CURRICULUM VITAE

Name : Jerry Von L. Glori

Address : Brgy. Kadaohan, Ormoc City, Leyte, Philippines 6541

Mobile Number : +639********* (Philippines / Roaming)

Current Location : Philippines

Email Address : adbdvt@r.postjobfree.com

Position Applying for: QA/QC Piping Inspector or Piping Supervisor

To pursue a long term relationship with the organization where continual development of personal skill, knowledge and experience are acknowledged and participate in all aspect for achieving organizational goals and making SAFETY as the first priority.

Field Of Expertise:

Test Package Preparation.

Pressure Testing of Plant Piping system.

Pre-Commissioning Activities.

Inspection for Piping Fabrication, Erection and Construction including Hydrotesting.

Maintenance, Repair, Overhauling including servicing of On-Line manually operated valve, (like Gate Valve, Globe Valve, Ball Valve, PRV, PSV, NRV Steam Traps and Well head (Xmas Tree) and etc.

Qualification:

Degree in Bachelor of Science in Mechanical Engineering

Graduated March 2002.

More than ten (10) years experiences in Oil and Gas Construction Industry.

Saudi ARAMCO Approved QA/QC Piping Inspector

Well Familiar on different Industrial International Standard like. ( ASME B 31.1 Power Piping and ASME B31.3 Process Piping and Saudi Aramco Standard and etc.)

Certificate in ILM (Institute of Leadership and Management)

The Leadership and Supervisor Training Programme.

Certificate Serial Number: NB119012295102

Certificate in Basic Training Program for Drilling Personnel

International Association of Drilling Contractors IADC WellCAP W006, IADC Member A-076525. Conducted last September 16-29 October 2004.

Training on SCBA (Self Contained Breathing Apparatus) and Escape Set.

Training on How to Response Emergency (e.g. H2S and Gas Leakage, Fire and Explosion Emergency).

Training on Fire Fighting and Fire Control.

Training on Hazard Identification and Hazard Controls (e.g. Working at Heights, Confined Space, Electrical Safety.)

Experience Summary:

Well experience in Quality Control Inspection (QC Inspection) for Piping Works at Oil and Gas Construction Industry. With duties and responsibilities is to make sure that every single activity has to be done and completed as per the Industry Codes and Standard. Like ASME CODE B31,1 (Power Piping), ASME B31.3 (Process Piping), Saudi Aramco Engineering Standard. With knowledge and well experienced in Fabrication shop and Site inspection of Above Ground Piping including Material receiving, Installation of pre fabricated and fabricated spool, Installation of piping components and including Bolt Torquing. Well experience in Pressure testing like Pnuematic Testing and Hydrotesting. Also Line Checking and punchlisting and re-instatement activity.

Projects and Accomplishments:

1.Construction, Piping Fabrication and Pre-Commissioning Jizan Refinery and Marine Terminal Facility Project in Jizan Kingdom of Saudi Arabia.

2.Revamp and Construction of Sonatrach Algiers Refinery in Algiers Algeria.

3.Construction of YASREF Export Refinery on SP4 Utilities Package including the Construction, Piping Fabrication and Pressure Testing, Pre- Commissioning of 4 units Steam Boilers, Assorted Storage tank and its related piping system, A Saudi Aramco Project at Yanbu Kingdom Of Saudi Arabia.

4.Construction, Piping Fabrication and Pre-Commissioning of the Abu Ali Water and Oil Separation Plant (WOSP) additional units and Upgrading of Facilities, A Saudi Aramco Project in Abu Ali, Jubail Kingdom of Saudi Arabia.

5.Construction and Commissioning activity of Phase 1 and Phase 2 of the Feed Gas Preparation (FGP ) Site of Shell Pearl GTL ( Gas To Liquid ) Plant in Ras Laffan Industrial City in Qatar.

6.Construction and Pre- Commissioning Activity of the Ma’adin Sulphuric Acid Plant, in Ras Azawr Kingdom of Saudi Arabia.

7.Construction, Piping Fabrication and Pre- Commissioning Activity of the Petro-Rabigh Petrochemicals Refinery, A Saudi Aramco Project in Rabigh Kingdom of Saudi Arabia.

8.Construction Piping Fabrication and Installation of Geothermal Power Plant Piping and Cross Country Pipe line for the Philippine National Oil Company (EDC ) in Tongonan, Leyte, Philippines.

9.Supervision for the Valve Maintenance Servicing, Repair, Overhauling of Manually operated Valves, Steam Traps, and Well Heads for the Philippine National Oil Company (EDC) Geothermal Power Plants.

Employment Record:

Company : : Hanwha Engineering and Construction

Project : Jizan Refinery and Marine Terminal Facility Project in Jizan KSA

Contractor : Hanwha Engineering and Construction

Client : Saudi Aramco

Location : Jizan, KSA

Position : QA/QC Piping Inspector

Inclusive Date : 10 October 2017 to October 2019

Duties and Responsibilities:

: Piping QC Inspector for Material Receiving, Plant Piping Fabrication, Installation and Erection, Hydrotesting and Re-instatement activity.

Company : : Jurong Engineering Ltd.

Project : Algiers Refinery (Sonatrach) (Algiers Refinery Rehabilitation and Adaptation Project).

Contractor : Technip France

Client : Sonatrach

Location : Algiers (Algeria)

Position : QA/QC Engineer

Inclusive Date : 10 February to 23 October 2014

Duties and Responsibilities:

:QA/QC Engineer for Piping and Welding. Including Inspection of Skid mounted Equipment and Vessel.

Company : : Bonatti S.p.A Branch

Project : YASREF (Yanbu Aramco Sinopec Refinery Project)

Contractor : Bonatti S.p.A Branch

Client : Saudi Aramco

Location : Yanbu (Yanbu Kingdom of Saudi Arabia)

Position : QA/QC Piping Inspector

Inclusive Date : 27 May 2013 to 14 November 2013

Duties and Responsibilities:

: QA/QC for Piping Fabrication and Test Package Coordinator including Test Package Preparation, Testing and Documentation.

: Inspection and Hydrotesting of Steam Boilers and Assorted Storage Tank.

Company : Bonatti S.p.A Branch

Project : Abu Ali Plant (Upgrading of Water Injection Facilities and Water and Oil Separation Plant (WOSP) (Construction and Pre-Commissioning).

Contractor : Bonatti S.p.A Branch

Client : Saudi Aramco

Location : Abu Ali (Jubail Kingdom of Saudi Arabia)

Position : QA/QC Piping Inspector

Inclusive Date : 28 July 2011 up to 10 May 2013

Duties and Responsibilities:

: QA/QC for Piping Fabrication and Test Package Coordinator including Hydrotesting of Plant Piping, Valve Hydrotesting, System punchlisting and Re-instatement, site inspection and Material receiving.

Company : Hyundai Heavy Industries Co., Ltd

Project : Qatar Shell Pearl GTL (Gas to Liquid) Processing Plant (Construction and Commissioning)

Contractor : Hyundai Heavy Industries Co., Ltd & Chiyoda Corporation.

Client : JGC (Japan Gas Corporation) and KBR (Kellogg Brown & Root Int’l Inc.)

Location : Ras Laffan Industrial City, Ras Laffan Qatar

Position : Commissioning System Engineer

Inclusive Date : 03 June 2010 to 31 May 2011

Duties and Responsibilities:

: Piping System Inspection and Testing including Re-Instatement, Lube Oil Flushing, Water Flushing, Air Blowing, System Dry Out and etc.

Company Name : GAMA Industry Arabia Ltd.

Project : Ma’aden Sulphuric Acid Plant (Construction).

Contractor : Outotec Germany & GAMA Industry Arabia Ltd.

Client : Worley Parsons Co., Ltd.

Location : Raz Az Zawr, Jubail, Kingdom of Saudi Arabia

Position : QA/QC Mechanical Piping Inspector

Inclusive Date : January 2009 to November 2009

Duties and Responsibilities:

: QA/QC for Piping Fabrication, Hydrotesting of Piping System, Punchlisting, Piping Fit-up Inspection, and Material receiving.

Company Name : GAMA Al Moushegah Arabia Ltd.

Project :PetroRabigh Petrochemicals and Refinery (Construction and Pre- Commissioning).

Contractor : Sumitomo Japan & Technimont Arabia Ltd.

Client : Petro Rabigh and Saudi Aramco

Location : Rabigh, Kingdom of Saudi Arabia

Position : QA/QC Mechanical Piping Inspector

Inclusive Date : July 2007 to September 2008

Duties and Responsibilities:

: QA/QC for Piping Fabrication, Hydrotesting of Piping System, Punchlisting, Piping Fit-up Inspection, and Material receiving.

Company Name : Jerry Enterprises.

Project : Geothermal Power Plant (Construction and Maintenance)

Client : Philippine National Oil Company (PNOC-EDC)

Location : Tongonan, Leyte Philippines

Position : Mechanical Construction Supervisor

Inclusive Date : March 2003 to June 2007

Duties and Responsibilities:

: Cross Country Steam Pipeline Construction and Piping Fabrication.

: Valve Maintenance, Repair, Overhauling including servicing of On-Line Manually operated valve, (like Gate Valve, Globe Valve, Ball Valve, PRV, PSV, NRV Steam Traps and Well head (Xmas Tree) and etc.

Company : HIDECO SUGAR MILLING COMPANY INC.

Project : Sugar Milling & Refinery Plant (HISUMCO)

Location : Montibello Kananga, Leyte, Philippines

Position : Student Trainee (On Job Training) Under Plant Maintenance Department.

Inclusive Date : April and May 2001 (280 hours)

Duties and Responsibilities:

: Familiarization of Plant Operation and Components like Valves, Pumps and Conveyor.

Certification, Seminars & Training:

ILM (Institute of Leadership and Management) The Leadership and Supervisor Training Programme, Sponsored By Qatar Shell Pearl GTL .Qatar Petroleum, JK (JGC&KBR), and Qatar International Safety Centre.Ras, Laffan, State of Qatar,

Awarded last 14th February 2011,

Serial Number NB119012295102.

Course Name:

1.Introduction to HSE (Health and Safety Environment) and Leadership.

2. IIF-SSK (Incident and Injury Free Supervision Skills and Knowledge).

3. Communication Skills-Train the Trainer.

4. Cultural Awareness

5. Flawless Start-up TSTI and PTW.

6. Quality Control.

7. Planning and Organizing.

CBT (Computer Based Training) Sponsored By Qatar Shell Pearl GTL. Qatar Petroleum, JK(JGC & KBR), and Qatar International Safety Centre.

PVTC Ras, Laffan Industrial, State of Qatar, Conducted last October 24th to November 7th 2010.

Course Name:

1. Emergency Response (ER).

2. Hydrogen Sulfide( H2S) Awareness.

3. Hazard Identification (HI).

4. Mechanical Joint Integrity (MJI).

5. Management Pressure and Leak Testing (MPLT).

6.Confined Space Entry (CSE).

7. Non-Destructive Examination (NDE).

8. Electrical Safety Rules (ESR).

EDCO (Exploration Drilling Corporation)

Cebu City, Philippines Conducted last November 4th 2004

Course Name:

1.Training on Safety Handling of Materials and Equipments (Basic Rigging and Function of Roust About)

Basic Safety Training (BST)

National Maritime Polytechnic

Tacloban City, Leyte, Philippines Conducted last August 3rd to 12th 2004.

Course Name:

1.Training on Personal Survival Technique (Including Self Contained Breathing Apparatus (SCBA)).

2.Fire Fighting.

3.Elementary First Aid.

4.Personal Safety and Social Responsibility

5.( SOLAS) Survival of Life at Sea.

Oil Well Drilling Technology and Development Center Inc.

Cebu City, Philippines Accredited by: IWCF PH347, International association of Drilling Contractors IADC WellCAP W006, IADC Member A-076525. Conducted last September 16 to October 29 2004.

Course Name:

1.Basic Training Program for Drilling Personnel.

2.Hydrogen Sulfide (H2S) Awareness.

3.Self Contained Breathing Apparatus (SCBA).

4.First Aid at Oil and Gas Drilling Rigs.

5.Orientation on the Prevention of Maritime Pollution by Oil, MARPOL 73/78.

6.Fire Fighting on On-Shore and Off-Shore Drilling rigs.

TESDA (Technical Education and Skills Development Authority)

Tacloban City, Leyte, Philippines. Conducted last September 16th 1999 to January 7th 2000.

Course Name:

1.Automotive Mechanic.

2. Engine tune up.

3. Engine troubleshooting.

4.Automotive wirings.

Personal Details:

Current Location : Philippines

Total Years of experience : 10 Years

Date of Birth : 20 May 1979

Nationality : Filipino

Passport Number : P2329367B

Passport Issued Date : June 26 2019

Passport Expiry Date : June 25 2029

Contact Details:

E-mail address : adbdvt@r.postjobfree.com or adbdvt@r.postjobfree.com

Mobile Number Philippines : +639********* (Philippines Roaming)

Years of Experience in Oil and Gas and Power Generation Plants : 10 Years

Special Skills:

1.Computer Literate; Microsoft Word, Excel.

2.Maintenance and Servicing: Industrial manually operated Valve for Geothermal Pipeline (Like Gate Valve, Ball Valve, Globe valve, PRV, PSV, NRV, Xmas Tree, Steam traps and etc.).

3.Vehicle Driving; with restriction code 1, 2 & 3 Philippines Driving Licence

4.Welding works; SMAW and basic welding jobs.

Educational Attainment:

Bachelor of Science in Mechanical Engineering

(EVSU) Eastern Visayas State University, Tacloban City, Philippines

Formerly (LIT) Leyte Institute of Technology

Graduated, March 2002

Languages/Dialect spoken:

English/Tagalog

I hereby certify that the above information stated in this document is true and correct to the best of my knowledge and belief.

Jerry Von L. Glori

Applicant



Contact this candidate