Post Job Free
Sign in

Document Controller

Location:
Jubail, Eastern Province, Saudi Arabia
Salary:
3500
Posted:
January 19, 2020

Contact this candidate

Resume:

ARMANDO V. MERIDA JR.

FEMCO Camp, Al Jubail *****, Saudi Arabia

+966-**-***-****

adbcof@r.postjobfree.com

OBJECTIVE

To work in a challenging and stimulating environment with an opportunity to enrich my skills, knowledge and to enhance my experience to contribute toward the achievement of the organization objective. CAREER SUMMARY

Nine (9) years of experience as a Document Controller in different fields/disciplines in construction (Sea Water Cooling Pump Station, Civil and Structural works, HV to LV electrical works and Pipeline works, and District Cooling Plant in Community Area). Main career highlights are as follows:

Considerable experience in managing quality documentation functions in an ISO certified environment.

Sound knowledge in the use of web-based tools, MS Outlook, WORD, Excel and PowerPoint.

Prepare and review statistics and reports.

Quality Control Program (QCP) Review Committee

Ability to work independently and in a team environment.

Strong interpersonal, analytical, and teamwork skills.

Ability to Work Under Pressure.

Self-motivation.

WORK EXPERIENCE

1. Position: Document Control Supervisor Duration: January 2018 - Present Employer: FAISAL ELECTRO-MECHANICAL CO. LTD. (FEMCO) Client: Royal Commission in Jubail

Consultant: Saudi Arabian Bechtel Company (SABCO)

Project: P&C of District Cooling Plant in Community Area (097-C78) Location: Al Jubail, Kingdom of Saudi Arabia

Specific Duties and Responsibilities/Scope of Work:

Develop and maintain a “Technical Submittal Log” that will be used to track all submittals to the Royal Commission and the status of review to provide assurance that work related to the submittal can proceed (Code1 or Code 2).

Assign a transmittal number and submittal number and enter these in the Technical Submittal Log.

Deliver the submittal to the Royal Commission’s representative, obtain all required delivery receipts and log the submittal date into the Submittal Log.

Responsible for receiving all submittals reviewed by the Royal Commission’s representative.

Updating the Submittal Log and notifying the Project Manager of the Submittal’s review Code status.

Responsible for implementing the document control requirements.

Record keeping of received and sent letters to the various consultants and other contractors.

Store and maintain company documents in both electronic and physical forms.

Distribute all outgoing and incoming transmittals.

Maintain electronic registers for letters, MOM, Memos, RFIs, Reports, Transmittals, Drawings & Quality related documents.

Ensuring all documents are up to date as possible within the electronic filing system.

Scan, image, index, and organize documents project-wise.

Review completeness, accuracy, and authenticity of documents.

Perform basic quality checks of documents

2. Position: Document Control Supervisor Duration: March 2014 – January 2018 Employer: FAISAL ELECTRO-MECHANICAL CO. LTD. (FEMCO) Client: Royal Commission in Jubail

Consultant: Saudi Arabian Bechtel Company (SABCO)

Project: P&C for Sea Water Pump Station (201-C01)

Location: Ras Al Khair, Kingdom of Saudi Arabia

Specific Duties and Responsibilities/Scope of Work:

Develop and maintain a “Technical Submittal Log” that will be used to track all submittals to the Royal Commission and the status of review to provide assurance that work related to the submittal can proceed (Code1 or Code 2).

Assign a transmittal number and submittal number and enter these in the Technical Submittal Log.

Deliver the submittal to the Royal Commission’s representative, obtain all required delivery receipts and log the submittal date into the Submittal Log.

Responsible for receiving all submittals reviewed by the Royal Commission’s representative.

Updating the Submittal Log and notifying the Project Manager of the Submittal’s review Code status.

Responsible for implementing the document control requirements.

Record keeping of received and sent letters to the various consultants and other contractors.

Store and maintain company documents in both electronic and physical forms.

Distribute all outgoing and incoming transmittals.

Maintain electronic registers for letters, MOM, Memos, RFIs, Reports, Transmittals, Drawings & Quality related documents.

Ensuring all documents are up to date as possible within the electronic filing system.

Scan, image, index, and organize documents project-wise.

Review completeness, accuracy, and authenticity of documents.

Perform basic quality checks of documents

Additional Project Scope for 201-C01 Project

DCN no. 6 Sand Cut & Fill - (October 2017 – April 2018)

DCN no.5 Field Lamination and Pipe Laying of GRP/FRP Pipe Fitting - (May 2017 – January 2018) 3. Position: Electrical Draftsman cum Document Controller Duration: May 2011 – January 2014 Employer: ACC Electrical Contractor

Project: Building and Residential

Location: Quezon, City Philippines

Specific Duties and Responsibilities/Scope of Work:

Assemble documentation packages and produce drawing sets which are then checked by an engineer or an architect. Draft working drawings, wiring diagrams, wiring connection specification or cross sections of underground cables. Draw master sketches to scale showing relation of proposed installations to existing facilities and exact specifications and dimensions.

4. Position: Maintenance Technician Duration: August 2006 – January 2007 Employer: WOKUNG Industries Co. Ltd.

Location: Rosario, Cavite Philippines

Specific Duties and Responsibilities/Scope of Work:

Responsible for the maintenance of safe operations, testing and cleaning of machineries and electrical equipment’s gather inspection data & observation of purpose of protection. SEMINARS AND TRAINING

May 2011 AUTODESK Authorized Training Center

(AutoCAD 2011 with Color Rendering)

Microcadd SM North, Philippines

Feb 2015 PRO Syndicate Consulting & Training Wing

(ISO 9001:2008 Awareness)

Al Khobar, Kingdom of Saudi Arabia

EDUCATIONAL BACKGROUND

TERTIARY POLYTECHNIC UNIVERSITY OF THE PHILIPPINES B.S. ELECTRICAL ENGINEERING

1998-2000 (Undergraduate)

SECONDARY TERNATE NATIONAL HIGH SCHOOL

Graduated - April 1997

PERSONAL PROFILE

BIRTH DATE : 24 December 1980

AGE : 38 years’ old

CIVIL STATUS : Married

SPOUSE : Ma. Charissa Dela Cruz Merida

SAUDI DRIVING LICENSE : 236-***-****

PASSPORT NO. : P4998855A (Validity: 08 November 2022) CHARACTER REFERENCE

Pacasum Sambrani : Corporate QA/QC Manager

Faisal Electro-Mechanical Company Limited (FEMCO)

P.O. Box 76164 – Al Khobar 31952 – K.S.A

Mobile # +966-**-***-****

Salih Alpaslan : Project Manager

PC Marine Services, Limited, LLC

P.O. Box: 12433, Jeddah 21473, Saudi Arabia

Mobile # +966-**-***-****

Royal Commission for Jubail and Yanbu

Directorate General of the Royal Commission in Jubail PDMC TRANSMITTAL

PLEASE ACKNOWLEDGE RECEIPT AND RETURN IMMEDIATELY

RC Transmittal No;

Contract No; 201£01

FCS; Elrefaie. Abdulrahman

DATE; 23-Aug-14

!2QCUMENT STAT 'A!<IIQN FQR OTHEB§ S!,!BJE!<T £QQ& 1. 0 WORK MAY PROCEED 5. 0 FOR APPROVAL 0 RC DRAWING B 0 0 SUPPLIER APPROVAL S

2. REVISE MAY PROCEED AND RESUBMIT. SUBJECT WORK TO 6. 0 CONSTRUCTION 0 RFC DRAWING RD INCORPORATION OF CHANGES

7. 0 PRELIMINARY USE 0 DCN/SCN OS

3. 0 REVISE AND RESUBMIT. WORK 0 0 SHOP DRAWING SH MAY NOT PROCEED 8. REFERENCE 0 TECHNICAL SUBMIITAL TS 4· 0 REVIEW NOT REQUIRED 'WORK

9. 0 OTHERS 0 TECHNICAL QUERY TQ

MAY PROCEED -. .. 0 AS BUILT AB 0 SPECIFICATION Y

.., •• • .. ."- .•• -., -,,_., - • ~ w" ••. .., •• ". -'" _ ••. - -, "-' .•,." • .",- •• -.• •• -- - " · 1

,AITENTION SUPPLIERS: ALL FINAL DRAWINGS SUBMIITEO TO THE ROYAL COMMISSION MUST BE IN GOOD QUALITY MYLAR,

~ -~·u~;riUOr~·N~ .. ··· ""j Re~ r· .. _· __ _·_·_-- --ri;s,;r~i~It, .. _.- ~·p:c·ti~c -: A~iioni:'" .. ·" ··R;j -~ 1 on No 1 ode . Code ! ' Trans'No -'" -.- --J

... _ _,. __ -'_ _ .. _ _ Date Recelved.J 01-035-02 2 CV-Document Control SV-Armando Merida

(replacing Virlex Ocinar)

01-037-02 2 CV-ES&H Officer-Ira Laeson

01-089-00 0 CV-ES&H Officer-Jeffrey Garcia

13-003-00 0 DC Cables-MIS Tekab

15-055-00 0 Airconditioning Equipment-PACU-05003

15-061-00 0 Airconditioning Equipment-PACU-09001

T otalltems: !

FEMCO

... _ " " .. " " -' .. --', .. "., " .. ",; 1 X

1 T5

1 X

2 T5

3 T5

3 T5

294

274

280

265

224

230

8/1112014

8/512014

8/6/2014

7/2212014

6/2212014

612212014

-- -._._ _ .., ... ", .., .. ~ Date 24-Aug-14

KINDLY SIGN AND RETURN THE ORIGINAL FORM TO THE ROYAL COMMISSION Processed By: JQlliZ ROYAL COMMISSION FOR JUBAIL AND YANBU

MADINAT AL-JUBAIL AL-SINAIYAH

CONSTRUCTION DEPARTMENT

SUBMITTAL REVIEW

REVIEWER

DATE IN 811112014

COMPLETE

DDC/DWG. NO 01·035·02 REV,

DOC/DWG TITLE:

CV-Document Control SV-Armando Merida

(replacing Virlex Ocinar)

COMMENTS'

COMMENTS MUST BE WRITTEN LEGIBLY

FOR TRANSMISSION TO CONTRACTOR

IMPORTANT:

~

1 WORK MAY PROCEED o REVISE AND

3

RESUBMIT, WORK MAY

2 REVISE AND NOT PROCEED

PROCEED RESUBMIT, SUBJECT WORK MAY TO 4 o REVIEW NOT INCORPORATION OF REQUIRED, WORK MAY

CHANGES INDICATED

DISTRIBUTION REQUIREO? 0 YES

IMPORTANT: PERMISSION TO PROCEED DDES NOT CONSTITUTE ACCEPTANCE OR APPROVAL OF OESIGN DETAILS, CALCULATIONS ANALYSES, TEST METHODS OR MATERIALS DEVELOPED OR SELECTED BY THE SUPPLIER DOES NOT RELIEVE THE CONTRACTOR FROM HIS CONTRACTUAL OBLIGATION

SIGN:

f7fTr/--

CDNTRACT NO.

CONTRACTOR TRANS. ND. :

RC TRANSMITIAL NO

DATE

AS MUCH AS POSSIBLE, COMMENTS MUST BE WRITIEN ON THIS FORM OR ATIACHED PAGES. COMMENTS WHICH CAN ONLY BE POSSIBLE ON THE CONTRACTOR'S SUBMITIAL MUST BE INDEXED ON THIS FORM. DOCUMENT STATUS APPLIES TO TECHNICAL CONTENT ONLY. USE OF FOREIGN' MATERIALS, EQUiPMENT AND SERVICES IS SUBJECT TO ROYAL COMMISSION'S APPROVAL. ONCE THIS TECHNICAL SUBMITIAL IS GIVEN CODE 1 OR 2 STATUS, CONTRACTOR SHALL SUBMIT VENDOR APPROVAL(WITH TECHNICAL SUBMmAL PACKAGE) FOR ROYAL COMMISSION'S REVIEW. PROCUREMENT PRIOR TO THIS APPROVAL IS DONE AT THE CONTRACTOR'S OWN RISK Monday, August 11.2014

.' .: •. =; oJ ' ~ .• ~ " : ~ . .. . . . . ', ROYAL COMMISSION FOR JUBAIL AND YANBU

MADINAT AL-JUBAIL AL-SINAIYAH

CONSTRUCTION DEPARTMENT

SUBMITTAL REVIEW

097-C78

178

CV OF PROPOSE DOCUMENT CONTROL

SUPERVISOR-ARMANDO V. MERIDA JR.

CONTRACT NO. :

CONTRACTOR TRANS. NO. :

DOC/DWG. NO

DOC/DWG TITLE:

WORK MAY PROCEED

YES

REVIEWER :

COMPLETE :

DISTRIBUTION REQUIRED?

COMMENTS:

COMMENTS MUST BE WRITTEN LEGIBLY

FOR TRANSMISSION TO CONTRACTOR

IMPORTANT:

AS MUCH AS POSSIBLE, COMMENTS MUST BE WRITTEN ON THIS FORM OR ATTACHED PAGES. COMMENTS WHICH CAN ONLY BE POSSIBLE ON THE CONTRACTOR'S SUBMITTAL MUST BE INDEXED ON THIS FORM. IMPORTANT: PERMISSION TO PROCEED DOES NOT CONSTITUTE ACCEPTANCE OR APPROVAL OF DESIGN DETAILS, CALCULATIONS ANALYSES, TEST METHODS OR MATERIALS DEVELOPED OR SELECTED BY THE SUPPLIER DOES NOT RELIEVE THE CONTRACTOR FROM HIS CONTRACTUAL OBLIGATIONS.

1

2 REVISE AND RESUBMIT,

WORK MAY PROCEED

SUBJECT TO

INCORPORATION OF

CHANGES INDICATED

CS

DATE IN : 5/7/2018

RC TRANSMITTAL NO :

DOCUMENT STATUS APPLIES TO TECHNICAL CONTENT ONLY. USE OF FOREIGN MATERIALS, EQUIPMENT AND SERVICES IS SUBJECT TO ROYAL COMMISSION'S APPROVAL. ONCE THIS TECHNICAL SUBMITTAL IS GIVEN CODE 1 OR 2 STATUS, CONTRACTOR SHALL SUBMIT VENDOR APPROVAL(WITH TECHNICAL SUBMITTAL PACKAGE) FOR ROYAL COMMISSION'S REVIEW. PROCUREMENT PRIOR TO THIS APPROVAL IS DONE AT THE CONTRACTOR'S OWN RISK.

Resident Engineer: SIGNATURE

4

3

REVIEW NOT REQUIRED,

WORK MAY PROCEED

REVISE AND RESUBMIT,

WORK MAY NOT PROCEED

CS

CS

CS

CS

01-015-01 REV: 1

Monday, May 07, 2018

X

X

Yahya Siddiqui Digitally signed by Yahya Siddiqui

DN: cn=Yahya Siddiqui, o, ou, email=adbcof@r.postjobfree.com, c=US Date: 2018.05.13 18:18:17 +03'00'



Contact this candidate