Post Job Free
Sign in

Construction Engineer

Location:
Vasant Nagar, Karnataka, India
Posted:
March 13, 2020

Contact this candidate

Resume:

CURRICULUM- VITAE

Mrityunjoy Majumdar

Mobile No:-+918*********, +916********* Email:-*.**********@*****.***

Objective

To secure a position with a well-established organization with a stable environment

that will lead to a lasting relationship in the field of Construction. And to obtain a

position that will enable the use of my strong management and technical skills and

the ability to work with people.Assure of my sincerity, hard work &punctuality

Personal Profile

1. Educational Qualification :

Sl/ Examination Year of Name of University / Main Division

No. Passed passing College Board Subje

cts

A HSC 1985 Government Board of Higher Scienc Passed

High School for Secondary e (37.5% )

Boys Education,West

Bengal

B Diploma 1991 Gnana Chandra State Council Civil 1st Clas ( 71

Ghosh College, Board of Engg. %)

Kolkaya Engineering and

Technical

Education,West

Bengal

Computer Knowledge

2. : M.S. Word, M.S. Excel,

AutoCAD, Internet, etc.

3. SUMURY

. Over 27 years and 11 monthsof Experience in Various Civil Engineering Projects.

. Good Experience in Execution, Analysing, Site Management, Forecasting, Cash flow

monitoring, for following multidisciplinary work.

. Construction of Both underground,Elevated Metro,Cross passage, Multi Level Car

parking, Water treatment Plant water supply, High Rise building and Roads in hill area.

. Ability to Handle the Projects from commencement to completion witheffectively

prioritizes and execution work in high pressure environment.

. Ability good coordination with team and encourage to all team member to achieve the

goal/mile stone.

. Micro planning and three weeks rolling programme.

. All type of Utility Diversion and traffic diversion plan.

. Arrange of Sub contractor and analysis of contractor rate.

. Monitor and ensured that all construction work execute as per specification with

maintain Quality.

. Checking of BBS and Reconciliation Steel.

4 . Experience in chronological order:

Sl Organization Period

No From To

M.P Agarwal Group, Sikkim Mau,2018 Till Date

A

Details of working Experience

Working as an Execution Coordinator For following Projects

1. Construction Of Resional Museum for Natural History of Sikkim Under CPWD.

Project Cost 44 crore

2. Constriction Of Agriculture College At Sikkim Under CAU Project Cost 20

crore

3. Construction of Army Accommodation Under MES at Gangtok. Project Cost

23 crore

Responsibilities Involved In

Superstructure consists RCC Frame Structure

1. Execution Monitoring

2. Meeting with Client for Site Progress

3. Meeting with site Staff

4. Monitoring of Reconciliation for steel and Bulk material

5. Labour rate prepare

6. Extra Item marked to client and market rate analysis

7. Client Bill Prepare

8. Labour bill checking.

9. Monthly Target Prepare for Site Staff.

10. Site material Indent Checking

11. Quality Assurance maintain.

Sl Organization Period

No From To

B. Nov.2017 December 2017

J Kumar Infrastructures Limited

Details of working Experience

Working as an Construction Manager (civil) for Project: Design and

Construction of Underground Stations and Tunnels At Mumbai Package 5

( UG-1) At Phase-1

Agency : Mumbai Metro Rail Corporation

Tunneling Method: SLURRY T.B.M

Station Construction: Cut and Cover. Top Down Method

Responsibilities involved in:

1.Construction of Vidyanagari Staion

Completed All Utility Diversion

Secant Pile For Station Excavation Work

Traffic Diversion Plan and Implement

Sl Organization Period

No From To

Continental Engineering Corporation ( Nov.2012 October 2017

C

A MNC Company

Details of working Experience

Working as an Construction Manager (civil) for

1.Project: Design and Construction of Elevated Metro Project with Station NC-

03 10Km At Greatr Noida from 15.06.15 to 06.10.2017

Agency: Delhi Metro Rail Corporation

U girder and I girder Launching Method

Project Cost:- 472 Crore

Responsibilities involved in:

Construction of Elevated Corridoor.

Completed Elevated for 3 km Strech.

Overall management of site activities, like construction of Pile,Pile Cap,Pier

,Pier Cap, Portal Pier

3weeks Rolling Program

Utility Diversion Work.

Completed Pile and Pier To cross Hinden River Including completed of Deck

slab.

Completed Casting yard Establishment.

Traffic Diversion

BBS monitoring

Steel and Bulk material Reconciliation

Weekly progress meeting with Team for achieve of mile stone

Maintain of RFI and Quality of work

Drawing monitoring

2.Project: Design and Construction of Under Ground Metro Project with 2 Staion

atStation2.36 KM from Chan pole to Badi ChoperUG-1 Phase 1 At Jaipur from

01.04.2014 to 14.06.2015

Agency: Delhi Metro Rail Corporation

Using TBM and Top Down Method

Project Cost:- 436 Crore

Responsibilities involved in:

Construction of Launching Shaft And One Station Partly

Completed Launching Shaft By D- wall method ( Top Down )

Completed Dwall and Top slab for Choti Chopper Station.

Completed 6 nos Plug Column at Station

Completed all Utility Diversion Work for Electrical,Water supply and Swear line

with Coordinate of Owing Agency

Traffic Diversion Plan and Implementation with Co ordinate of Local

Administration.

Coordinate with Consultant for Drawing

BBS Checking

3weeks Rolling Program

Construction sequence

Crack meter monitoring work

3. Project: Design and Construction of Underground Stations and Tunnels

( UG-2) At Phase-1 from 2.11.2012 to 31.03.2013

Agencys Bangalore Metro Rail Way Corporation

Tunnelling Method: SLURRY T.B.M

Ramp and Pocket Track: Cut and Cover.

Cross Passage: Box Pushing Method

Project Cost: 950.00 Cores

Project Profile:

Bangalore Metro Rail Project underground section2 comprises 4 nos underground stations

and Tunnel with Slurry Type Tunnel Boring Machine for 4.86 KM from Chinnaswamy

Cricket Stadium to City Railway Station via Majestic. Methodology adopted for UG2 section

is Cut & Cover & TBM. The project cost is Rs.995 crores

Responsibilities involved in:

Execution of East Ramp,2 nos Retrieval Shaft, Cut and Cover at East Ramp, One

Launching Shaft, pocket track, tunnelling by slurry TBM from POCKET TRACK TO

CITY RAILWAY STATION below city railway station (SWR) yard.

Monitoring and Construction works as per relevant drawings.

Construction involves Base Slab, Retaining Walls, Soldier Piles, Secant Piles, Waler

beam, Struts, Ground Anchors, King post, Decking for traffic.

Coordinate with l TBM operational Team for activities like Grouting, Slurry, and Lifting,

Mining & Disposal.

Operation of supporting work toprevent settlement of Railway track

Cutoff wall grouting for prevent Soil settlement.

Crack meter monitoring.

Maintain Barricade board and Road cleaning work

Maintaining quality control on day to day construction activities at site.

BBS checking

Steel and Bulk material reconciliation

3weeks rolling Program and Construction Sequence prepare

Manpower Reconciliation

Construction of Cross Passage.

Constructions of 1 cross passages between Majestic and central college station by

using box pushing methodology.

Stabilization of ground condition to facilitate construction of cross passage below the

carriage way using chemical grouts.

Monitoring of settlement & deflection of the ground in coordination with Contractor

team.

Ensuring quality of 5 Ms (Men, Materials, Money, Machinery & Methodology) and

construction activities in relevance to codes & contractual terms.

Sl Organization Period

No From To

D Pave Infra Structure PVT LTD Siliguri Feb2012 October.2012

Project details :

Construction of Central Agriculture Colege.

The project cost is 32 crore crores.

Work as Project Manager

Details of working Experience

Superstructure consists RCC Frame Structure

Monitoring and Construction Building

Quality Control and assurances Material testing like Coarse and fine aggregates, Steel,

Admixtures etc, and Calibration of Batching Plant as per Approved QAP and NDT test

for all Construction work

Billing Work.

Material Reconciliation work

Sl Organization Period

No From To

Aluwalia Contracts India Limited August 2011 January 2012

E

Project details :

Construction of Utkal Heights G+26th multi stories building

Work as Project Manager

Details of working Experience

Superstructure consists RCC Frame Structure

Monitoring and Construction Building

Quality Control and assurances Frequent Material testing like Coarse and fine

aggregates, Steel, Admixtures etc, and Calibration of Batching Plant as per Approved

QAP and NDT test for all Construction work

Billing Work.

Material Reconciliation

Sl Organization Period

No From To

F Pave Infrastructures PVT Limited. March 2010 July 2011

Siliguri

Project details :

Construction of Multi Level Car Parking and Allied Facilities

Work as Project Manager

Details of working Experience

Superstructure consists RCC Frame Structure

Monitoring and Construction Building

Quality Control and assurances Frequent Material testing like Coarse and fine

aggregates, Steel, Admixtures etc, and Calibration of Batching Plant as per Approved

QAP and NDT test for all Construction work

Billing Work.

Material Reconciliation.

Sl Organization Period

No From To

Simplex Projects Limited,Kolkata December 2005 Feb 2010

G

Project details :

Construction of Multi Level Car Parking and Allied Facilities At Namchi Sikkim

1.

Project Cost 28 core

2.

Construction of Slum Rehabilitation Centre and allied facilities at Rabomgla Sikkim

3.

Work as Project Engineer

Details of working Experience

Superstructure consists RCC Frame Structure

Monitoring and Construction Building

Quality Control and assurances Frequent Material testing like Coarse and fine

aggregates, Steel, Admixtures etc, and Calibration of Batching Plant as per Approved

QAP and NDT test for all Construction work

Billing Work.

Material Reconciliation.

Sl Organization Period

No From To

Gaseb Construction,Thimpu Bhutan NOV.1998 May 2005

H

Project details :

Construction of 15 Km new Road for power house and 20 beded Hospital

1

at tala.

Construction of Water treatment plant under world bank and Junior High

2

School at Lunchi

3

Work as Assistant Engineer

Details of working Experience

Supervision and Construction Work

Material Reconciliation.

Billing Work

Organization Period

No From To

D.D Consultancy August 1996 Sep. 1998

I

Project details :

Supervision of High rise building

1.

Work as Jnior Engineer

Details of working Experience

Supervision of Construction Work

Organization Period

No From To

I Progresive Consultancy Jan 1992 July1996.

Project details :

Supervision of High rise building

2.

Work as Jnior Engineer

Details of working Experience:

Supervision of Construction Work

Strength:

Target of Goal and achieve of Goal. Good Coordination with Team.

PERSONAL DETAILS:

Name : Mrityunjoy Majumdar

Fathers Name : Late N.C.Majumdar

Date of Birth : 23.04.67

Nationality : Indian

Sex : Male

Marital Status : Married

Passport No : M2194865

Language Known : English, Bengali & Hindi

Permanent Address: : AkshayaDham, SealPara, Post& Dist.

Jalpaiguri, West Bengal735101.

Communication Adores : Skyline City Apartment, Door No 404,

Chandra laout, Bangalore 40

Hobby : Daily Life maintain in Diary.

Declaration:

I do hereby solemnly declare that all the statements made above are true and correct to

the best of my knowledge and belief.

Mrityunjay

Majumdar



Contact this candidate