Career Portfolio provided by Nexxt
MICHAEL KULCHISKY
Austin, TX 78736
Job Function: Management & Business, Construction & Extraction, Sales & Sales Management
Highest Education: Some College
Portfolio: https://www.nexxt.com/p/0BB8F5B4-10B9-4154-AB7B-339B5DFB2B07 Work Experience
DRILLING CONSULTANT
Sandridge Energy, Oklahoma City, OK
Jan '12 - Jan '14 (2 Years, 1 Month)
DRILLING CONSULTANT, Sandridge Energy Oklahoma City, OK & Anthony, KS 2012 2014 Responsibilities: Supervision for drilling gas horizontal wells into the Mississippi Long reach double lateral 90 degree wells. Running and reaming liners to 12,000 ft. and cementing. Running liners and placing inflatable packers. DRILLING CONSULTANT, Crosstimbers and XTO Energy Inc. (Presently, a subsidiary of Exxon-Mobil). Tyler, Texas 2001 2012 Responsibilities: Supervision for drilling gas horizontal wells into the Cotton Valley Limestone. Long reach double lateral 90 degree and 60 degree wells. Running and reaming liners to 21,000 ft. and cementing. Running liners and placing swell packers.
TECHNICAL DRILLING MANAGER
OFFSHORE GEO
Feb '00 - Dec '00 (10 Months)
OFFSHORE GEO-TECHNICAL DRILLING MANAGER, Sage International, Bath, England February 2000 December 2000 Responsibilities: All aspects of soil mechanics, drilling, testing and analyzing, for offshore structures. OFFSHORE DRILLING MANAGER
TransTexas Gas Corporation, Laredo, TX
Jan '98 - Dec '99 (1 Year, 11 Months)
OFFSHORE DRILLING MANAGER, TransTexas Gas Corporation Laredo, Texas 1998 1999 Responsibilities: Reviewed drilling procedures for 21 land rigs in Zapata County. Converted two Great Lake barges for swamp barge drilling rigs in New Iberia shipyards.
DRILLING SUPERINTENDENT
Kogalym, Russia
Jan '97 - Dec '97 (11 Months)
DRILLING SUPERINTENDENT, Palmen Holdings, Kogalym, Russia January 1997 December 1997 Responsibilities: Development drilling supervision. Task force coordination for Material Management Info. System. Supervised multi-well location drilling of deviated production wells. Reviewed/recommended enhancement of drilling and zone isolation procedures with casing design. Reviewed logs of potential water injection wells, making recommendations for upgrading of cement rheology and methods of placement.
OPERATIONS COORDINATOR
Nescor Energy
Jul '94 - Dec '96 (2 Years, 6 Months)
OPERATIONS COORDINATOR, Nescor Energy USA; CEO for Nescor Energy Ulaan Bataar, Mongolia July 1994 1996. Responsibilities: Sole operator of joint venture. Manage and coordinate operations in Gobi Desert. Provide technical assistance to the Mongolian Oil company. Liaison with the Mongolian Ministries on contractual and tax obligation and progress results. Trained indigenous personnel. Initiated planned management systems (MBO) MICHAEL KULCHISKY
MANAGING DIRECTOR
Oceaneering Intl. Inc
Jan '91 - Jun '94 (3 Years, 5 Months)
MANAGING DIRECTOR, Oceaneering Intl. Inc., Saudi Arabia, United Arab Emirates, January 1991 June 1994 Responsibilities: Set up joint venture in Saudi Arabia and Khafji. Production systems management for underwater services. Facilities inspection, maintenance and repair. CONSULTANT
Capital Maritime
Jan '90 - Dec '90 (11 Months)
CONSULTANT, Capital Maritime Brazil and U.S.A., Jan 1990 December 1990 Responsibilities: Prepared robray 300 jack-up rig for ocean tow from Brazil to U.S.A. Upgraded rig to UK-DEN specifications. Project Manager in Galveston and Sabine Pass.
CONSULTANT
Modec Americas, Houston, TX
Nov '89 - Nov '89 (0 Months)
CONSULTANT, Modec Americas Houston, Texas November, 1989 Responsibilities: Feasibility study for year round drilling operations in the Sakahlin Island, Russia. ASSISTANT DRILLING MANAGER
Manilla, Philippines
Jan '88 - Jan '89 (1 Year, 1 Month)
ASSISTANT DRILLING MANAGER, Alcorn International Manilla, Philippines, 1988 1989 Responsibilities: Development drilling operation. Work-over programs. Squeezed 7 liners for water shut off. Production strings with TCP(tubing conveyed perforations) Reactivated and reclassed production jack-up drilling rig. Revised production testing procedures. PROJECT MANAGER/SUPERINTENDENT
Perth, Australia
Jan '86 - Jan '88 (2 Years)
PROJECT MANAGER/SUPERINTENDENT, McDermott International Inc. Perth, Australia, 1986 1988 Responsibilities: Coring of 36 holes for epo sand injection. Belled and concreted 16 inserts and bells to 4.65 meters diameter. Designed and modified large diameter mills and fishing tools. Programmed critical path operations. AREA MANAGER
Oceanic International, Singapore Singapore
Jan '80 - Jan '86 (6 Years, 1 Month)
AREA MANAGER, Oceanic International Singapore and Abu Dhabi, U.A. E., 1980 1986 Responsibilities: Multi jack-up rigs operations. Project management of new rig construction. Drilling deep khuff formation (19,900 20,336 feet). Safety, evacuation and contingency drills. Systems approach to management. Preventative maintenance, materials management information systems and financial reporting systems. SUPERINTENDENT
McDermott, Brussels Belgium
Jan '75 - Jan '80 (5 Years)
SUPERINTENDENT, Oceanic Contractors Inc., (McDermott) Brussels, Belgium 1975 1980 Responsibilities: Foundation drilling and belling operations in the North Sea. Drilled large diameter shafts and installed insert piles. Belled multi- diameter bells and ran rebar inserts. Operations of two soil boring drill ships. Supervision of shipyard conversions and upgrades.
MICHAEL KULCHISKY
DRILLING SUPERVISOR
Arabian American Oil Company
Jan '72 - Jan '75 (3 Years)
DRILLING SUPERVISOR, Arabian American Oil Company Saudi Arabia, 1972 1975 Responsibilities: Exploration drilling empty quarter, oil and water-well drilling. Development drilling utilizing sub-contractors. Drilling of deep test well (19,500 feet). Drilled with total losses, using mud cap method. Offshore drilling drilling programs on multi-well platforms and self- elevating mobile platforms.
Education
'71
University Of Texas
Mar '71 - Aug '71
Skills
Operations
(Expert)
Maintenance
(Advanced) 9 to 10 Year
Financial Reporting
(Advanced) 5 to 6 Years
Materials Management
(Advanced) 5 to 6 Years
Inspection
(Intermediate) 3 to 4 Years
Project Manager
(Intermediate) 2 to 3 Years
Exploration
(Intermediate) 2 to 3 Years
Liaison
(Intermediate) 2 to 3 Years
Testing
(Novice) 1 to 2 Years
Petroleum
(Novice)
Petroleum Engineering
(Novice)