Post Job Free

Resume

Sign in

Electrical Engineer Water Treatment

Location:
San Miguel, Bulacan, Philippines
Posted:
October 17, 2019

Contact this candidate

Resume:

Cover Letter for Job Application:

Hi Sir/Mam,

Subject: Applicant for Electrical Engineer

I would like to apply for the position of any related Electrical Engineer role within your company. I believe this position would provide a great opportunity to further my chosen career. My willingness to work hard and build my skill base will make me a good candidate for the job. I graduated at (NU) National University in a diploma of Bachelor of Science in Electronic & Communication Engineering year 1998 - 2003 and (ACLC) AMA Computer Learning Center in diploma of Associate in Computer System Design & Programming year 1995 - 1997. My Coursework has introduced me to Office and Site for Electrical Project Engineer, Quality Control Procedure, Testing & Commissioning, Site Electrical Engineer. With Over Thirteen years of experience in the field of Electrical Engineering Construction with a various projects such as Airport Project, Mixed Used Project, Research & Development Laboratory Projects, Hospital Project, Hotel & Casino Projects, Manufacturing Projects, Waste and Water Treatment Plant and Commercial & Transportation works for Supervision, Execution, Installation, Testing and Pre-Com & Commissioning of LV & ELV Electrical Commodity, and also field works with Quality Assurance, and Energization & Re-energization to complete particular features of work each week.

The high level of practically in my course will decrease your required training time and mean I am well prepared to assist with fieldwork.

I look forward to hearing from you at your convenience. Bernardo S DADULLA Jr.

Manila, PHILIPPINES

CELL. # +63-995-***-****

E-mail Add : adaly1@r.postjobfree.com

Page 1 of 4

NCI Newcore Industries Company

Proposed Position Electrical Engineer CV No. 001

Current Position:

Years of Experience:

MEPF QA Engineer

14 years PLUS

ELECTRONIC AND ELECTRICAL CODE SAFETY:

Provide the necessary guidelines as to standards, regulations, requirements, installation operation, maintenance and application with the views to ensure adequate protection and safety to persons engaged and use components, devices, equipment, plants, installation, services/facilities installed in commercial, industrial, social and institution building. Qualifications

BSc in Electronic & Communication Engineering (1998 - 2003) Asc. In Computer System Design and Programming (1995 – 1997) NETA level III and IV Electrical Inspector New Doha Int’l. AIRPORT Project (CP-18) IECEP

Institute of Electronic and Communication Engineer of the Philippines Member Number: 99-07525

National Student Chapter

Work Summary:

Provides technical assistance to Electrical and Instrument and their designees, project supervision, field engineer and keep and the construction site management informed on matters relating to installation and quality control.

Maintains an open dialogue with site and factory vendor representatives to assist requirements and to have proper vendor representatives at the site to support installation, testing or trouble shooting.

Interfaces directly or indirectly with the other site project discipline field engineers, scheduler, craft supervision, client management representatives, maintenance, operations departments, start-up personnel, equipment and material vendors, sub-contractors quality control and safety.

FIELD OF DISCIPLINE & COMPETENCY:

Experience in work as MEPF QA Engineer, T&C MEP Engineer, QA/QC Electrical, MEP Supervisor

(Electrical), MEP Electrical Commissioning Engineer, Project Electrical Engineer, Site Electrical Engineer.

Duties and Responsibilities:

- Site Supervision and implementation to ensure that the works are done in accordance to project requirements and code standard.

- Supervision experience in the installation and commissioning of LV Switchgears, ELV, MCC’s, VFD’s Transformers, Bus ducts, LV & ELV Cables, Cable Trays/ Ladders.

- Monitor work progress and coordinate with subcontractor site engineers related to all electrical work status, material and manpower.

- Prepare material take-off for engineering procurement and construction (EPC) project.

- Review, check and issue comments on the shop drawings and material submittal.

- Conducts internal project technical quality and presents reports to management and the project team.

- Prepares the checklists; conducts meeting; issues findings (when required).

- Prepares and issues the final report, recommending opportunities for improvement; and follows up to verify that the appropriate corrective actions have been completed. Work Experience

April 2018 – Present Newcore Industries Company

Position: MEPF QA Engineer

PROJECT: (Fit-Out) DATA Center and BPO

- To focused on providing confidence that quality requirements will be fulfilled.

- Involves in continuous evaluation of the adequacy and effectiveness of the overall Quality Management System in order to evaluate the deviation from established quality objectives.

- Coordinate activities to direct and control an organization with regards to quality.

- Check Contractors Responsibility throughout the execution and completion of the Works and the remedying defects therein have full regard for the Quality Assurance.

- Check Contractor responsibility for the development and implementation of a Quality Assurance Program consistent with the requirements to assures workmanship, equipment and material conformance to the applicable requirements of every Section of the Specification.

- Ensure Contractor’s Representative shall observe and inspect the Works for all concerned project Quality compliance during the performance of the Work up to and including the Completion Date.

Bernardo S DADULLA Jr.

Manila, PHILIPPINES

CELL. # +63-995-***-****

E-mail Add : adaly1@r.postjobfree.com

Page 2 of 4

NCI Newcore Industries Company

- Check System Description and assure the quality throughout all applicable areas of performance, such as the design of temporary works and structures, inspections, testing and construction activities.

- Verify compliance with the Specifications and all referenced standards. Feb. 2015 – Dec. 2017 QEMG Qatar Electro Mechanical Group Al Mana Position: QA/QC and Commissioning Engineer Electrical PROJECT: Research and Development Center Laboratory Project

(Completion Project Phase)

- Review vendors/sub-contractor submitted test procedure for acceptance prior to their implementation.

- Ensure that all required testing is properly identified, planned, documented and perform under control and suitable environmental condition.

- Ensure testing shall be performed in accordance with written procedure of quality control plan.

- Ensure testing may be performed by third party testing services and under supervision to validate sampling and testing.

- Ensure during initial start-up may be necessary to verify the process is under control and complies with technical specification of the construction contract.

- Remove temporary power and site services.

- Surplus or disposition extra material.

Position: QA/QC Electrical Engineer

PROJECT: Doha OASIS Mixed Used Project

(Initial Project Phase)

- Responsible for Field Oversight for Quality Control Procedures.

- Responsible for monitoring Quality Activities to ensure they conform with con-tract documents, Implemented Field Correction to Design Error.

- Impact issue and Unforeseen Condition.

- Recommended Opportunities for Improvement and Follow up to Verify that the Corrective Action has been made.

- Read and Interpreted Design Drawing and Specification to ensure current revision was made and Correct Technical Execution of Work.

- Provide Progress Data to the Project Manager.

- Responded for Field Inspection and maintained as built and Drawing Verified. Inspected Progress of Work for Conformance to Contract Documents. Dec. 2013 – Dec. 2014 LEIGHTON Contractor Philippines Corporation Position: MEP and Commissioning Engineer Electrical PROJECT: City of Dreams Hotel and Casino

(Completion Project Phase)

- Established good safety practices and client requirement for maintaining worker safety on electrical circuits.

- Assists site designated tagging authority, who is responsible for coordinating the construction site Lockout/Tag-out procedure.

- Established jobsite procedure for documentation of client and vendor witnessing electrical circuits and equipment testing.

- Issues scoping requirements of raceways, cable, termination, jumpers, equipment

(from system scoping P&ID) to supervision system and facility to support system and facility turnover.

- Maintain maintenance record, electrical testing result, system and facility records, start-up, design or field documentation changes and as built.

- Witnesses insulation resistance and circuit checks, verifies lighting and illumination as per design or codes.

- Perform Inspection and construction testing activities as required.

- Review completed installation for correctness against engineering design, standards and codes.

- Resolve identified installation problem.

- Commence systems and facilities turnover punchlists, walkdowns and inspection.

- Complete equipment cable tie-ins.

- Complete testing and as built drawing activity. Turnover system and facilities to the client

Aug. 2013 – Nov 2013 KINDEN Philippines Corporation Position: Project Engineer

PROJECT: Manufacturing Project (Semicon)

(Completion Project Phase)

- Constructability reviews are performed before work is released for construction.

- To keep job quality at the highest level possible and maintain a positive client perception of the completed work.

- Project quantities properly forecasted and reported.

- Establishes and maintain communication with the project design groups in the Bernardo S DADULLA Jr.

Manila, PHILIPPINES

CELL. # +63-995-***-****

E-mail Add : adaly1@r.postjobfree.com

Page 3 of 4

NCI Newcore Industries Company

resolution of field installation concerns, design conflicts, queries and constructability.

- Execute field material takeoffs from designed drawings, initiates material requisitions for electrical testing equipment, spare parts, bulk electrical material, dispositions surplus, coordinates long lead material items.

Oct. 2012 – July 2013 FUJIKASUI Philippines Corporation Position: QA/QC Electrical Engineer

PROJECT: Manufacturing Project (Semicon)

(Completion Project Phase)

- Verifies conduit sizes and fill, cable size and type, raceway design and layout, single lines, loop drawings, panel and circuit schedules, termination and jumper lists, P&IDs.

- Update daily installed quantities, report weekly installed quantities to project control, generates backcharge request, identifies new work scope, rework, reforecasting of to go quantities.

Mar. 2011 – Sept. 2012 TAISEI Corporation

Position: MEP Commissioning Engineer

PROJECT: CP18 New Doha International Airport Project

(Peak and Completion Project Phase)

- Project plans and specifications provide much of the information needed to pre- pare a thorough inspection.

- Maintain maintenance records, electrical testing results, system and facility records, nonconformance dispositions, startup, design or field documentation changes, as builts, site electrical database.

- Witnesses insulation resistance and circuit checks, verifies lighting and illumination is per design or codes

- Established good safety practices and client requirements for maintaining worker safety on electrical circuits.

- Assist the site’s designated tagging authority, who is responsible for coordinating the construction site’s Lockout/Tag out procedure.

PROJECT: (NDIA) New Doha International Airport CP18

- (SAT) System Test Acceptance

- (FTA) Functional Test Acceptance

- Substation (LVSS, ELVSS, Dry Type Transformer and (ATS) Auto Trans- former Switches

- Distribution Panel

- (PMCS) Power Monitoring and Control Systems (LPS) Lightning Protection System

- (UPS) Uninterruptible Power supply System

- (LMS) Lighting Management System and small power Internal and External Lighting

- Emergency Lighting Inverter Panels

Mar. 2006 – Feb. 2011 FUJIKASUI Philippines Corporation Position: Electrical Project Engineer

PROJECT: Manufacturing Plant Project

(Completion Project Phase)

- Reviews design drawing for Construction requirements to determine if enough information is identified for Constructability.

- Verifies conduit sizes and fill, cable size and type, raceway design and layout, single lines, loop drawings, panel and circuit schedules, termination and jumper lists, P&IDs.

- Update daily installed quantities, report weekly installed quantities to project control, generates backcharge request, Identifies new work scope, rework, reforecasting of to go quantities.

- Maintains, provides, update current as-built information for electrical installation and record prints for all underground electrical distribution systems, lighting, grounding, communications, raceway, cable, jumpers and termination.

- Establishes jobsite procedures for documentation of client and vendor witnessing of ELECTRICAL CIRCUIT and EQUIPMET TESTING.

- Knowledge in Transformer Network System (MV) Medium Voltage and (LV) Low Voltage, Emergency System and Essential Electrical System.

- Knowledge in (SLD) Single Line Diagram Power Transformer in Coordinated Thermal Protection.

- Knowledge in (SLD) Single Line Diagram in Electric/Induction Motor, (P&ID) Process and Instrumentation Design.

- Knowledge in 2D Autocadd (LT2000i), PLC (Fanuc, Mitsubishi).

- Knowledge in Computation of Voltage Drop, Circular Mill, Full Load Current of Motors, Motor Circuit and Controller.

- Knowledge in (TCL) Total Connected Load and Demand Factor Bernardo S DADULLA Jr.

Manila, PHILIPPINES

CELL. # +63-995-***-****

E-mail Add : adaly1@r.postjobfree.com

Page 4 of 4

NCI Newcore Industries Company

Project Handle in PHILIPPINES:

TOYOTA MOTORS Philippines Inc., PROJECT (Manufactured Building). KAWASAKI MOTORS Philippines Inc., PROJECT (Manufactured Building) IBIDIN Philippines Inc., PROJECT (Industrial Plants) GOTOH Philippines Inc., PROJECT (Industrial Plants) GNF Philippines Inc., PROJECT (Industrial Plants)

ENOMOTO Philippines Inc., PROJECT (Waste Water Treatment Plant) KOYO Philippines Inc., PROJECT (Waste Water Treatment Plant) FUTABA Philippines Inc., PROJECT (Waste Water Treatment and Pure Water Plant) NIKKO Philippines Inc., PROJECT (Waste Water Treatment and Pure Water Plant) YOKOHAMA Philippines Inc., PROJECT (Waste Water Treatment Plant) HONDA Philippines Inc., Project (Waste Water Treatment Plant) TOYOTA AUTO PARTS Philippines Inc., PROJECT (Dimeniralized and Evaporator Water Treatment Plant)

GOTOH Philippines Inc., Project (Gas Solution and Gas Scrubber Plant) LRT (Light Rail Transit) Project (Waste Water Treatment Plant) Oct. 2003 – Feb. 2006 FANUC Philippines

Position: Service Electrical Engineer

PROJECT: Control System

- Guarding, Grounding and Labeling

- Ampacity of Supply Conductors

- Overcurrent Protection and Disconnecting Means

- Component Interconnection

- Remote Control

- Selector Switch

- Foot Switch

- Control Panel

- (PM) Preventive Maintenance

- Installation, Alignment, Labeling, Lebeling and Testing

- Repair and Calibration of Electrical and Mechanical parts

- Knowledge in Instrumentation and Pneumatic Control

- Knowledge in (PLC) Programmable Logic Control

- Knowledge in LADDERIZED diagram

- Knowledge in ELECTRA and ELECTRO Pneumatic Controls

- Knowledge in (DOS) Disc Operating System Program

- Knowledge in Electronic, Electrical and Mechanical Troubleshooting

- Knowledge in Electronic and Electrical Diagram

- Production Maintenance

- Printing

- Cutting

PERSONAL DATA:

Position Desired:

Electrical Engineer

Age: 40 years of AGE Status: MARRIED

Height: 5’5” Weight: 130 lbs.

SEMINARS AND LECTURES SERIES:

(PBS) People Based Safety March 28, 2011

STARRT March 31, 2011

Work at Roof March 30, 2011

Confined Space April 03, 2011

LOTO (Log out-Tog-out) April 04, 2011

Work at Height April 05, 2011

Fire Watch April 06, 2011

(LOTO) Lockout/Tag out April 07, 2011

Safety Training April 2007

(JHA) Job Hazard Analysis March 2008

Safety Fire and Protection April 2008

(IEEE) Construction Material Lists March 2009

CHARACTER REFERENCES:

Reference available upon request, as this information is private and personnel CODE OF ETHICS:

Be fair and tolerant in his dealings with fellow engineers.



Contact this candidate