Post Job Free

Resume

Sign in

Mechanical Engineer Machine

Location:
Coimbatore, Tamil Nadu, India
Salary:
950000 / annum
Posted:
November 13, 2019

Contact this candidate

Resume:

BE Mechanical Engineer having **.* years extensive experience in the field of Industrial Engineering, Manufacturing Engineering & Production Engineering

Managing overall Manufacturing Operation with the view to ensure timely accomplishment of targets within the cost parameters

Identifying opportunities for improvement through Value Stream Mapping & Continuous improvement initiatives

ands on Experience & knowledge of CNC Machining & Turning Centres, QC STORY,SMED, FMEA, POKAYOKE, ISO quality standards and TS 16949 concepts & Assembly Improvements (Takt Time & Line Balancing analysis)

Hands on Experience in working the Finance controller in Production for the preparation of annual Budgets, Monthly forecasts.

Hands on experience in Cost saving projects in manufacturing areas (Parts production, Vendor development & Assembly line.)

DEPUTY MANAGER – PRODUCTION

SIEGER SPINTECH EQUIPMENTS PVT LTD, COIMBATORE.

Global player in Textile Machinery

(From Sep 2018 to till date )

ASSISTANT MANAGER – INDUSTRIAL ENGINEERING

TSUGAMI PRECISION ENGINEERING PVT LTD, CHENNAI.

Machine Tool Division – Japan subsidiary

(From Jul 2017 to Aug 2018)

SENIOR ENGINEER – INDUSTRIAL ENGINEERING

LAKSHMI MACHINE WORKS, COIMBATORE.

Machine Tool Division & Global player in Textile Machinery

(From Dec 2008 – Jun 2017)

CNC ENGINEER – MANUFACTURING

G-PLAST (P) LTD, COIMBATORE

UMS Group of Company

(From May 2006 – May 2008)

ENGINEER - MANUFACTURING

(ASB INTERNATONAL (P) LTD, THANE.)

OEM for Injection moulding machine- Japan Subsidiary

(From Apr 2003 – Apr2006)

CNC OPERATING & PROGRAMMING

RANGANATHER INDUSTRIES, COIMBATORE (Dec 2002-Apr 2003)

TEXMO INDUSTRIES, COIMBATORE. (July 2001- Dec2002)

HITECH PNEU & HEAT TREATERS (P) LTD, Bangalore ( Jun 1999- Mar2001)

MACHINE SHOP (PART PRODUCTION).

Production planning & Scheduling in Machine Shop

Process Planning & Process establish in the CNC Machine

Handling on Cost Reduction Projects

(Setup time Reduction & Cycle Time Reduction).

Resource Development.

System Development (DMS, MR & PDCQMS)

Preparation of SOP, FMEA

MACHINE ASSEMBLY

Line Balancing for Parallel Assembly & Main Assembly

Dedicated Resource & Workstation

Layout for Assembly line.

Handling on Cost Reduction Projects

(Assembly Time Reduction & Throughput time reduction).

Resource Development.

Develop low cost automation in Assembly floor.

System Development (DMS, MR & PDCQMS)

Preparation of SOP, FMEA

OFFICE INTERACTION : MS OFFICE, OPEN OFFICE, LIBRA OFFICE.

CAD / CAM PACKAGE : AUTO CAD, SOLID WORKS, EDGE CAM, KELLER.

BUSINESS SUITE : ORACLE – ERP SYSTEM,(0racle -12i).

MACHINE SHOP (PART PRODUCTION).

SETUP TIME REDUCTION by 75 %

( ZPS, SMED, DEDICATED RESOURCES)

CYCLE TIME REDUCTION by 50%

(NEW GENERATION OF CUTTING TOOL (CBN INSERTS), COMINATION TOOLS, MODULAR BASE PLATE WITH MULTI OPERATION FIXTURE.)

QUALITY IMPROVEMENT :

( PROBING SYSTEM, IOT INTRODUCTION ).

Responsible & Preparation for ISO/TS 16949, ISO 14001, OHSAS 18001 & AS9100C

Lean concept introduction for takt time analysis.

MACHINE ASSEMBLY LINE :

ASSEMBLY TIME REDUCTION by 250%

(MICRO LEVEL ANALYSIS FOR VALUE ADDED BY ECRS METHODLOGY)

THROUGHPUT TIME REDUCTION by 400%

(MICRO LEVEL ANALYSIS FOR PARALLAL ASSEMBLY & LINEAR ASSEMBLY)

PROUCTIVITY INCREASED.

ASSEMBLY SPACE REDUCTION by 100 %.

(TAKT TIME ANALYSIS, LINE BALANCING & DESIGNING OF LAYOUT)

QUALITY IMPROVEMENT

(DIGITAL MEASUREMENT SYSTEM, DATA CAPTURING BY IOT, TEST RIG).

ENHANCED BY RESOURCE UTILISATION.

(UTILIZATION BY IMPROVING MORALITY & BEST WORKING ENVIRNOMENT)

PERSONAL INFO

FATHERS NAME

L.ARJUNAN

OCCUPATION

FORMER

AGE

39 Years

Marital Status

Married

Nationality

Indian

Permanent Address

8/87 Bembatty village, Ithalar post,

Kundah Taluk,

The Nilgiris

PIN-643 004.

Tamilnadu.

Overall Management for CNC Machine Shop & Assembly Floor.

Responsible for On Time Delivery with Quality parameters.

Production scheduling & Monitoring for Daily basis in Machine Shop & Assembly

Productivity improvements & Sustainability for shop floor.

Monitoring OEE for entire Machine shop.

Floor complaints, Corrective & Preventive action.

Cost reduction projects like setup time rejection, cycle time rejection.

Process Routing & Time Estimation for each & every operations.

Develop FMS for both part production & assembly floor.

TAKT Time analysis & Line Balancing for assembly area.

Time Study & Method Study for entire assembly operation.

ISO coordinator for industrial engineering department.

Quality improvement projects like test kit, Digital Measurement for every small assembly.

Budget proposal & ROI for next forthcoming year.

I do hereby confirm that the information furnished above is true to the best of my knowledge and belief.

Place: COIMBATORE.

Date: [A.SABAREESAN.]

CARRIER OUTLOOK

CARRIER TIMELINE

1.0 Year

1.0 Year

8.7 Years

2.0 Years

3.0 Years

4.1 Years

ACADEMIC CARRIER

BE- Mech (Part time)

Anna University -CBE

(2011-2016)

DME

Govt. Polytechnic Ooty

(1996-1999)

HSC

Govt. Hr.Sec School

(1994-1996)

SSLC

Govt. Hr.Sec School

(1994)

CORE COMPETENCE

SOFTWARE COMPITENCE

ACHEIVEMENTS

Communication skill

Tamil: Read, Write, Speak

English: Read, Write, Speak

Hindi : Speak

Kannada: Speak

RESPONSIBILITY FOR PRESENT EMPLOYER

DECLARATION



Contact this candidate