CURRICULUM- VITAE
Mrityunjoy Majumdar
Mobile No:-+918*********, +916********* Email:-*.**********@*****.***
Objective
To secure a position with a well-established organization with a stable environment
that will lead to a lasting relationship in the field of Construction. And to obtain a
position that will enable the use of my strong management and technical skills and
the ability to work with people.Assure of my sincerity, hard work &punctuality
Personal Profile
1. Educational Qualification :
Sl/ Examination Year of Name of University / Main Division
No. Passed passing College Board Subje
cts
A HSC 1985 Government Board of Higher Scienc Passed
High School for Secondary e (37.5% )
Boys Education,West
Bengal
B Diploma 1991 Gnana Chandra State Council Civil 1st Clas ( 71
Ghosh College, Board of Engg. %)
Kolkaya Engineering and
Technical
Education,West
Bengal
Computer Knowledge
2. : M.S. Word, M.S. Excel,
AutoCAD, Internet, etc.
3. SUMURY
. Over 27 years and 11 monthsof Experience in Various Civil Engineering Projects.
. Good Experience in Execution, Analysing, Site Management, Forecasting, Cash flow
monitoring, for following multidisciplinary work.
. Construction of Both underground,Elevated Metro,Cross passage, Multi Level Car
parking, Water treatment Plant water supply, High Rise building and Roads in hill area.
. Ability to Handle the Projects from commencement to completion witheffectively
prioritizes and execution work in high pressure environment.
. Ability good coordination with team and encourage to all team member to achieve the
goal/mile stone.
. Micro planning and three weeks rolling programme.
. All type of Utility Diversion and traffic diversion plan.
. Arrange of Sub contractor and analysis of contractor rate.
. Monitor and ensured that all construction work execute as per specification with
maintain Quality.
. Checking of BBS and Reconciliation Steel.
4 . Experience in chronological order:
Sl Organization Period
No From To
M.P Agarwal Group, Sikkim Mau,2018 Till Date
A
Details of working Experience
Working as an Execution Coordinator For following Projects
1. Construction Of Resional Museum for Natural History of Sikkim Under CPWD.
Project Cost 44 crore
2. Constriction Of Agriculture College At Sikkim Under CAU Project Cost 20
crore
3. Construction of Army Accommodation Under MES at Gangtok. Project Cost
23 crore
Responsibilities Involved In
Superstructure consists RCC Frame Structure
1. Execution Monitoring
2. Meeting with Client for Site Progress
3. Meeting with site Staff
4. Monitoring of Reconciliation for steel and Bulk material
5. Labour rate prepare
6. Extra Item marked to client and market rate analysis
7. Client Bill Prepare
8. Labour bill checking.
9. Monthly Target Prepare for Site Staff.
10. Site material Indent Checking
11. Quality Assurance maintain.
Sl Organization Period
No From To
B. Nov.2017 December 2017
J Kumar Infrastructures Limited
Details of working Experience
Working as an Construction Manager (civil) for Project: Design and
Construction of Underground Stations and Tunnels At Mumbai Package 5
( UG-1) At Phase-1
Agency : Mumbai Metro Rail Corporation
Tunneling Method: SLURRY T.B.M
Station Construction: Cut and Cover. Top Down Method
Responsibilities involved in:
1.Construction of Vidyanagari Staion
Completed All Utility Diversion
Secant Pile For Station Excavation Work
Traffic Diversion Plan and Implement
Sl Organization Period
No From To
Continental Engineering Corporation ( Nov.2012 October 2017
C
A MNC Company
Details of working Experience
Working as an Construction Manager (civil) for
1.Project: Design and Construction of Elevated Metro Project with Station NC-
03 10Km At Greatr Noida from 15.06.15 to 06.10.2017
Agency: Delhi Metro Rail Corporation
U girder and I girder Launching Method
Project Cost:- 472 Crore
Responsibilities involved in:
Construction of Elevated Corridoor.
Completed Elevated for 3 km Strech.
Overall management of site activities, like construction of Pile,Pile Cap,Pier
,Pier Cap, Portal Pier
3weeks Rolling Program
Utility Diversion Work.
Completed Pile and Pier To cross Hinden River Including completed of Deck
slab.
Completed Casting yard Establishment.
Traffic Diversion
BBS monitoring
Steel and Bulk material Reconciliation
Weekly progress meeting with Team for achieve of mile stone
Maintain of RFI and Quality of work
Drawing monitoring
2.Project: Design and Construction of Under Ground Metro Project with 2 Staion
atStation2.36 KM from Chan pole to Badi ChoperUG-1 Phase 1 At Jaipur from
01.04.2014 to 14.06.2015
Agency: Delhi Metro Rail Corporation
Using TBM and Top Down Method
Project Cost:- 436 Crore
Responsibilities involved in:
Construction of Launching Shaft And One Station Partly
Completed Launching Shaft By D- wall method ( Top Down )
Completed Dwall and Top slab for Choti Chopper Station.
Completed 6 nos Plug Column at Station
Completed all Utility Diversion Work for Electrical,Water supply and Swear line
with Coordinate of Owing Agency
Traffic Diversion Plan and Implementation with Co ordinate of Local
Administration.
Coordinate with Consultant for Drawing
BBS Checking
3weeks Rolling Program
Construction sequence
Crack meter monitoring work
3. Project: Design and Construction of Underground Stations and Tunnels
( UG-2) At Phase-1 from 2.11.2012 to 31.03.2013
Agencys Bangalore Metro Rail Way Corporation
Tunnelling Method: SLURRY T.B.M
Ramp and Pocket Track: Cut and Cover.
Cross Passage: Box Pushing Method
Project Cost: 950.00 Cores
Project Profile:
Bangalore Metro Rail Project underground section2 comprises 4 nos underground stations
and Tunnel with Slurry Type Tunnel Boring Machine for 4.86 KM from Chinnaswamy
Cricket Stadium to City Railway Station via Majestic. Methodology adopted for UG2 section
is Cut & Cover & TBM. The project cost is Rs.995 crores
Responsibilities involved in:
Execution of East Ramp,2 nos Retrieval Shaft, Cut and Cover at East Ramp, One
Launching Shaft, pocket track, tunnelling by slurry TBM from POCKET TRACK TO
CITY RAILWAY STATION below city railway station (SWR) yard.
Monitoring and Construction works as per relevant drawings.
Construction involves Base Slab, Retaining Walls, Soldier Piles, Secant Piles, Waler
beam, Struts, Ground Anchors, King post, Decking for traffic.
Coordinate with l TBM operational Team for activities like Grouting, Slurry, and Lifting,
Mining & Disposal.
Operation of supporting work toprevent settlement of Railway track
Cutoff wall grouting for prevent Soil settlement.
Crack meter monitoring.
Maintain Barricade board and Road cleaning work
Maintaining quality control on day to day construction activities at site.
BBS checking
Steel and Bulk material reconciliation
3weeks rolling Program and Construction Sequence prepare
Manpower Reconciliation
Construction of Cross Passage.
Constructions of 1 cross passages between Majestic and central college station by
using box pushing methodology.
Stabilization of ground condition to facilitate construction of cross passage below the
carriage way using chemical grouts.
Monitoring of settlement & deflection of the ground in coordination with Contractor
team.
Ensuring quality of 5 Ms (Men, Materials, Money, Machinery & Methodology) and
construction activities in relevance to codes & contractual terms.
Sl Organization Period
No From To
D Pave Infra Structure PVT LTD Siliguri Feb2012 October.2012
Project details :
Construction of Central Agriculture Colege.
The project cost is 32 crore crores.
Work as Project Manager
Details of working Experience
Superstructure consists RCC Frame Structure
Monitoring and Construction Building
Quality Control and assurances Material testing like Coarse and fine aggregates, Steel,
Admixtures etc, and Calibration of Batching Plant as per Approved QAP and NDT test
for all Construction work
Billing Work.
Material Reconciliation work
Sl Organization Period
No From To
Aluwalia Contracts India Limited August 2011 January 2012
E
Project details :
Construction of Utkal Heights G+26th multi stories building
Work as Project Manager
Details of working Experience
Superstructure consists RCC Frame Structure
Monitoring and Construction Building
Quality Control and assurances Frequent Material testing like Coarse and fine
aggregates, Steel, Admixtures etc, and Calibration of Batching Plant as per Approved
QAP and NDT test for all Construction work
Billing Work.
Material Reconciliation
Sl Organization Period
No From To
F Pave Infrastructures PVT Limited. March 2010 July 2011
Siliguri
Project details :
Construction of Multi Level Car Parking and Allied Facilities
Work as Project Manager
Details of working Experience
Superstructure consists RCC Frame Structure
Monitoring and Construction Building
Quality Control and assurances Frequent Material testing like Coarse and fine
aggregates, Steel, Admixtures etc, and Calibration of Batching Plant as per Approved
QAP and NDT test for all Construction work
Billing Work.
Material Reconciliation.
Sl Organization Period
No From To
Simplex Projects Limited,Kolkata December 2005 Feb 2010
G
Project details :
Construction of Multi Level Car Parking and Allied Facilities At Namchi Sikkim
1.
Project Cost 28 core
2.
Construction of Slum Rehabilitation Centre and allied facilities at Rabomgla Sikkim
3.
Work as Project Engineer
Details of working Experience
Superstructure consists RCC Frame Structure
Monitoring and Construction Building
Quality Control and assurances Frequent Material testing like Coarse and fine
aggregates, Steel, Admixtures etc, and Calibration of Batching Plant as per Approved
QAP and NDT test for all Construction work
Billing Work.
Material Reconciliation.
Sl Organization Period
No From To
Gaseb Construction,Thimpu Bhutan NOV.1998 May 2005
H
Project details :
Construction of 15 Km new Road for power house and 20 beded Hospital
1
at tala.
Construction of Water treatment plant under world bank and Junior High
2
School at Lunchi
3
Work as Assistant Engineer
Details of working Experience
Supervision and Construction Work
Material Reconciliation.
Billing Work
Organization Period
No From To
D.D Consultancy August 1996 Sep. 1998
I
Project details :
Supervision of High rise building
1.
Work as Jnior Engineer
Details of working Experience
Supervision of Construction Work
Organization Period
No From To
I Progresive Consultancy Jan 1992 July1996.
Project details :
Supervision of High rise building
2.
Work as Jnior Engineer
Details of working Experience:
Supervision of Construction Work
Strength:
Target of Goal and achieve of Goal. Good Coordination with Team.
PERSONAL DETAILS:
Name : Mrityunjoy Majumdar
Fathers Name : Late N.C.Majumdar
Date of Birth : 23.04.67
Nationality : Indian
Sex : Male
Marital Status : Married
Passport No : M2194865
Language Known : English, Bengali & Hindi
Permanent Address: : AkshayaDham, SealPara, Post& Dist.
Jalpaiguri, West Bengal735101.
Communication Adores : Skyline City Apartment, Door No 404,
Chandra laout, Bangalore 40
Hobby : Daily Life maintain in Diary.
Declaration:
I do hereby solemnly declare that all the statements made above are true and correct to
the best of my knowledge and belief.
Mrityunjay
Majumdar