PROFILE SUMMARY: I am an Electrical Engineer with Bachelor Degree in Electrical Engineering from Pakistan. I have 10 YEARS’ EXPERIENCE OF ELECTRICAL POWER PROJECTS in execution, erection, installation, cabling, LV & MV system, commissioning, Operation, maintenance and closing. I am looking forward to joining an organization where I can use my acquired experience, skills, knowledge and abilities to bring more to its growth and success while developing myself more professionally in experience and skills.
SKILLS & ABILITIES:
Supervised a team of executing electromechanical installation of high voltage substations.
Strong Knowledge in high voltage transmission & distribution projects installation, erection, cable laying and earthing.
Exceptional knowledge of LV, MV and HV system installation, maintenance and commissioning.
Excellent in control and protection system trouble shooting.
Ability to trouble shoots and operate emergency switchboard.
Solid knowledge of 220V DC, 110V DC battery banks and battery chargers and supply boards.
Strong decision making and the ability to prioritize company goals and plan effectively.
A good team leader and a smart team player.
Ability to motivate team members and to specify short and long term goals.
Creativity, self- motivated and committed to job.
Enthusiasm of learning and ability of problem solving.
Strong knowledge of electrical basic circuits and organizational skills.
An active listener with the ability to focus on customer requirements.
Ability to efficiently communicate with vendors, contractors, suppliers and consultants.
PROJECTS:
SITE MANAEGER SIEMENS Pakistan Pvt. Ltd.
Project Location : DABS-010, Kabul, Afghanistan
Project Duration : December-2016 till December-2018 = 02 Years
SITE ENGINEER Net Gulf Operation & Maintenance Contractor Pvt. Ltd
Project Location : 110 kV GIS, Al-Kharje, KSA
Project Duration : Aug-2016 till Oct-2016 = 03 Months
SITE ENGINEER SNEEC, Pvt. Ltd. China (Pakistan)
Project Location : New 500/220kV Substation Lahore, Pakistan
Project Duration : Dec-2015 till Jun-2016 = 06 Months
PROJECT TECHNICAL ASSISTANT USAID-AEAI
Project Location : Peshawar, Pakistan
Project Duration : Jan-2014 till Nov-2015 = 01 Year and 11 Months
SITE ENGINEER ALSTOM GRID Pakistan Pvt. Ltd.
Project Location : 132/11kv Khadim Steel Substation, Faisalabad, Pakistan
Project Location : 132/11kv Jabban Hydroelectric Power Substation, Dargai, Pakistan.
Projects Duration : March 2011 till December 2013 = 02 Years & 09 Months
SITE ENGINEER SIEMENS Pakistan Pvt. Ltd.
Project Location : 500/220/132/11kv Ghakkar Substation, Gujranwala, Pakistan
Project Location : 500/220/132/11kv Yousafwala Substation, Sahiwal, Pakistan
Project Duration : October-2007 till December-2010 = 03 Years
JOB RESPONSIBILITIES:
Being a smart member of a dynamic team, my key everyday jobs are following.
Erection of switchyard towers beams & HV equipment’s steel supporting structure.
Earthing System installation of Substations.
Cable Laying of HV, LV and Control & Protection Systems.
Assembling & installation of different electromechanical equipment’s (Battery Banks, Battery Chargers, Public Address System Exchange, Power Line Carrier (PLC) System).
Building Works, responsible for lighting installation, firefighting system installation, AC installation etc.
Cables Termination and Installation of different panels i.e. (AC/DC Systems, Relay & Control Panel, Local Control Panels and PLC (Power Line Carrier) Panels).
Sagging and stringing of HV Over Head Bus Bars and inter-connection of switchyard equipment’s.
HV Equipment’s Installation i.e. (Circuit Breakers, Insulator’s, Current Transformer, Potential Transformers, Capacitor Coupled Voltage Transformers, Line Traps, Surge Arresters, Shunt Reactors and Power/Auto Transformers).
Public Address System and Switch Yard Lighting System).
Supervised control and protection panels termination plans.
Monitoring of civil construction works with electrical point of view in grid station.
Ensuring good health of equipment’s/components and no compromise on safety by complying with the international standards.
Resistance and joint stability test of earthing mesh.
Carried out different primary tests of Auto Transformer, Power transformer, Current and Voltage Transformers i.e. (Winding resistance, ratio, Secondary & Primary Injection, polarity, insulation, dielectric test of oil, mechanical relays & alarms testing.
A.C/D.C system testing and commissioning (Energizing).
Testing of alarms, control & synchronizing circuits.
Phase sequence test with respect to transformers and LV/HV distribution panels.
Monitoring monthly/annual cleaning and maintenance of substation.
Responsible for plant start-up and Shut down during trouble shooting or maintenance.
Rectification and finalizing different punch list points given by client/consultant.
Marking and finalizing site as built drawing i.e. (Layouts, Erection/Installation & Schematics Drawings).
Design submission, follow up and approval.
Project executing monitoring and Closing.
Giving assistance to project manager in project sites related tasks.
Arrange joint inspection of client, consultant of shipments for release the payments.
Maintain weekly and monthly progress reports.
Effective utilization of available resources to minimize project cost.
Handing & Taken over of spare parts at site.
Ensuring and planning activities to meet project timelines.
EDUCATION: B.Tech. Electrical Engineering 2013 Preston University, Islamabad, PAKISTAN.
COMPUTER SKILLS: Microsoft office, Microsoft Outlook, Microsoft Excel, Power Point, MS Project.
REFERENCE: Will Be Provided On Demand
AMJAD ALI (Electrical & Power Engineer)
Cell Phone #: +971-**-***-****(UAE)
+92-334-*******(Pak)
Current Address: Rashidiya, Dubai(UAE)
Email ID: ***********@*****.***
Visit Status: Visit Visa Expiring on May 10th, 2020.