Post Job Free

Resume

Sign in

Architect Manager

Location:
Portland, OR
Posted:
March 04, 2020

Contact this candidate

Resume:

David R. “Skip” Brown, AIA/CCS

Architect

BACKGROUND

Skip Brown is an Oregon registered NCARB certified architect with over 30 years of experience providing design, computer-aided design (CAD), project management, specifications writing and review, construction document development, coordination of contract documents, and contract administration.

PROJECT EXPERIENCE

Project Architect – Design Group

Project architect for Cabot industries and Intel projects

Project Architect/Manager – Tiland/Schmidt Architects

Project architect/manager for Sherwood Fun Center, Cash & Carry (Smart Foods) Ridgefield development, Tigard Towne Center remodel, Joann’s store remodel.

Project Architect/Manager – Soderstrom Architects

Project architect/manager for Adams School Remodel in McMinnville OR, St. Anthony of Padua Adoration Chapel renovation in Forest Grove OR, and Woodburn Bridges Academy office building renovation Woodburn OR.

Director of Architecture – Melvin Mark Properties – Portland, Oregon

Project architect in charge of 4 high rise buildings for tenant projects, and approximately 10 additional buildings under Melvin Mark Brokerage. I developed layouts, design, pricing packages and construction drawing for all TI projects from Dec 2010 to Feb 2017.

Veterans RFLP (Request For Lease Proposal) Tenant space – Vancouver Washington

Project architect for design/development of 10,000 sq. ft tenant space in an existing two story suburban office building in Vancouver WA.

Madison Condominiums – Pasadena, California

Project architect for a 6 story condominium building. Project budget: $11M.

Newport Condominiums – Las Vegas, Nevada

Project architect for a 23 story condominium building. Project budget: $45M.

One Las Vegas Condominiums – Las Vegas, Nevada

Project Construction Administration architect for owner. I provide specifications/contract review of documents on site and assisted owner with his on-going conflicts with general contractor.

Boing Plate Shop – Portland, Oregon

Project architect in development of program into a schematic design for Boing’ addition to the existing airplane manufacturing building. Provide many code research and analysis of conflict issues generated by building expansion. Project was seeking LEED certification.

Washington State Patrol Forensic Lab – Vancouver, Washington

Project architect thru design development of a new Forensic Lab/Office building. Project budget: $10M.

UC Davis Veterinarian Instructional Facility, Davis, California

Team architect for the University of California at Davis school of Veterinary Medicine expansion of two new two-story facility buildings for the students’ daily arrival, auditorium and orientation classes, and respite from heavy class/lab events of the veterinary course.

Mary Bridge Clinical Outpatient Facility, Tacoma Washington

Project architect for a 5 story Medical out-patient facility on the campus of Tacoma Hospital. Project budget: $19M.

Grace Semi-Conductor Manufacturing Corporation, Shanghai, China

Project Architect responsible for managing development of basic design documents for GSMC, a newly organized microelectronics company formed with the specific goal to construct and manufacture microelectronic chips in Shanghai, China. The project process included all challenges from new staffing on the owner’s side, to a new industrial park site: Zhang Jhang High Tech Park.

IBM Cleanroom Renovations, Fishkil, New York

Project Architect. On-site renovation of the existing IBM facilities at the Fishkil headquarters site, New York.

Taiwan Semiconductor Manufacturing Corporation, Tainan, Taiwan

Project Architect. A microelectronics foundry fabrication facility of over 89,000 square feet of Cleanroom, Central Utilities Plant (CUP), support building for the receiving and distribution of raw material, HPM and out-put product and an attached 6 story office building.

Fujitsu Microelectronics, Gresham, Oregon

Lead Architect. Addition to the existing fabrication facility campus, Central Utilities Plant (CUP) and a separate manufacturing/office building.

Kikkoman, Folsom, California

Construction Administration Architect. Responsibilities included reviewing the requirements of the UBC for occupancy and listing the necessary tasks that needed to be complete in order to obtain three separate staged certificates of occupancy from the City of Folsom.

Intel Corporation, Fab 18, Kiryat Gat, Israel

Project Architect. This new Intel fabrication facility is centrally located in Israel on the edge of a 40,000 population farming town. The campus is composed of a Pumphouse, Substation, Facilities/contractors office building, Central Utilities Building (CUB), manufacturing building with 75,000 sq. ft. clean room, Office building and two Guard buildings. In April of 1996 we moved to Israel to oversee the construction of the new facility. My role for the next 18 months was the shared role of Project Architect with Mr. Eric Stoehr. I managed the continued development of design and all related field issues -Eric monitored schedule with the local consultants responsible for producing modified construction documents per local requirements.

Intel Corporation, Chandler, Arizona

Team Architect. The additional of a new manufacturing facility, Fab, Cub and Office building on the same site as Intel’s existing Fab 12 in Chandler, Arizona, came as a “copy exactly” from the D1C facility in Hillsboro, Oregon.

Intel Corporation, Fab 12, Chandler, Arizona

Team Architect. Fab 12 manufacturing facility followed closely in design and construction of the Fab 11 facility in Rioi Rancho, New Mexico.

EMPLOYMENT HISTORY

BWDesignGroup Lake Oswego OR

Tiland/Schmidt Architects Portland OR

Soderstrom Architects Portland OR

Melvin Mark Company, Portland OR

Harris Group Engineering, Portland OR

WPH Architecture, Portland, OR

Barrantine Bates Lee Architects, Lake Oswego, OR

Yost Grube Hall Architecture, Portland, OR

SRG Partnership, Portland, OR

Giffin, Bolte & Jurgens Architects, Portland, OR

Industrial Design Corporation (IDC), Portland, OR

CH2M Hill, Inc., Corvallis, OR

Anderson/Dabrowski Architects, Portland, OR

Zimmer Gunsul Frasca Partnership, Portland, OR

Thompson/Vaivoda Architects, Portland, OR

BOOR/A Architects, Portland, OR

Storch Engineering, Portland, OR

Mackenzie Engineering, Portland, OR

PROFESSIONAL AFFILIATIONS

Registered Architect in Oregon, Arizona (Nevada expired)

Member of American Institute of Architects (AIA)

NCARB Certification

Certified Construction Specifier (CCS)

Member of the Construction Specification Institute (CSI)

Past President of the Portland Chapter CSI

EDUCATION

Bachelor of Arts, Architecture: University of Oregon

REFERENCES

Corey Morris

Carleton Hart Architects

503-***-****

adb47f@r.postjobfree.com

Alexander Lungershausen

Hennebery Eddy Architects

503-***-****

adb47f@r.postjobfree.com

Scott Andrews – President Melvin Mark Brokerage

503-***-****

adb47f@r.postjobfree.com

Brian Mc Carter ZGF

503-***-****

adb47f@r.postjobfree.com

Lee Kilbourn FAIA/FCSI-

503-***-****

adb47f@r.postjobfree.com

Father Rodel-Holy Family Parish

503-***-****

adb47f@r.postjobfree.com



Contact this candidate