Post Job Free

Resume

Sign in

Civil Engineering Engineer

Location:
Rawdat Al Khail, Qatar
Salary:
12000
Posted:
October 14, 2019

Contact this candidate

Resume:

* * * * *

CURRICULUM VITAE

AVINASH NEELI

Email: adak42@r.postjobfree.com

Mobile: +974-********.

Career Objective:

To Achieve high career growth through a continuous process of learning for achieving goal & keeping myself dynamic in the changing scenario to become a successful professional and leading to best opportunity.

Core Competencies:

• Achievement

• Analytical Thinking

• Change Leadership

• Impact and Influence

• Initiative

• Organizational Awareness

• Teamwork

Educational & Professional Qualification

Bachelor of Engineering in Civil Engineering (B.TECH) Professional Experience:

Over 11+ years’ experience in construction field in India(3yrs) & Qatar(8+Yrs). OBAYASHI QATAR LLC

CURRENT POSITION : SITE ENGINEER

PROJECT : MSHEIREB DOWNTOWN DOHA

PROJECT (PHASE-03)

PERIOD : FROM SEPT 2013 TO SEPT 2019

(6 Years)

Responsibilities & Duties:

Successful completion of Structural and Architectural works of Residential – 14 storied + 4 Basement building within the contractual period.

Successfully completed 34 million manhours in the phase-03 project without LTI (Lost Time Injury).

Successfully completed Structural concrete works – Basement Raft concrete, retaining walls, Core walls, Columns, Beams, Slabs, Staircases – RCC stair cases, Metal stairs, raised floor slabs, Mezzanine floor slabs, floor screeding, concrete planters, Pre-cast manhole bases, covers, Rain 2 P a g e

water manholes, Foul water manholes, Electrical chambers, Telecom chambers, concrete encasings, collection pits, pre-cast road gully’s, pre-cast kerb stones, etc.

Successfully completed Finishing works Fit-out works – Water proofing (Floors, Walls, Roofs), Floor Epoxy applications, stone claddings, marble floorings, Tile flooring, Rubber flooring for gym, Wall & ceiling gypsum works, wooden wall claddings, kitchen wooden counter installations, Korean marble top installations, splash back installations, Kitchen appliances installations (Miele, siemens, Bosch, Frankie), Swimming pool works, façade STO rendering, Aluminium glazing works, stone copings, Aluminium copings, Roof claddings, Davit system, Metal ceilings, GRC ceiling works, Vanity counter installations, Signage installations, etc.

Successfully completed landscaping works such as Boundary kerb stone installations, Paving works, Granite stone floor installations, internal roads, water features, children play area, rubber floorings, wooden canopy, metal canopy, Aluminium decorative screens, Traffic coat Epoxy applications, Metal & wooden handrail works with light fixtures, pre-cast light pole foundations, bollard foundations, Tram stations, Decorative aluminium shed for tram station, Traffic signages, irrigation lines, potable water lines, fire line, etc.

Ensure that the project ongoing in accordance with all the approved construction drawings, contract documents, specifications and all applicable standards.

Resolving and reporting day to day issues, related to clashing of utilities, any utility encroaching the reserved corridors, or planned works.

Coordinates with MEP subcontractor regarding MEP work issues not to hamper construction schedules.

Prepare and submit inspection request to QA/QC Dept for various activities as per quality control requirements.

Prepare access handover for subcontractors prior to commencing their works as per subcontract agreements.

Study plans and design specification of project, review and check coordination of shop drawings and raise RFI's if necessary.

Prepare manpower, equipment & material utilization plan and apply sound decisions in delegating manpower on daily activities parallel to daily timetable.

Initiates two week look ahead program in coordination with planning engineer.

Closing of JSI’s (Job site instructions) issued by consultant.

Prepare and submit CA / PA (Corrective action & Preventive action) in closing NCR's raised from QA/QC department.

Closing finishing snag / De-snag lists prior to project handover. 3 P a g e

Complying with all application health, safety, and environmental laws, regulation and statutory obligations at all time.

Develop a good relationship with the consultant & client's representative Previous projects with current employer include

Project Consultant Management Consultant Client

1. Msheireb downtown project CEG TIME QATAR Msheireb Properties Comprises Retail, Offices, Luxury Apartments and 5-star Hotel. Total number of buildings is 14. Utility Services is a consolidated MEP & Utility building. Major co-ordination with Civil and MEP works. 2. Barwa city project AECOM QPM Barwa Real Estate

Multi use project including a shopping centre and commercial buildings. Involved in the structural works, finishes, Landscaping works until final handover of the project. Consists of East & West Amenities, North-East Kindergarten, North-West kindergarten, South-East Kindergarten, South-west Kindergarten, Hardscaping, Landscaping Works with Schools & commercial buildings. 3. Aga Khan Academy C & W HCP Aga Khan Foundation

The Aga Khan Academy in Hyderabad, a residential school for 1200 students, is part of 14 such academies being constructed in the various developing countries. The Academy, designed by HCP, is located on a 100-acre undulating site near the new Hyderabad International Airport.

It is the second in a network of about 18 planned Academies offering education to students in countries across Africa, The Middle East, South and Central Asia. Involved in the structural works, finishes, Landscaping works until final handover of the project. 4. NSL Textile Factory Project Gherzi Eastern India Ltd NSL Infra Pvt Ltd Nuzeevidu Seeds Limited is the biggest seed company in India. The structural works – Processing unit, weaving unit, Roads, Effluent treatment plant, infrastructure works around the building finishing work. Various industrial buildings spread in a huge area of 100 acres facilities for ginning, spinning, weaving, processing, dying and garmenting are equipped with latest technology machineries and manned by experienced workforce. Committed to the environment, the company has taken special care to preserve and upgrade the natural surroundings. Zero discharge at all the manufacturing plants, energy efficient machineries, water harvesting and energy recovery systems are only some of the steps company has taken in this direction.

4 P a g e

Previous Companies:

Shapoorji Pallonji Qatar W.L.L. Oct 2011 to Sep 2013 (1 year 11 months) Position: Site Engineer

Project: Barwa City Project

Responsible for not limited to marking of utilities, excavation, backfilling, levelling, laying of different services

1) Rainwater network

2) Foul water network

3) Potable water network

4) Chilled water network

5) EV & LV cable line network

6) Gas line network

7) Telecom network

8) Infrastructure & Landscaping finishes until final handover.

Successfully completed water feature, cross-over bridge, Different Light foundations, Pre-cast bases, Manhole covers, Electrical chambers, Feder pillar foundations, ramps, staircases, cycling tracts, internal roads, Pre-cast kerbs, paving works, retaining walls, pipe encasings, play areas, rubber floorings, Pre-cast road gully’s, fire hydrant chambers, storm water tank, etc.

Coordination with existing utilities-infra and planned utilities which are not part of current package, make sure all utilities pass through their reserve corridors and levels.

Study of construction drawing and prepare manpower, material and equipment schedules.

Overall review of all utilities, their clashes with each other, and their tie-in points.

Liaise with Supervision Consultant and the Main Contractor for making proposal for support and protection of services during active construction period.

Coordinate assigned activities with Design Consultant, Supervision Consultant, the Main Contractor and stakeholders.

Monitor project progress, compliance with specifications and safety standards.

Research the environmental impact of projects.

5 P a g e

Prepare proposal documents and presentations.

Create work schedules and adjust as needed to meet project deadlines.

Attending the QPM, AECOM meetings towards resolving the issues.

Conducting the internal weekly meetings regarding safety, MEP, work planning, productivity.

Raising MRIR’s, preparing Mock-ups, material indents, subcontractor coordination etc...

Coordination with subcontractors, MEP Engineers, in case of any discrepancy in the drawings raising RFI’s. Preparing CA/PA to the NCR closures etc…

Assisting the Construction Manager to determine project technical issues based on site status that affects works milestone schedules.

Prepare access handover for subcontractors prior to commencing their works as per subcontract agreements.

Study plans and design specification of project, review and check coordination of shop drawings and raise RFI's if necessary.

Prepare and submit method of statement in closing NCR's raised from QA/QC dept.

Initiates two weeks look ahead program in coordination with planning engineer.

Complying with all application health, safety, and environmental laws, regulation and statutory obligations at all time.

Develop a good relationship with the client's representative SHAPPORJI & PALLONJI CONSTRUCTION LTD, INDIA Sept 2010 to Oct 2011 (1 year 1 month) Position : Site Engineer

Project : AGA KHAN ACADEMY, HYDERABAD

Responsible for construction of Sub-station, On-call room, Sewage treatment plant (STP), Storm water storage tank, Irrigation water storage tank, infrastructural works not limited excavation, blasting of stones during excavation, RCC flume pipes for rainwater network, foul water network, HV & LV lines, Paving works, water features, and cricket court, diving pool, etc.

Responsible for finishing of structural works with pattern of exposed concrete finishing structures – Transformer building, Construction of Academy Building, Senior residence building, Athletic centre.

Study civil engineering specifications to determine appropriate construction methods, alternative analysis and implementation plans.

6 P a g e

Submission of weekly progress reports to Manager.

Determine labour requirements and coordinate with contractors to dispatch workers to construction site.

Help in requisitioning supplies and materials to complete construction projects.

Prepares work inspection requests (WIR) for each construction activity and submit to consultant to ensure it covers all the construction activities done on site.

Advise and monitor workers undertaking civil construction to complete and meet cost, time and quality specifications.

Review civil engineering work to monitor compliance with building specifications, safety codes and other regulations.

Oversee and supervise contractors and their workers and conduct routine inspections and quality check on all civil engineering works and provide appropriate feedback to concerned contractor.

Take actions to deal with the results of delays, bad weather, or emergencies at construction site which include overall risk management actions Confer with contractors to discuss and resolve matters such as work procedures, complaints, and construction problems.

Closings NCR’S and finishing snag lists prior to project handover.

Raise RFI'S where information is conflict or missing.

Investigate damage, accidents, or delays at construction sites, to ensure that proper procedures are being carried out.

NSL INFRA PVT LTD, INDIA May 2008 to Sep 2010 (2 Year 4 Months) Position : Site Engineer Trainee

Project : Processing & Dyeing Unit, Chandole

Responsible for the De-watering, Excavation, structural works such as retaining walls, Deck slab bridge, internal roads, Effluent treatment plant (ETP), Softening plant, Boiler Thermopac, Chimney for boiler thermopac.

Worked as a client representative Monitoring subcontract work accuracy and quality for weekly and monthly accomplishment evaluation.

Prepare and preside weekly construction meeting and coordination meeting.

Prepare minutes of meeting and meeting agenda.

7 P a g e

Check the abstract of Cost, and Bill of Quantities (BOQ) as per the contract of the project, Estimate and quantity evaluation, preparing Sub Contractor’s bills and claim and variation in quantities, rate etc.

Recording measurement of works completed, verifying contractor’s claims, preparing/checking of bills.

Submission of weekly progress reports to manager.

Targeting the work schedules towards achieving the base line schedule.

Understanding & compliance with general site safety standards and rules including communication to the team.

Ensure all the tests and reports are meeting the contract requirements & specifications of the project.

Tools & Software Exposure:

• M.S. OFFICE

• AUTOCAD

• AUTODESK CONSTRUCTWARE

• SNAGR

Personal Data

Passport no. : S2364268 (Valid till 16/04/2028)

QID No : 287********

Visa Details : Engineers Visa (NOC is Available)

Driving License : Available

Date of birth : 29th August 1987.

Sex : Male

Marital Status : Married

No. of Dependants : 2 Members

Nationality : Indian

LANGUAGES KNOWN : English, Hindi, Telugu

Declaration

I hereby declare that the above details furnished by me are true to my knowledge. Date: Yours Sincerely,

Place: N.Avinash



Contact this candidate