Larry Aguilar Montanez
*****.************@*****.***
Present Address:
** ******* ****** ***** *******, Taguig, Metro Manila, Philippines
Permanent Address:
** ******* ****** ***** *icutan, Taguig 1632, Metro Manila, Philippines
Basic Information
Age
48
Birth Date
May 27, 1971
Gender
Male
Civil Status
Married
Height (cm)
157.52
Weight (kg)
81.82
Nationality
Filipino
Religion
Christianity - Catholic
Work Experience
I have been working for 11.73 years
Sep 2014 - Feb 2017
(2 Years, 5 Months)
Excavator Operator
Urbacon Trading And Contracting
Doha
Project: Lusail Rclamation Island Marine Works
Job Description
Daily check the machines before working. (Engine Oil, Hydraulic Oil, Coolant and walk around to for leak oils
Follow Personal Protection Equipment.
Cleaning silk and profiling quarry run and under layer using (22 meter) long reach with GPS
Unload armour rock materials from barges using grappler. Load materials to pontoon barges and position the barges for specific location using GPS
Backhoe Dredging cleaning sea bed before placing Quarry Run, under layer and Armour Rock using (Long Boom) and GPS Unloading Materials from Barges like Quarry run, under layer and Armor Rock and Segregate the in stock file.
Profiling of Quarry Run and under layer using (22meter Long Boom) with GPS
Interlock armour rock using (3-6 tonnes) slope and crest for final stages using grappler or bucket.
Jan 2005 - Mar 2014
(9 Years, 2 Months)
Excavator Operator
ATHENA SA
Abu Dhabi
Projects:
1. Construction of Marine Quay Wall for Coastal Guard Group at Ras Al Khaima, UAE
2. Construction of Pavement Naval for Camp in Al Taweela, Abu Dhabi, UAE
3. Desert Island Sir Bani Yas Projects, Logistic Port, Ro/Ro Berthing Marine Works, Abu Dhabi
4. Expansion of Port of Khorfakkan 1 and 2, Sharjah, UAE 5. Rock Revetment Marina Mall, Abu Dhabi UAE
Job Description:
Daily check the machines before working. (Engine Oil, Hydraulic Oil, Coolant and walk around to for leak oils
Follow Personal Protection Equipment.
Select stones depending on sizes from quarry area using bucket. Unload armour stones from the trailer for the stock pile using grappler.
Separate blasted materials for specific weight/size from Quarry area and load in dumper for breakwater and stock file area. Trimming and slopping of core materials using GPS (Leica) installed and setup by surveyors in preparation for other stages of layering materials for revetment and breakwater.
Interlocking of Armor Rock for final stages of revetment and breakwater using Grab or Bucket
Educational Attainment
Jun 1989 - Oct 1991 TRACE Computer Collages
Vocational Diploma / Short Course Certificate
Computer Hardware Technology
Licenses / Certifications
Jan 26, 2015 Qatar License
Sep 13, 2006 UAE License
232168
Government Documents
Passport ID Number: 1
Place of Issue: 1
Date of Expiration: Nov 30, -0001
NBI Clearance ID Number: 1
Date of Expiration: Nov 30, -0001
Skills Rock placing using bucjet or grpppler Profilling with or without GPS Languages Tagalog, English
Character References
Mohamed Tayara Senior Construction Manager
Urbacon Trading And Contracting
+974660568
*******@*******-****.***