Post Job Free

Resume

Sign in

Electrical supervisor

Location:
Hubli, Karnataka, India
Salary:
50,000 Rs
Posted:
January 19, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

Mr. HALASWAMY. K.P

Mobile no: 959*******,

EMAIL ID: adbcke@r.postjobfree.com

PROFESSOINAL OBJECTIVE;

To be a part of the team that achieves professional and personnel goals defined by position responsibilities that work dynamically towards the growth of the organization. EXPERIENCE PROFILE:-

Have 21 + years’ hands of Erection, commissioning and maintenance experience in the Electrical field for Oil & Gas, Power, and Refinery sectors. 1) Worked as an Electrical Supervisor in M/S Southern Gulf Tradg & Cont LLC. Oman, From Aug- 2018 to Apr 2019,

2) Worked as an Electrical Foreman in M/S Al-Hassan Engineering company, Abu – Dhabi,

(Project going on ZIRKU-ISLAND) from Nov 2016 to Aug 2017, 3) Worked as an Electrical Supervisor in M/S Al-Dar International OIL & GAS company, IRAQ,

(Project going on Badra oil field) from Dec 2015 to June 2016, 4) Worked as an Electrical Foreman in M/S ADYARD ABUDHABI-LLC (TOPAZ-ENGINEERING- OIL&GAS. Abu Dhabi.) From Jan 2013 to Jan 2015. Involved in Installing, erection & commissioning of Electrical Equipment’s & Instruments for upgrading the ZADCO- Central Production Plant - (UMM Al- Dakh field through L&T.(Off-Shore)

5) Worked as an Electrical Engineer in M/s Karthik Agro Industries Pvt Ltd - Bagalkot, Karnataka, From June 2009 to Jan 2013,

6) Worked as a Project Executive in M/S Kbk - Chem Engineering Pvt Ltd-Pune, India. From Aug 2007 to May 2009,

7) Worked as maintenance Executive in M/S Bal – Endura Adhesive India Pvt Ltd, Bangalore, India I From Sept 2006 to August 2007.

8)Worked as an Electrical Technician in M/S Kharafi National (AL-Bahar Jacrossi) Man Power Supply to Ministry of Electricity & Water Desalination Plant and KNPC Project – Kuwait, (On-Shore) From Oct 2001 to March 2006.

9) Worked as an Electrician in M/s AL-Babtain Industries Ltd – Riyadh (K S A), From June 1998 to April 2000.

10) Worked as an Electrical Supervisor in M/S Joja Chemicals Pvt Ltd - Dharwad, From June 1994 to June 1998

JOB PROFILE;

1) Preventive and Break down Maintenance Of PCC,MCC Panels, Star- Delta Starters,DOL Starters, & LV Switch Gears,

2) Testing of Panel boards like PCC, MCC, and Distribution panels, & testing of Voltmeters & Ammeter, 3) Knowledge of Installation method & termination of control cables, Erection &Commissioning of control Panels,cable Laying, glanding, & termination,loop checking works handled, 4) Preventive and Breakdown Maintenance of Ac Motors (230 v & 440 v) 5) Carries out planned Preventive maintenance as per Manuals/Schedules, 6) Uses Proper safe & Insulated Electrical tools for Maintenance job, 7) Maintenance Knowledge of Motor Operated Values 440 v, LV Motors – 440v & 230 v, 8) Maintenance Knowledge of L/T Transformers, GCB Breakers (SF6) & ACB Breakers, 9) Operation and Maintenance of Diesel Generator Sets (Kirloskar Cummins –125, 380 and 500KVA, 10) Uses proper warning sign boards around the work area for safety precautions, 11) Hands on exp in glanding termination of process instruments like level -Transmitters, Pressure transmitters, flow meters, flame detectors, gas detectors, RTDs sensors& Manual calling points

(Make – Honeywell & yokogawa)

12) I have experience in cable terminations, wiring, ferruling &dressing work as per the cable &core schedules, and ability to understand the control schematics and drawings, 13) Operation & Maintenance of Utility Equipment’s Like Air Compressors, AHUs, DG sets Etc 14) Testing of FLP & NFLP Motors, Ear thing Sets, Control Panel Boards Etc., 15) In Valve the Erection activity of 1.4 MW Turbine Set (Maxwatt) and Alternator (Stem-ford) Cabling work glanding, Termination and Lugging, Grimping works Handled,(cable size - 500sqmm x 3.5c Aluminum armored)

16) Coordination and Supervision Works and Ensure timely Completion of the Project, 17) Lead the team of Electricians. Helpers, and Unskilled Labors and sub-contractor teams for completion of the Project, It is confirmed that the above mentioned information is true to the best of my knowledge and behalf,

18) Responded to contractor RFI & review the single line diagram & details & review the installation method statement for projects & shop drawing as built drawing 19) Ensure safe working at all the times and zero accidents are maintained for all project staff, 20) Supervise & inspected all electrical activities and inspection of installation cable trays, ladder, GI conduit and inspection of all the cables/wires pulling, laying and dressing, 21) Supervise & inspection of fixed normal lights, emergency lights, exit lights, 22) Supervise & inspection of panels, DBs, including terminations, and supervise all the methods of installation of Transformers, motors, switchgears, etc, 23) Prepares comments for inspection request to make hand over the projects, and prepares necessary records/reports of all inspection and non-compliance records (NCR) 24) Compiling weekly quality reports for site works & monitor the progress of work against the approval plan/inspect of reports of any damage parts of equipment’s EDUCATIONAL QUALIFICATION; Diploma in Electrical Engineering-1993 PERSONNEL PRFILE;-

Father Name : Pundalikappa,

Date of Birth : 20th July 1969,

Marital Status : Married,

Nationality : Indian,

Languages known : Kannada, English, Hindi,

PASS PORT DETAILS:-

Pass Port Number : K 8709459,

Place of Issue : Bangalore,

Date of Issue : 07/09/2012,

Date of Expiry : 06/09/2022,

Skype id : halaswamy.kadakola1

Thanking You,

Yours Faith Fully,

(Halaswamy)



Contact this candidate