IAN FRANCIS D. DE NAVA
Block * Lot * Dela Costa * Subd. brgy. Graceville, San Jose del Monte, Bulacan. Philippines
Mobile No: +974-****-**** / *************@*****.***
Objective: To Gain and to be Trained for Personal and Professional Growth Towards
Company Mission and Vision Through the Fullest of my Potential and Skills. And
Continue Self Study for International Code of Civil Standard ASTM American Standard Test Method and ACI for my Additional Knowledge and Purposes.
SAUDI ARAMCO APPROVE FOR QC PERSONNEL STATUS - 1
SAP No. : 18209601
COMPUTER SKILLS : MICROSOFT WORD, EXCEL and AUTOCAD 2016
PERSONAL INFORMATION
Date of birth : September 23,1987
Place of birth : Manila
Nationality : Filipino
Gender : Male
Civil Status : Married
Height : 5’6
Weight : 72 kilos
SSS No. : 33-9704424-2
Pag-ibig No. : 121*********
Passport No. : P2918083A
Phil Health : 010*********
EDUCATIONAL BACKGROUND
College : Technological University of the Philippines
Course : Bachelor of Science in Civil Engineer (BSCE)
Graduate : April 2006
EMPLOYMENT HISTORY
Position : Qa Qc Inspector (Concrete, Asphalt, Soil aggregate) and Off-Shore Marine Concrete and Material Inspector
Project : KNRP Al-Zour Package 5 (Oil and Gas, Kuwait) and Kuska (Off-Shore Main Bridge, Kuwait) and Al Bustan South Project (Main Bridge, Qatar)
Company : Hyundai Engineering & Construction Co.
Period : January 25, 2017 to Present
Duties & Responsibilities ( Qa Qc Inspector )
Responsible for Implementing of works in the site
Conducting inspection of materials to be use at the site
Site work inspection and verification of works performed
Initiates and coordinates periodic reviews of construction activities by home to ensure that the construction is being carried out in accordance with design requirement.
Conduct regular inspection on all installation and construction works, ensuring that these are done in accordance with the requirements of the contract documents.
Before concreting and other related works, inspect the line and levels together with plumb of various structural elements.
Review the construction drawings and daily inspection of site works to make sure it is in conformance with the drawings and specification
Responsible for controlling exceed manpower
Position : Qa Qc. Civil Laboratory Batching Plant ( Concrete ) and Asphalt Plant ( Asphalt ) Inspector
Project : YANBU Power Hydro Plant and RABIGH Power Hydro Plant ( Saudi Arabia )
Company : General Agencies and Contracting Company Under by SRACO Co. ARAMCO SAUDI ( Oil and Gas, Power Plant )
Period Covered : August 8 2014 to August 12 2016
Duties & Responsibilities ( Civil Laboratory Material Inspector )
ASTM standard ( Concrete and Aggregate )
C1064- ASTM for Temperature of freshly mixed hydraulic cement concrete
C172- ASTM for Sampling freshly mixed concrete
C143- ASTM for Slump of hydraulic cement concrete
C231- ASTM for Air Content of freshly mixed concrete by the pressure method
C31,C192 & C1768- ASTM practice for making and curing concrete test specimens in the field and lab.
C39 & C1231- ASTM for Compressive strength of cylindrical concrete specimens
C566 & C70- ASTM for total evaporable moisture content of fine and coarse aggregate by drying
C136 & C117- ASTM for Sieve Analysis of fine and coarse aggregate
C128 & C127- ASTM for density, relative density ( specific gravity ) and absorption of fine and coarse agg.
C470- ASTM specification for Molds for forming concrete test Cylinders Vertically
C511- ASTM specification for mixing room, moist cabinets, moist room and water storage tank
C702- ASTM practice for Reducing sample of aggregate to testing size
D1293- ASTM for PH of Water
Position : Qa Qc Laboratory Technician
Project : Upgradation of Aziziyah to Nalut Road Dual
Carriageway project
Company : Libyan Saraya General Construction Company
Period Covered : February 12 2012 to February 26 2014
Duties & Responsibilities ( Laboratory Technician )
ASTM standard ( Soil and Rock )
D1556- ASTM for density and unit weight of soil in place by Sand Cone Method
D1883- ASTM for California Bearing Ratio ( CBR ) of laboratory compacted soils
D2922- ASTM for density of soil and soil aggregate in place by nuclear method ( shallow depth )
D4253- ASTM for maximum index density and unit weight of soils using a vibrator table
D4254- ASTM for minimum index density and unit weight of soils and calculation of relative density
Duties & Responsibilities ( Laboratory Technician )
ASTM standard ( Road and Paving: Bituminous Asphalt )
D979- ASTM practice for sampling Bituminous paving mixture
D5- ASTM for Penetration of bituminous materials
D546- ASTM for Sieve Analysis of mineral Filler for bituminous paving mixtures
D2172- ASTM for quantitive extraction of bitumen from bituminous paving mixture
D1074- ASTM for compressive strength of bituminous mixtures
Duties & Responsibilities: ( Laboratory Technician )
Preparing Laboratory daily test schedule
Conducting laboratory testing of soil, aggregates &concrete
Updating control chart of soil
Monitoring &updating weather chart
Soil & concrete field testing
Control of monthly accomplishment report
Daily coordination with Project Consultant
Calibration of density of sand & cone
Performing & documenting result of test in the field & in the laboratory
Quality test of soil & aggregates
Laboratory: Sieve Analysis Standard, modified proctor test, relative density,
Laboratory CBR test, LA Abrasion test
Field: Standard Penetration test, field density test, plate load, bearing test, concrete
Temperature test, Slump test, unit weight
And air content of concrete.
Duties and Responsibilities ( QC INSPECTOR )
Bedding and Backfilling:
Prepare pre-backfill inspection record checklist.
Check bedding for oversize materials and foreign objects(mortar, roots,
Plastic, paper box, etc.)
Check for any damage on mortar and dielectric coating
Ensure that the layer marking are present
Ensure that the backfilling sequence is being followed, both sides at the same time.
Check if layer compaction conforms to the approved backfilling specification and
Procedure.
Ensure that field density test frequency is being performed..
Denso Wrapping/Taping
Ensure that wrapping materials are free from direct sunlight and foreign
Contamination as well as the primer
Check joint to be wrapped if properly cleaned and free from laitance that may
Cause poor adhesion.
During wrapping, ensure that the wrapped area is free from wrinkles and air.
Repair of rework if necessary.
Check if denso tape joint overlap conforms to the specification.
Position : JR. Site engineer
Project : One Rockwell project
(high rise building project)
Company : DATEM Incorporated, general construction company
Period covered : February 10,2009 to October 7,2010
Duties and Responsibilities (Site engineer)
Coordinate our quality control regarding approved steel fabricate for column and slab for installation area level.
Conducting and supervice the steel fixer to do his right job according to the approved plan.
Daily coordinate with safety officer to work permit to our job site.