‘’ Electrical Engineer with +13 years’ Experience in constructions projects specializing in fields of "Electrical - MEP - Infrastructure"

‘’ Experiences as Main Contractor with EPC companies in Implementation of Mega Projects through all Project life cycle: Technical support, Infrastructure, Execution

,Testing - Commissioning, Pre-hand-over, Snag list, End-user requests

‘’ Coordination’s of MEP work Package also other disciplines

‘’ International Consultancy Experiences – Engineering & Management, Technical support & Submittals review's ” Design, Shop drawings, Materials,… Supervision - Inspections for all Implementation steps,, FAT & SAT tests and reports

‘’ Design and Calculations for Lighting & Power Electrical systems “various programs”

‘’ Able to manage multi tasks in same time for the Electrical systems, Low Current systems and MEP Co-ordinations

‘’ Solid Experience in “LV-MV” systems and Items: Transformers, MDB’s, DP’s, UPS ATS, Generators, Cables, Synchronization Panels, Earthing and Lightning Protection Switchgear and RMU Connections and testing & commissioning.

‘’ Technical experience in Low current systems IP Data system, PA, Fire Alarm & BMS

‘’ Testing, Commissioning implementation for Low Current system items & SCADA system

‘’ Investigation of all QC/QA Discipline Procedures, Reports and Recommendations

‘’ Familiar with international electrical standards: NEC, BS, IEC, NFPA, RC & SBC

‘’ High Interpersonal Skills, Communication, Negotiation's, Representation Skills

‘’ Manage my work Scope items and smooth out obstacles for team work

‘’ Management Skills support Scope of work: Identify approaches, deliverable's, Schedules & Resources to ensure delivery of project items within established constrains

‘’ PMP – Certified @ PMI - Diploma in HSE: Health & Safety Environment @ IAS EXPERIENCES AREAS.

A

Health Care / Hospitals Construction’s

Hotels & Hospitality Construction’s

High Rise & Security Buildings

Management – Control &

Coordination’s

INTERESTED AREAS.

A

Consultancy & Contracting

Construction’s – Renewable Energy

Airports & Mega Projects

KEY ACHIEVMENTS

Completion of Large Scale & Complex Constructions Projects within Budget Finishing +5 Projects – Turn Key deliverables

participating in +02 Different types of Constructions Projects with different tasks Saving company cost: Value Engineering & Control of Changes to work scope Success in Projects Control – Different cases & different working environments CORE SKILLS

Supervision & Consultancy Design LV Systems & Technical Supports Execution & Team Leader QA/QC – QS – MEP Coordination’s Software: AutoCAD – Ecodial – Dialux Evo - Etap - “Excl – word – PP….” Revit in progress Management: Team Leader – Communicaions – Resources – Scope work package Saudi Council for Engineers

Egyptian Engineers Syndicate

PMI - ID: 5004004

IASP / ID: 532334

EDUCATION&CERTIFICATIONS

B.S.C in Electrical Engineering (BHIT)

BENHA UNIVERISTY – College of Engineering

PMP – Project Management Professional

PMI – PROJECT MANAGEMENT INSTITUTE

2001- 2006

2017- 2020

HSE Diploma – Health Safety Environment @ IASP

1992-2005

NASP/IASP National Associate of Safety Professional Sr Electrical Project Engineer HASHEM CONTRACTING and TRADING Co Jan 2018 - Present Is an EPC - Company – Classified as Class A in Contracting business Specialize in Constructions – Turn Key Projects Handing over Saudi Arabia

PROJECT

BUDGET

Description

Electrical Systems

Low Current Systems

TASKS & ACHEIVMENTS

Technical Tasks

Coordination’s

Managements Tasks

with experience of over 50 years;

DMFH Project - Dr Mohamed Al-Fagih Hospital - www.dmf.med.sa Saudi Arabia – Riyadh

650 Million SAR - MEP: 210 Million SAR - Electrical 96 Million SAR 351 Bed Health Care Construction Project & 157 Outpatient Clinic Consist of 2 Buildings: Hospital Building, Clinic Building & Link Bridge - Total Area: 22000 M2 MVA contracted: 24 MVA - Hos Building: 17.5 MVA – Clin Building: 6.4 MVA

+17 Systems related to Electrical works : MV, LV and Low Current MV System: Switch Gear, MV Cables, RMU and Oil Transformers LV System : MDB, LV Cables, ATS, Generators, DP, Disbo Panels, DS, UPS, Isolation Power Panels, out lets of Power System normal and Industrial & Lighting system indoor and outdoor Protection Systems : Grounding systems MV, LV and LC & Lightning Protection system IP DATA ‘’ CAT6 A” : CCTV, Telephone, Data, WIFI, Clock, ACS, Time Attendance, A/V & Digital Signage IPS : Infant Protection System – Magnetic Door Holder – PA: Public Address NCS : Nurse Call System

FA : Fire Alarm – Brand :Simplex BMS : Brand Jonson Control Assigned for different tasks, multi duties as per Company requests, My Experience and Project progress

Design / Shop drawing reviews and supporting as per supplier recommendations and SBC Revise submitted Drawings and Consultant notes

Quantities Revised to add or reduce the updated Quantities Inspected of delivered materials and following the suppliers – handing over “MIR’s” Implementation of Infrastructure 1st & 2nd fix for different systems and works : Piping, Wiring, Cable tray, Fixing Panels, Pulling Cables & Terminations, Earthing Investigation of QA/QC recommendations and reports Develop level of executed works as per QA/QC Method Statemen & approved Drawings Prepare & pricing and Issue of variation orders for additional works 3rd fix installations : Implementation – Inspection and Hand over Testing - Commissioning and Handing over

Familiar and attendance of FAT. Factory Acceptance Tests and checking FAT procedures & reports Investigation of SAT – Site Acceptance Tests with procedures & reports Medium Voltage items tested by supplier attendance and issue testing reports Low Voltage system items testing : MDB’s, Cables, Panels – Generators – UPS & Earthing system Low Current system items testing : IP Data – check continuity, length and terminations Flock Teste FA – Addressable Fire Alarm system testing check : Continuity, Grounding and matching FA scenario with Civil Defense zones and HVAC System

BMS tested for 1st, 2nd and 3rd fix installations

with following of Suppliers recommendations for each system Pre-Handing over for all systems – following and solving all notes related to …. Snag list by consultants and/or Civil Defense requests and requests of End user Final handing over “testing – Commissioning” to Client, End user with finishing final notes Affected sharing with MEP coordination’s team work Coordination’s and solve of obstacles coming from crossing MEP systems installations Such As HVAC ducts and related installations: FCU, AHU, FAHU, FANS and CHILLERS with BMS Items

“Cables, Sensors and rely boxes connections” & requested feeding power – other systems Plumbing System – Supply, Drainage and Fire Fighting system for both critical areas : FM200 unites for Critical areas and normal areas - also Coordination’s with MGS : Medical Gases System Coordination’s with other disciplines as requested such as Arc departments for Reflected Ceiling Manage Communication’s and relationships between all project stakeholders. Lead team work – over 200 Persons - Redistribution as per needed tasks Develop Manage and issue reports related to progress Monitor - Manage and control of sub-contractors works and the related invoices Negotiation of Variations and additional works – to saving project budget Representative Electrical side for weekly and monthly Meetings with Client & Consultant Control the risks may coming through suppliers and other involved - Smooth out the Obstacle’s and working to protect - rather than facing Report to: PM & Chief of MEP Department

www.hashem-contracting.com

Site/Sr Site Electrical Engineer PROGER SPA - Engineering & Management Co Jan 2014 - DEC 2017 Is an - International Consultant Company – Multinational Business Specialize in Engineering & Management Solution’s

Saudi Arabia

PROJECT

BUDGET

Description

TASKS & ACHEIVMENTS

Technical Support Engineer

Jan 2014 - Jan 2015

Head Office - Riyadh

Site/Sr Site Electrical Engineer

Jan 2015 - Dec 2017

AL-Madinah Region - Yanbu

Technical Tasks

Managements Tasks

Design – Supervision - Technical Support & Projects Management. KAP3 Program – King Abdullah Project to Development MOI Security Buildings Saudi Arabia – Riyadh / Yanbu EPC Contractor: sbg - Saudi Binladen Group 14 Billion SAR 610 Sites around all Saudi Arabia

MOI ‘’ Ministry of Interior’’ strategic program of security Buildings Developments – KSA PROGER spa is responsible for Engineering & Consultant - Supervision to development all constructions steps for 610 sites through 23 prototypes of Security Construction Buildings Responsible for both Electrical Low Voltage systems and Low current systems Review submitted Shop drawings by the contractor and commented it reference to SBC – Saudi Building Code

Review submitted Specs and Tender drawings & IFC Drawings issued by Zuhair Fayez Partnership Checking for Samples of delivered Materials

QS - Quantity Surveying for Electrical items and matching between BOQ’s and Tender Drawings

– and consider the exact quantities + or - as per approved shop drawing QC – Revise the Method Statements for Electrical items installations “ MS” Revise Sharing in handling and arrangements requested documents to in stage of start up the Execution phase

FAT “Factory Accepted Tests” reports reviews for delivered Materials Samples Project Description

11 Separated Construction Sites – Security Buildings in the west area of Saudi Arabia MOI buildings Such as:

Police Offices – Passports office – Border Defense unites – Drugs Control police – Traffics unites Acting as Sr Electrical Resident Engineer

Electrical team : 2 fresh graduated Saudi Electrical Engineers – 2 Electrical Controller Inspection and Review sites work in Startup stage

Revise for Coordination’s of Infra-Structure Electrical works with other driplines Inspection of execution steps as per approved MS by QC Discipline Monitor and follow up Contractor for all related permits has to issue by Saudi Organizations Continually updates issued from Main Central Area and Head office Inspection the submitted executed works by WIR’s / RFI’s – QCI’s Revise all the submitted quantities with BOQ quantities Conforms all Electrical works items : Low Voltage systems and Low Current systems Inspection and received all infra-Structure executed works Such as : Underground Cables “MV – LV – Low current” Panel Boards - Piping and wiring works Coordination’s the interfacing with SEC and STC as requested SAT – Site Testing for delivered material for both visual / physical test, Component and Specs Auditing for supply all SAT tested reports

Continuous following for progress works and issue related reports to the Central Area Manager Inspection and received all 3rd fix Installation for LV system items as per Approval Shop Dwgs Such as : Lighting fixtures – Power outlets – MDB’s – DP’s – Transformer / oil type Inspection and received all 3rd fix Installation for LC system items as per Approval Shop Dwgs Such as : Fire Alarm devices “ HD – SD – CM – BELL’s – Glass Breaker & Manual station

: CCTV – BMS Partially – telephone out lets – Data out lets – ACS Review Quantities as per final executed for systems has been executed finished Coordination’s with MEP disciplines as requested such as Arc departments for Reflected Ceiling Manage and Lead Electrical team to Inspections works over all the 11 Sites Monitor the work progress by Contractor and issue progress reports to Area Manager Manage Communication’s and relationships between all project stakeholders. Following the End-users requests and negotiation it as per scope of work Representative Electrical side for weekly and monthly Meetings with MOI representative & Contractor

Manage the Obstacle’s and working to protect - smooth out rather than facing Report to: Area Manager - QA/QC Manager www.proger.it Site/Sr Site Electrical Engineer REHANA Hotels Group – Engineering & Construction Branch 2010 - 2013 Is an – Integrated Hotels group – Sharm El-Sheikh – Red Sea Specialize in Hospitality & Constructions Solution’s Egypt

PROJECT 1

Description

PROJECT 2

Description

PROJECT 3

Description

TASKS & RESPONSIBILITIES

Technical Considerations

with experience of over 40 years;

Rehana Resort - 4 Stars hotel - Constructions up to Turnkey deliverables. 118 Hotel rooms – different classification: Junior, Suite and Luxury rooms & Reception Building Consist of 2 Kitchens, 3 Restaurants, 5 Swimming pools, Sports areas, Boilers – Landscape Areas MV room: 2 RMU, MV Cables come and out to Transformers LV rooms: Oil Transformer – Dry Transformer – ATS units - MDB’s and Distribution Panels rooms Low Current & Control rooms : Addressable FACP – MDF Main - Distribution Frame for telephone

, Sound system Amplifiers – Data Switches – Master Antenna TV system Electromechanical rooms – Services for Swimming pools – Pumps room – HVAC system Waste water treatment plant

Rehana Royal - 5 Stars hotel – Extension & Development -Turnkey deliverables. 10 Villa’s Buildings – Each Villa contains 2 levels – 5 Hotel rooms – Juniors and Suites rooms & 12 Swimming pools “small areas”

Suites Building: consist of 24 VIP luxury rooms – Main Restaurant Staff Housing ‘residential Project’& Main Admin Building - Turnkey deliverables. Complete Staff Housing Project - Consist of

Main Housing Building + all requested services - such as: Kitchen & Dining area – Sports Area – Electrical room “Oil Transformer, MDB & Distribution Panels” Electromechanical service room “Water Pumps – Heating system – FF Pumps …” Main Admin Building

Administration Building to manage all business related to Hotels: Financial, Maintenance, Procurements Consist of 4 levels – contains administration offices with different areas Systems inside the Building: Low Voltage : power – lighting Low Current systems : Fire Alarm – Telephone – Data outlets – WIFI - ACS Assigned for Various tasks, multi duties as per Company requests & Work needed Electrical team : 2 Electrical Engineers – 3 Electrical Forman – Over 122 “Technicians & Helpers” Implementation of Infra-Structure for Electrical works – “MV,LV” Direct buried & Banks MEP Coordination for underground services related to Swimming pools Review Design Drawings and sharing in shop drawings issued Quantity Surveying for multi items and issue the procurement order with specific quantities Arrange & Handling the team work as groups to be can cover all requested works in available time Inspection of internal Infra-Structure inside buildings “Piping & Wiring” for all systems as per

,approval Shop drawings.

Following with suppliers to safe time of material delivering Following with Electrical Company to connect the additional MVA for new works Review ‘’Design & Shop-drawings’’ and comments it as per specs and Egyptian building code Execution of Lighting system inside swimming pools and land scape & Sports areas Execution of complete power system starting from MV works “Switchgear connections – RMU

,terminations – Transformers ‘’Oil & Dray’’ connections – MDB’s & DP’s Terminations – DS

,Disconnect Switches connections - 3 phase Industrial Sockets – Power outlets – Lighting Fixtures

,installations – Out door Lighting Poles 3 meters, 4 meters – Facade Lighting installations Execution the Infra-Structure for Low Current systems : 1st & 2nd Fix Following and Checking LC subcontractors through 3rd Fix and Devices Installations Execution of Protection systems separately – LV Earthing system - LC Earthing system – LPS Design power and Lighting systems for Main Administrations Building Using Dry Transformer instead of Oil Transformer ‘’112 % of rated MVA + Cost Saving ‘’ Testing and Commissioning for LV systems – Sharing in LC Testing – also Learning Double Protection for JAKOZY unites by using ELCB – Earth Leakage Circuit Breakers 0.003 Ohm Sharing in many tasks and works related to Maintenance Department Swimming pools Lighting Fixtures with IP 68 – with Supplier recommendations Report to: Projects Manager & Chief of MEP Department www.rehanaresorts.com

Electrical Engineer ALSAFWA FOR GENERAL CONTRACTING Co 2006 - 2010 Is an EPC - Company – Civil and MEP Contractor - Specialize in Constructions – Turn Key Projects Handing over Egypt

PROJECT 1

Description

PROJECT 2

Description

PROJECT 3

Description

TASKS & RESPONSIBILITIES

Freelance work Experiences

Cairo

Al-khamaiel City Sport Club - Constructions up to Turnkey deliverables. Sport Club related to large scale residential city – Located in Cairo – 6 of October City Consist of : 4 Olympic tennis courts

: 2 Olympic Swimming pools

: 1 Olympic Football court

: Admin Building – Services Buildings - Entertainment Areas Construction of 24 Residential Buildings “typical” - Turnkey deliverables. 24 Residential Buildings as Integrated Branch within residential compound specified for Egyptian Army Each Building consist of 6 levels – Each level has 4 residential unit ‘’residential flat’’ 1 Main traffic and landscape Areas

SHARM EL-SHEIKH National Museum.

Large Scale archaeological & touring Construction Project,, Consist of : Many Archaeological Halls Buildings – 7 Halls for different purposes Administration Building - Services rooms

All Buildings designed with High level of monitoring system and Security system Al-khamaiel City Sport Club - Participation in

Implementation of Electrical works related to Infra-Structure preparing and installations Finishing of Underground MV Cables & LV Cables Network Quantity Survey for Cables quantities through shop drawings and sites conditions Quantity Survey for Lighting system – lighting Fixtures, switches types and - power outlets types Shop drawings for Lighting and power system

Construction of 24 Residential Buildings - Participation in Finishing of Electrical works related to Infra-Structure preparing and installations for Main Road Implementation the Street light Lighting poles : 6 m Infra-Structure underground works – Buried cables “MV,LV” Direct buried & Banks Review for quantities and matching between the BOQ quantities and shop drawing quantities Shop drawings for Lighting and power system

Execution of Electrical works 3rd fix installations for distribution Pillars – Buildings DP’s

,Power outlets – Lighting Fixtures and Switches

SHARM EL-SHEIKH National Museum - Participation in Complete of Electrical works related to Infra-Structure preparing and installations Coordination with Plumbing system for underground Supply and Drainage passes Finishing of Underground MV Cables Network – Direct buried installations with consider : Excavation – with Sand Layer – burier blocks – MV cables – Sand layer – upper blocks – warning tab Implementation of Underground LV Cables Network – duct bank buried with consider

,ratio of cables to conduits – Backfilling

Update Cables quantities as per site conditions and Approval shop drawings in order to PO issuing Finishing of all Electrical 3rd Fix works – Power, Lighting, Fire Alarm devices, CCTV camera’s - for 1 hall as sample to revise by the Ministry of Antiquities in Egypt. Report to: Projects Manager & Chief of MEP Department www.Alsafwa.com Design Electrical power & Lighting for many of separated buildings Redistribution the loads to solve over load and Equipment’s shutting down for factory Solve the high cost of Electrical invoice – additional Capacitor bank unit Design and Execution Earthing system for factory – less than 3 Ohm earthing resistance Shop drawings for Power and Lighting systems related to construction of hotel building Team Leader

Manage & Development

MAIN DUTIES

Preparation - support - communication with team and review for updates. Ensure that Each work item with the fit person to maintained Quality level. Monitor team compliance with the scope of work at all times. Address & Provide innovative solutions to current challenges. Represent my work side in all meetings with maintain of targets. Analysis of risks, obstacles to protection before facing and smooth out it. Contracting Implementation Electrical Activities “quality level, time, resources, budget Monitor subcontractors all times - and direct them company targets Inspection of delivered materials if as Specs & one of identified suppliers Supervision Inspection implemented works “Approved shop drawings & MS” Manage all Submitted Drawings and documents - Review & Comments as per standard and accepted technical requirements Technical Support Design, Shop Drawings reviews

QS & reviews quantities different between BOQ items and Drawings Coordination’s MEP Coordination’s, test, evaluate integrated of Electromechanical systems managing Coordination’s between many discipline’s as needed for work Testing & Commissioning Manage and sharing in Tests works for Electrical systems, materials & Equipment’s - FAT and SAT, Commissioning and start up systems Quality QC/QA Apply technical knowledge & Method Statements as per QC department Familiar with Quality reports Daily – Weekly and Quality team meetings ADDITIONAL DETAILS

Commitment and trust Value Engineering Participations with PARSONS and Royal Commission JAZAN Negotiation skills Design Programs for Electrical systems High Communication Skills ECODIAL – AutoCAD 2D – Dialux Evo - PCM: Primavera contract Management Analytical & Critical thinking Proficient in, MS Office: Word – Excel – Power points Presentation & meetings management Very good in written and spoken English language Staff management & Leadership Currently Improvement: Revit for MEP works & Schneider certifications REFERENCES