MICHAEL B. LAUTINGCO
**** *** ********* **** ******,
Nagpayong 2 Pinagbuhatan Pasig City
Cell Phone # 090********
Email Address: ****************@*****.***
To obtain a position that will enable me to use my strong organizational skills, educational background and ability to work will with people. Facing the challenge with positive attitude and determination in carrier development.
Company Name : Voltage Electrical Contractor
Designation : Electrical Forman
Address : # 5 Saint Catherine Street, Perpetual Village Taguig City
Contact No : 838901-95 Fax # 838 87 03
Project 1 : Park Central Tower, Cor. Paseo De Roxas Makati City
Duration : February 2, 2018 to September 21, 2019
Project 2 : Circuit Mall, A.P Reyes Ave., 1207 Makati City
Duration : July 19, 2016 to January 15, 2018.
JOB DESCRIPTION:
Completing paper work behind a desk manually entering data about a job at hand can take away from the time that could be spent on the task at the job site. I submit my daily progress report for electrical worker use to capture the details about electrical work from anywhere using a smart phone or tablet.
I take also photo evidence of damage electrical equipment, wire, pipes.
I complete my electrical inspection on site using my mobile device
Generate electrical installation Condition reports instantly and send them before leaving the site.
I will guide my Team to ensure data and communication networks are safe compliant and to mitigate any hazardous or detrimental effects general electricals work.
MY TEAM
Slaving : 11 Person
Box Setting : 10 Person
Fedder : 6 Person
WIRING:
Lightings : 15 Person
Power : 10 Person
TOTAL : 53 Person
Company Name : QD-SBG Construction
Designation : Industrial Electrician
Address : Al- Oweinah Tower 5 floor,Siyaha St Corniche Old
Salata DOHA QATAR
Contac Number : +974-******** / +974-********
Duration : October 30, 2014 to May 15, 2016
Project : LEKHWIYA (I.S.F) Camp Doha Qatar
J0B DESCRIPTION:
Building electrician high voltage termination, Layout PVC pipes for convenience outlet and switch lightings.
Lay out PVC pipes for convenience outlet and lighting switches.
Connection of wire to transformers, circuit breakers, as well as other components.
Cable pulling for all power points.
Mounting and fabricating of cable trucking, cable tray, cable tray, and cable ladder for all points.
Mounting and fabricating of main circuit breaker and telephone cabinet for all unit per level.
Wiring installation for lighting receptacle, fire alarm, and telecom.
Termination of main circuit breaker.
Trouble shooting of a shorted lines for lighting and convenience outlets at all points.
Fabrication and construction of parts.
Inspection of electrical equipment and system to recognize defect hazards and the requirement for repair of modification.
Testing of a circuit and electrical system using devices including, voltmeters, ohmmeters and ammeters.
Company Name : ALFANAR
Designation : Industrial Electrician
Address : C 11411 Kingdom of Saudi Arabia
Contact Number : +966-*-*******
Duration : October 10. 2011 to October 10 2013
Project : Substation 132/13.8kva and Gas Power Plant
JOB DESCRIPTION:
Installation of Gas Insulated switch Gear.
Installation Cable tray
Installation of steel support.
Installation of earthing system.
Installation of mechanical parts of GIS.
Modifying steel support.
Bus bar Trunking installation.
Installation of plug socket and de contactors.
LV-HV Electrical enclosure and cable boxes, cable support system, cable glanding.
Erection of panel of switch gear, HVAC, I/O Panel MCC, Fire Pump Moto, Transformer, Lighting, Emergency and Lighting Outlet Panel.
PLC wiring going to control valve, Flow Meter, Pressure Meter, intelligence AC Drive Heat, Heat temperature.
Wiring termination power generator cooler, hydraulic skid, lube oil cooler, hydraulic skid, pulse nit compressors, Inhibitor dosing skid for transformer, fuel oil skid motors power control center.
Company Name : Mid Mac W.L.L
Designation : Industrial Electrician
Address : Doha Qatar
Contact Number : +974-*******
Duration : March 21, 2010 to March 21, 2011
Project : Convention Center #532 and Cultural Center #524
JOB DESCRIPTION:
Piping and wiring of electronic door security system and fire alarm.
Installation cable trunking.
Cable pulling for equipment power, voice and data.
Wiring for transformer going to main distribution board using 800mm2/pvc/xlpe and use cable lugs and Hydraulic crimping tools.
Installation of grounding signal reference grids (SRG), Wiring of mineral insulated cupper conductor (MICC), small schematics and prepare lighting, outlet, emergency light.
Ability to read work order, purchase order logs, blue print schematics and prepare activity logs, reports and performance appraisal. Ability to speak and handle people with confidence, voice control and leadership.
Company Name : Freelance
Designation : Electrician
Address : San Sebastian, Home Owners, Nagpayong 2, Pasig City
Contact Number : N/A
Duration : May 19, 2004-April 5, 2005
Project : Mac Lawrence Learning School and San Sebastian
Home Owner Residences
JOB DESCRIPTION:
General installed outside properly line wall of electric post for ready access to the meter reader.
Main circuit breaker 400 Amps/wire no.100 mcm and 60 Amps circuit breaker in every each one service meter. Wire no. 5.5 stranded THHN coming from load side of consumer.
Maintenance of San Sebastian Residents and Mac Lawrence School, Additional 3 units of aircon split type.
Installed fire alarm
Company Name : Emavision Corporation
Designation : Electrician
Address : 114 San Francisco St. Mandaluyong City.
Contact Number : +632*******
Duration : May 3, 2004-November 2, 2004
Project : Billboard (SM West, Monument Ever Gotesco, Bicutan, Pangasinan Sual Power Plant, RCBC Tower 41 and 42 Floors in Shell Call Center.
JOB DESCRIPTION:
Installed 40-700 Watts, High pressure sodium lamp.
Powered by 220 Volts, control by timer switch and contractor.
Conference room renovation, Electrical of lightings and outlets.
Installed radia deemer switch.
Inspect electrical system equipment and component to identify hazard, defects and the need for adjustment or repair.
Career Orientation-Instrumentation Technology
Speaker by Mr. Wilnar D. Iglesia (Professor)
August 13, 2008 at MFI, Ortigas Pasig City.
Power Line Review Center
Registered Masteral Electrician (RME)
Speaker by Engr. Romeo Quisto and Engr. Vic Victorino.
December 15, 2013 to February 2, 2014 at Espana, Manila City.
Meralco Foundation Inc. (MFI)
Industrial Electrician
Speaker by Engr. David Antonio
August 11 to September 16, 2008 at Pasig City
SAMELCO Company
Hydrothermal Power Plants
Speaker by Engr. Leo Baldomaro
January 15 to February 15, 1997 at Calbayog, Samar.
Passed for Building Wiring Electrician Exam 3rd class
Last March 24, 1997 in Quezon Technical Vocational School at Calbayog, Samar
Elementary School : 1989-1990 Year Industrial Valley, Marikina City
High School : 1994-1995 Year Trinidad National High School,
Calbayog Samar
Vocational School : 1997-1998 Year Quezon Technical
(Practical Electricity), Calbayog, Samar
College School : 1998-1999 Year Teborcio Tancingco Memorial Institute of : Science and Technology, Calbayog, Samar
Short Courses : 2008 Year Meralco Foundation Inc.
Course : Electrical Engineering
Skills : Electrical
Sex : Male
Date of Birth : May 20, 1975
Place of Birth : Calbayog, Samar Province
Status : Single (With Partner)
Citizenship : Filipino
Religion : Catholic
Height : 163 cm
Weight : 125 lbs.
Father’s Name : Oscar R. Lautingco
Occupation : N/A (Disease)
Mother’s Name : Rowena B. Lautingco
Occupation : Housewife
Language : English, Tagalog, Waray
In Case of Emergency: : Joy Dollesco
Ph1 Lot28 Blk38 San Lorenzo Ruiz,
San Juan Homes, Taytay Rizal
Jennifer Advincula
Pasig City
Wellness Coach
Joseph Tuscano
Taytay Rizal
Waiter
I hereby certify that the above information is true and correct to the best of my knowledge and belief.
MICHAEL B. LAUTINGCO
Applicant
CAREER OBJECTIVES:
Professional employment:
Seminars and trainings:
EDUCATIONAL BACKGROUND:
PERSONAL DATA:
Character references: