Resume

Sign in

7 yrs exp in cable company as production, Quality & Marketing Manager

Location:
Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur, 51200, Malaysia
Posted:
January 15, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

M.DINESH 903-***-****, 872-***-****

adba5t@r.postjobfree.com

Objective :

To secure a challenging position where I can effectively contribute my skills as professional and gain more knowledge.

Personal details :

DOB : 11.05.1989

Sex : Male

Nationality : Indian

Languages known : Tamil, Kannada, Hindi, English

Marital Status : Married

Present address : M.DINESH, S/o R.MANMOHAN

No.2/18, Kumaran Nagar, Ganeshapuram, S.S. Kulam Post

. Coimbatore -641107

PASSPORT : H8604267

Academic profile:

Period

Qualification

Institution

Place

University

Aggregate

2005-2006

SSLC

Kendriya Vidyalaya

Mysore

CBSE

71.8 %

2006-2009

DIPLOMA

(Electrical & Electronic)

GOVT. C.P.C Polytechnic

Mysore

BOARD OF TECHNICAL

EDUCATION

66 %

2011 – 2014

ENGINEERNG

(ELECTRICAL & EELECTRONIC)

PES College of

Engineering

Mandya

Autonomous institute ( Under VTU)

75%

Undertaken Programs :

1.DIPLOMA :

Undergone a Topic seminar Report on “HOVER CRAFT .

Undergone a Project on “DIMOND SECURITY”.

2.ENGINEERING :

Undergone a Topic seminar Report on “POWER GENERATION FROM RAILWAY TRACK”.

Undergone a Project on “HYBRID OF PHOTO-VOLTAIC AND FUEL CELL FOR A STANDALONE SYSTEM”.

Achievements in college :

Was selected in College Campus interview held by L&T in Diploma in 2009, offer letter was missed by the college authority, have the written proof of above mention, given by placement officer and Principal .

Work Experience 1: 25th Nov 2009 to 30th May 2011

Organization :KEC INTERNATIONAL LIMITED (RPG CABLES).

Designation : SUPERVISOR (QUALITY ASSURANCE).

JOB RESPONSIBILITIES:

Reporting to Assistance Manager Day-to-Day work.

Take responsibilities for Quality Assurance of Running Products.

Quality checking in 10pair size cable to 2400pair size cable in PIJF.

Quality checking in 2corex1mm cable to 1 core x 400mm cable in power cable.

Given complete target as well as customer’s requirements with good quality.

Preparing final Test report for the customer.

Work Experience 2: 1st SEP 2014 To 31st March 2015

Organization :PARAS WIRES PRIVATE LIMITED (Unit -1)

Designation :ASSISTANT PRODUCTION ENGINEER

JOB RESPONSIBILITIES:

Take responsibilities for Running product .

Coordinating the cell with proper planning .

Daily load distributions follow up daily production .

Work Experience 2.1 : 1st APRIL 2015 To 31st AUG 2015

Organization :PARAS WIRES PRIVATE LIMITED (Unit -1)

Designation :PRODUCTION ENGINEER

JOB RESPONSIBILITIES:

Reporting to manager of day today work .

To ensure proper utilization of man, machine and material.

Work Experience 2.2 : 1st SEP 2015 To 31st MAY 2016

Organization :PARAS WIRES PRIVATE LIMITED (Unit -3)

Designation :PLANT INCHARGE

JOB RESPONSIBILITIES:

Complete responsible of Copper section,Bunching section,Braiding & Extruder Section.

Monitor the job start and progress also to take appropriate steps for subsequent activities.

Checking and verifying the previous days production and send the reports to the management.

Working Knowledge of 30mm,35mm,45mm, 55mm,65mm Extruders m/c.

Working Knowledge in PVC,PP, LDPE,HDPE,NYLON,TPU,TPE, FEP,PTFE Extrusion m/c with highly sophisticated controlling system.

Interaction with the customers for monitoring of the job and get the proper feedback about the job processing.

Check, verify the availability and Follow up of raw materials requirement from unit 1 .

Scheduling of plant maintenance and arrangement of spares and consumables.

Checks for the plant checklist and observation records regularly .

Maintaining the records related to production, maintenance, raw materials and quality standard.

Dispatch of daily produced material with packing slip, Delivery challan & Form 515 to unit 1.

Daily checking and verifying the attendance sheet and submitting the same to the Unit 1 .

Achievements: (1st SEP 2014 To 31st MAY 2016)

Got 3 Times Increment in 8 months .

Reduced Scrap from 12.5% to 4.4% in (Unit 3) .

Implementation :

Adopted various Innovative ideas to reduce the power cost of the plant (unit 3 ).

Reuse of polymer for color changing of wires . (unit 3 ).

Designed special Heater for cleaning Die and Nozzle,with out using gas . (unit 3 ).

Designed automatic chalk power spraying machine by simple technique . (unit 3 ).

Purging of pvc is used for making dummy, which are used in Harness packing . (Unit-3).

Work Experience 3 : 6th JUNE 2016 To 31st MAY 2017

Organization :ALOKA FLEX

Designation :PLANT INCHARGE

JOB RESPONSIBILITIES:

1. STORES :

Follow up of copper as well as pvc required for the successive days.

Maintaining of updated stocks in both Hard copy as well as in Excel .

2. PRODUCTION :

Complete responsible of Copper section,Bunching section,Braiding & Extruder Section.

Checking and verifying the previous days production and send the reports to the management.

Verifying the records related to production.

3. MAINTENANCE:

Scheduling of plant maintenance and arrangement of spares and consumables.

Checks for the plant checklist and observation records regularly .

4. QUALITY:

Coordinating with the Quality team for the check up of In process, Final testing of both Electrical and Mechanical Parameter .

Preparing Test Report .

5. BUSSINESS DEVELOPMENT:

Interaction with the customers for monitoring of the job and get the proper feedback about the job processing.

Preparing the Quotation of the cable and negotiating with the customer for the best price in the market .

Meeting the customer, explaining the company profile and its growth and getting the order for the company .( Aug 2016 to May 2017, Met 18 customers and got 5 customers order ).

Achievements:

Increased the sales of the company from 55 lakhs to 64 lakhs within 4 months of the joining .

Work Experience 4 : 12th JUNE 2017 To 12th JUNE 2019

Organization :ATHIVINAYAKAR WIRES (P) LTD

Designation : PRODUCTION & QUALITY MANAGER

1.PRODUCTION & PLANNING :

On daily basis updating the day today activity of the Extruder cell to MD .

Reporting over all Production, scrap, raw material used, new & pending order for the Month to MD .

Complete responsible of Extruder cell of single core wire and flat cables .

Coordinating with CR Cell and make Production planning as per priority of the customers .

Verifying the Log Sheets of production as per PPS and Maintaining the data’s as per ISO.

Maintained the Scrap % ( Maximum 3%) as per PDCA cycle approved by the management .

2.QUALITY:

Cross verifying and ensure the Quality of cable as per IS:694, which was checked by Quality Engineer.

Approving the Test Report of the cable for customers Prepared by Quality engineer.

Conducting the Customer Inspection.

3.STORES :

Follow up of requirement of copper From Bunching Cell .

Verifying the Stock register with Physical Stock of PVC Once in a week by sudden inspection .

4.ISO INTERNAL AUDITOR :

Got ISO 9001:2015 Internal Auditor certification from ENN Consultancy, Coimbatore.

Conducting Internal audit schedule for company once in 3 months and getting all the work done from the respective Cells, to avoid the pending work in last moment for external ISO Audit .

5. BUSSINESS DEVELOPMENT:

Taking appointment from customers and getting orders and follow up on regular basis to avoid any reduction in the Order quantiy .

Prepared Formulated Break up Quotations in excel sheet, which makes the Quote very simple and time saving and makes the customer understand very easily.

Got 3 orders for Flat cables in Coimbatore & for 1 copper Order from kerala till date .

IMPLEMENTATION:

Prepared the log sheets as per ISO.

Prepared Calibration History card of equipment,which avoid the over due date.

Trained 1 Bunching Operator & 2 Helper successfully to operate Extruder 65 mm Machine Individually with in 2 & 7 months respectively, as per the commitment given to the management .

Increased the Production quantity of flat cable from 40 Mtrs to 44 Mtrs per minutes by changing the Drive Frequency of Catterpillar and their by Obtaining the Catterpillar RPM to 1800 from 1500 RPM .

Modified Minor changes in machine and its associated parts to Increase the Production Quantity without affecting the Quality of the cable.

ACHIEVEMENTS:

oHave run the Extruder Machine ( 90mm +50mm ) & (65 mm + 45 mm ) individually with the 1 Helper for 35 Days & 42 Days in the absence of Operator in the 2018 & 2019, without any Quality issue .

oTill date received 2 complaints from the customers .

oIn-house Wooden Bobbin Manufacturing from second hand & Scrap Bobbins, thus reduced the bobbin cost .

Personal Skills :

Willing to learn new things.

Comprehensive problem solving abilities.

Hobby_:

Mantling and dismantling small electrical equipments, studying and observing Various parts.

Designed various Electronic Gadgets like water level indicator, Focusing lamp, led circuits in my home by seeing Electronic books .

Discovered that an unusable phone battery can give the power to 4 LED for minimum 3-4 hours if it is charged again.

Family Background_:

Father’s Name : R.MANMOHAN (ELECTRICIAN (MCM), Military Engineering Service, Bangalore).

Mother Name : B.RAJESHWARI (House Wife).

Wife Name : P.ANUBALA ( Associate Financial service Manager in ICICI PRUDENTIAL ) .

Declaration :

I M.DINESH hereby declare that all details given above are accurate and true to the best of my knowledge.

Thanking you,

Yours sincerely

DATE :

(M.DINESH)



Contact this candidate