATLANTIC CONSTRUCTORS

1999-2004

Supervisor: Wayne Whittley

Performed all aspects of industrial pipefitting (layout, install, rigging, fabbing, reading prints, ect EMC MECHANICAL

2004-2007

Supervisor: Roger pallet

Performed all duties involved with pipefitting.Commercial and industrial piping High schools computer chip plants Phillip morris

FOURSQUARE CONSTRUCTORS

2007-2011

Supervisor Scott Stevenson

performed all aspects of pipefitting.industrial plants Honeywell DuPont Phillip Morris pharmaceutical plants

And Ashland chemical

PERFORMANCE

2011-2013

supervisor David kittrell

Performed all aspects involved with powerplant pipefitting. I industrial piping kemper county coal burning power plant New constuction gas fire

KBR

2012-2013

supervisor Darryl Howard

Performed all supervisory duties involved with pipefitting.industrial cheveron oil refinery super heater pump allignments and repair New construction

CB@I

2013-2014

Supervisor Jason Mcneal

Performed duties of pipefitter. Industrial New construction Williams chemical plant in Geismer installed carbon and stainless.

YATES

2014 March- June 2014

Supervisor Donnie Gray

Performed all aspects of pipefitter foreman.industrial Rock Tenn paper mill changed boilers from coal burners to fuel gas burners and did the same at international paper in Perry flordia SYSTEMS CONTRACTORS

2014 June- August 2014jb

Supervisor. Daryl Atkins

Performed all skills involved with pipefitting.industrial in North Dakota New construction we did the iron work the mill wright and pipe on job from ground up oil sand terminals FAGAN INC

August 2014-October 2014

Supervisor Mike Spencer

Performed all aspects of pipefitting.New construction in a DuPont ethanol plant I did the water filtetation system 90 percent stainless and valves STARCON

October 2014- November. 2014 shutdown

Supervisor Jarrod McNeal

Performed all aspects of pipefitting. Industrial shutdown in a flint hills chemical plant Chicago we did discovery work on exchangers and piping systems.

REF CHEM

November 2014 -feb 2015

Supervisor Ronald Craig

Performed all aspects of a pipefitter Foreman at natural gas plants. Industrial under ground pipe natural gas 100 percent code work compressor station in great bend PA and in Bradley OK for burns and Mcdonell.

CB@I

feb 2015 - june 2015

Supervisor-juan chavarria

performed all aspects of a pipefitter for new construction ethylene plant.Industrial did all the super heaters in an Ethylene plant

Performance

June 2015-Nov 2015

Supervisor- Jeremy Wiggins

Performed pipefitting at CF Industries ammonia piping. New construction worked on mainly p11 chrome on the ammonnia side of the plant

TIC - Kewitt

Nov2015-Jan 2016

Supervisor Joe Norman

performed all pipefitting duties involved with a power plant coal burner. Industrial Petra Nova new construction New process carbon capture. Federal job PERFORMANCE

Feb 2016-Jan 2017

SUPERVISOR: Harold Sharp

I performed all duties of a pipe foreman in a chemical plant setting. CF INDUSTRIES. New construction commisioning and start up SWS

Mar 2017-april 2017

SUPERVISOR Rhett Johnson

I fabricated pipe during predown and installed during shut down at Honeywell Philadelphia PEAK MECHANICAL

SUPERVISOR: Jay Carpenter

June 2017 - August 2017

Shut down violie plant rebuild incenterater. Structure and pipe fitting ITAC

August 2017 -nov 2017

SUPERVISOR: Mike Riddick

Pipe foreman naval shipyard

Building a welding machine for submarines hydrolic piping gas piping Structural fitting millwright ect

H3O Inc Dec 2017 to March 2018

Pipe fitter

Supervisor

Worked in papermill,steel Mills,dam,ect

Worked independently or supervised a small group of guys Quality tanks April 2018 June 2019

Supervisor Tom cansler

General foreman pipe

Oversaw daily activities was responsible for pulling all measurements and writing iso up for fabrication ordering material

Skills

RIGGING

IRON WORK

BOILER MAKER

PLANTS I'VE WORKED IN

HONEYWELL

PHARMACEUTICALS

PAPERMILLS

DUPONT

OIL REFINERIES

ETHANOL PLANTS

CHEMICAL PLANTS

NATURAL GAS PLANTS

WILLIAMS

BURNS @ MCDONNELL

POWER PLANTS

CONCLUSION

I have worked New construction, shutdowns,various chemical plants,power plants,natural gas,above ground,and underground. There is not much that I can not handle with minimum supervision I feel I would be an asset to a company I do task in a safe and timely fashion,i do stress safe I have a very good safety record as well thank you for your time.



Contact this candidate