PERSONAL DETAILS
Gender: Male
Marital Status: Married
Languages: English
Nationality: Zimbabwean
ID Number: 74-406410n42
Home Address No. 42 Vincent Ave, Palmerstone, Mutare, Zimbabwe Cell: +263-***-***-***
E-mail: ******@*******.***, ********@*****.***
• Member of the Zimbabwe Institute of Engineers (ZIE)
• Self motivated person who is always keen to learn and accept new ideas
• Believes in teamwork
• Able to work under pressure.
• Innovative and very responsible.
CAREER OBJECTIVES
1. To pursue my studies and further my profession while establishing stability and career growth through an urge to learn and build a foundation of engineering skills and technical knowledge.
2. To be part of an organisation that values team work and encourage diversity of thinking towards achieving of organisational goals.
3. As a dynamic, highly motivated and open-minded individual, with an ability of working in a multicultural Environment, I seek to impart my skills to working in any organisation’s Engineering Department or any other departments were my skills are of good use.
CHIUKIRA CLIFF: Curriculum Vitae Page 1 of 4
PROFESIONAL QUALIFICATIONS
• Pursuing Higher National Diploma in Civil Engineering (2019 - 2020)
• National Diploma in Civil Engineering (2016)
PROJECTS AND FIELD TRIPS UNDERTAKEN
• Harare roads rehabilitation
• Caledonia Housing project (Harare Project)
• Borehole rehabilitation project (Hwedza)
• Chimbondi clinic septic tank designing and construction (project)
• Handicap ramp (project)
• Nyazura water treatment plant design (final year project)
COMPUTER LITERACY
• MS Applications (Word, Excel, PowerPoint)
• Google Earth • AutoCAD
ADVANCED LEVEL
School Attended: Crystal Academy (2006-2007) 3 A” level Arts (9 points)
ODINARY LEVEL
School Attended: Marange High School (2001- 2005) 7 O” levels including English & Mathematics
WORK EXPERIENCE
1. Bitumen World Pvt Ltd (March 2018 – Till to date)
A. Chimanimani Cyclone Ida Restoration Works
Value : 71,9million ZWL
Summary of Works include:
• Joppa – Koppa Road Reconstruction (22km,7m Surfaced)
• Junction – Koppa via Nyabamba (New route 16km)
• Machongwe – Junction road re-gravelling
• Nyahode 2 Embankment reconstruction
• Chimanimani to Tilbury road slips Bypass CHIUKIRA CLIFF:
Curriculum Vitae
Page 2 of 4
Position Contract period Start date Status
Duties:
: Site Agent Assistant
: 9 months : 08/08/19
: Still in progress
B.
• Insuring we comply with our QMS ISO 9001: 2015 and OHS 45001:2018 regulation standards.
• Site supervision and coordination of works
• Measuring of all works in preparation of Interim payment certificate.
• Carrying any other duties delegated by the Contract’s manager
Mandamabwe-Chivi-Tokwe Road rehabilitation (48,2km)
Value
Position Contract period Start date Status
: 8million USD
: QA/QC Engineer : 3 months
: 17/06/19
: Project on hold due to Client’s final issues (38km open to traffic)
Duties:
• Insuring we comply with our QMS ISO 9001: 2015 and OHS 45001:2018 regulation standards.
• Site supervision and coordination of works
• Carrying out field density test
• Accounting for all materials received on site
• To insure construction program is followed
• Writing progress reports
• Carrying any other duties delegated by the Contract’s manager
Ngundu Tanganda Road Rehabilitation Phase 2 (54km)
Value
Position Contract period Start date Completion date
: $10,2million USD : Site Engineer
: 4 months
: 12/02/19
: 12/06/19 (1week earlier)
Duties
• Insuring we comply with our QMS ISO 9001: 2015 and OHS ISO 45001:2018
regulation standards.
• To ensure construction program are carefully planned and appropriately resourced
• Co-ordination with engineering team for providing on site supervision
and technical support.
• Controlling and checking cement spreading, monitoring compaction effort, MC30
and bitumen spray sheets on site
• Monitoring and analyzing all field tests that include moisture context, field density
against specified and UCS test.
CHIUKIRA CLIFF: Curriculum Vitae Page 3 of 4
D. Chimanimani Cyclone IDAI Emergency Works
Duties:
• Construction of temporary access routes, earthworks on river crossing and road formation in all inaccessible areas affected by cyclone IDAI these areas includes:
River Crossing Bridges included:
• Vhuvhuvhu bridge
• Nyahodi 2
• Nyahodi 4
Roads included:
• Hearthfield - Peacock
• Rusitu road
• Coppa - Vimba road
• Nyabamba road
• Machongwe road
• Vimba – Muchadziya road
• Ndima – Vimba road
FINISHED PROJECTS:
• Ngundu Tanganda Phase 2 road rehabilitation
• Harare Drive (Drew to Borrow Dale road) 4.5km road reconstruction
• Sunning dale 1 road rehabilitation
• Domboshawa storm water drain construction
• Harare Bus Terminus rehabilitation
• Golden Quarry Bus Terminus construction
• Whelson Transport Parking Bay Rehabilitation 13000m2
• Mbare Matapi road Rehabilitation
• Marondera Phase 2 roads rehabilitation (on going)
Housing Cooperation Zimbabwe (November 2017 – End February 2018)
Position Project Value
: Site Engineer
: Concrete Housing Project (CALIDONIA)
: 350million USD
Duties
• Site supervision and coordination of work
• Daily costing
• Accounting for all materials received at site
• Insuring concrete quality checks
• Writing weekly and monthly progress reports
• Monitoring program of works
CHIUKIRA CLIFF: Curriculum Vitae
Page 4 of 4
3. Real Consulting Engineers (March 2017- June 2017)
Position: Civil Engineer
Duties
• Handling construction and post construction co-ordination issues between
related parties of the projects
• Tracking and ensuring timely completion of construction activities at site
• Co-ordinate with sub-contractors, monitor their performance in view of project
schedule
• Monitoring material requirements and submit to section in charge
• Structural detailing
Carrying out any other designated duties
4. Hwedza Rural District Council (Jan-Dec 2015)
Position: Planning Technician
Duties: •
Drawing of building plans using Auto CAD
• Record keeping and requisition approvals
• Preparation of base maps, site layouts using GIS
• Setting out of roads, paving parking and culverts
• Steel fixing of reinforcement bars
• Setting out of roads
• General land survey works
• Quantity survey and preparation of bills of quantities
• Raising requests for materials of specific sites
• Assessing and recommending repairs on houses to be renovated
• Ensuring that adherence to the program of works is done
• Accounting for all materials received from donors
• Writing weekly and monthly progress reports
• Coordinating with other implementing partners, NGOs and other stakeholders
• Site supervision and coordination of work
• Maintenance of roads and bridges
• Design and Construction of culverts
• Preparation of roads maintenance programs
• Designs, draughting and survey of projects
• Maintenance and design of water projects in clinics and business centers
• Borehole drilling supervision and maintenance
• Any other duties as may be delegated by the Engineer
WORK RELATED TRAINNING (acquired knowledge and skills)
• Clean class four (4) driver’s license
• AutoCAD 2000-2010, ArchiCAD 15
• Density test nuclear method (HUMBLOTD)
• Concrete and steel design (Structural Engineering Design) Prokon 2.4-2.5
• Soil Sampling Techniques
• Using a leveling machine
CHIUKIRA CLIFF: Curriculum Vitae Page 5 of 4
HOBBIES
Playing rugby, athletics and cooking. Socializing, reading, watching movies, Listening to music and Traveling
CHIUKIRA CLIFF: Curriculum Vitae Page 6 of 4
REFEREES
Tongai Chitiyo
Quality Mananger
Bitumen World Pvt Ltd Website:www.bitumenworld.net Tel:024 447231
Eng. Ndumiso Nyoni
Senior Site Engineer
Housing Cooperation Zimbabwe
Harare
Tel: +263-***-***-*** S
Mr. Chinyanya
Hwedza Rural District Council (Acting Engineer) Hwedza
Tel: +263-***-***-***
Eng. Jackson A. Njunga Pr. Eng
Shumba Construction and Engineering (PVT) LTD Mutare
Tel: +263-***-***-***
CHIUKIRA CLIFF: Curriculum Vitae
Page 7 of 7