Orlando Mateos
***** ****** **. · Magnolia, TX **354
Cell:281-***-****
Home: 832-***-****
E-mail: *************@*********.***
SUMMARY OF QUALIFICATIONS
*** ***** ********** ** ****** of petrochemical and oil and gas related projects.
2Familiar with C.A.D. related systems (Pro-Pipe, PDS, PASCE, AUTOCAD, MICROSTATION, PDMS, CADWORX 3D, FLEXCAD, and BENTLEY.)
3Productive and reliable, learn new systems quickly, and take initiative.
EDUCATION AND TRAINING
PDMS (3D) Training, C.A.D. Center, Houston, Texas 2000
PDS (3D) Training, Intergraph, ABB, Houston, Texas 1998
(SPED) Process Plant Layout course, University of Houston 1991
Horn Drafting and C.A.D. Center, Houston, Texas 1988
Industrial Drafting and Design School, Houston, Texas 1980
WORK EXPERIENCE
Project:
Ryazan Refinery Modernization Project
Type of Unit:
Hydrotreating Unit
Job Duties:
Overall piping of reactor exchangers, reactor heaters and reactor, compressor stations
C.A.D. System:
PDMS, Autocad
Project:
C4 Olefins complex, Port Arthur Texas
Type of Unit:
Inalk Process Unit
Job Duties:
Responsible for piping of poly reactor and polyfeed coolers (Unit 54)
C.A.D. System:
PASCE and PDS
Project:
Monsanto Herbicide Facility Project, Camacari, Brazil
Camacari, Petrochemical Complex
Type of Unit:
Herbicide Facility
Job Duties:
Responsible for piping in the DSIDA area.
C.A.D. System:
PASCE, Autocad
Project:
NROC, Port Arthur, Texas
Type of Unit:
Polyethylene Plant
Job Duties:
Piperack stuffing and overall draft drawings.
C.A.D. System:
PASCE
Project:
Yanpet, Saudi Arabia Expansion Unit
Type of Unit:
Polyethylene Plant
Job Duties:
Responsible for overall piping of Unit 750 acetylene unit.
C.A.D. System:
PASCE and PDS
Project:
Westlake Project, Lake Charles, Louisiana
Type of Unit:
Polyethylene Plant
Job Duties:
Overall piperack stuffing, plot plan layouts, piping layout for skid mounted compressors.
C.A.D. System:
PASCE, Autocad
ORLANDO MATEOS
29618 Temple St. · Magnolia, TX 77354
WORK EXPERIENCE (Continued)
Project:
Escravos Gas Project (Offshore Facility), Bight of Benin, Nigeria
Type of Unit:
Gas Gathering compression Platform (GGCP)
Job Duties:
Responsible only for the overall design of all small bore piping and Deluge system.
C.A.D. System:
Pro-Pipe and Pro-ISO
Project:
Saudi Aramco – Berri Gas Plant
Type of Unit:
Gas Sweetening Facility
Job Duties:
Responsible for the overall piping design of the ABQAIA slug catcher area.
C.A.D. System:
PDS, Pro-Pipe and Pro-ISO (AutoCAD)
Project:
LIUHUA II-I Development Project, South China Sea
Type of Unit:
(FPSO) UNIT
Job Duties:
Overall piping and layout of module 2, which includes the production and well test separator and the wash water pumps and surge drum. Also, module 6 consisting of dehydrator and crude exchanger, as well as overall deluge piping on both modules.
C.A.D. System:
Pro-Pipe and Pro-ISO, (AutoCAD)
Project:
Saudi Aramco – Hawtah, Saudi Aramco Fields Facility
Type of Unit:
196,000 barrel a day on shore oil production and water reinjection facility.
Job Duties:
Overall piping design of both crude exchanger, as well as overall deluge piping on both modules.
C.A.D. System:
2D-Intergraph, Pro-Pipe and Pro-ISO
Project:
Resilin, Tablaso Venezuela
Type of Unit:
Polyethylene Plant
Job Duties:
Overall piping design of the absorption and reactor area, piping layout for compressors and compressor house.
C.A.D. System:
No C.A.D. system utilized all manual drafting and design.
Project:
Borger Refinery, Borger, Texas
Type of Unit:
Low Sulfur Diesel
Job Duties:
Overall plot plans, P&ID’s. (C.A.D. Coordinator)
C.A.D. System:
PASCE
Project:
Conoco – Delayed Coker Unit
Type of Unit:
Coker
Job Duties:
Piperack DWGS, overall plot plans.
C.A.D. System:
AutoCAD
ORLANDO MATEOS
29618 Temple St. · Magnolia, TX 77354
WORK EXPERIENCE (Continued)
Project:
NL Chemicals TIO - Lake Charles, Louisiana
Type of Unit:
Titanium Dioxide
Job Duties:
Pipe support details & design; overall plot plans and compressors.
C.A.D. System:
AutoCAD, PASCE
Project:
Texas Eastman, Longview, Texas
Type of Unit:
Ethylene
Job Duties:
ISO control, model building.
C.A.D. System:
No C.A.D. system utilized.
Project:
Good Hope Refineries, Good Hope, Louisiana
Type of Unit:
Visbreaker
Job Duties:
(Draftsman) ISO’s, Sections, model.
C.A.D. System:
Pro-Pipe and Pro-ISO, (AutoCAD)
Project:
Mobil Yanbu, Saudi Arabia
Type of Unit:
Ethylene
Job Duties:
(Draftsman)
Company:
Quest-Tech Solutions Pearland, Texas
Type of Design:
Magnetic level gages, Liquid level gages, over all design per customer request.
C.A.D System:
CADWORX 3D
Company:
Glex,Inc. Houston,Tx.
Type of Design:
Skid Mounted Packages, Ammonia Injection and Vaporization Systems Overall Structure Design and Equipment Location and Piping on Skid per clients request.
C.A.D System:
Cadworx 3D
EMPLOYMENT HISTORY
1980 – 1984 Draftsman-Designer CE LUMMUS CORP. Hou. Tx.
1985 – 1987 Piping Designer BECHTEL CORP. Hou, Tx.
1987 – 2003 Senior Piping Designer ABB LUMMUS GLOBAL INC. Hou. Tx
2003 - 2005 Senior Piping Designer FOSTER WHEELER CORP. Hou, Tx.
2005- 2010 Senior Piping Designer ENGLOBAL ENG. INC. Hou, Tx.
2010- 2012 Designer/Draftsman QUEST-TEC SOLUTIONS, Pearland, Tx.
2012- 2013 Senior Piping Designer GLEX, INC. Houston, Tx.
2013- 2017 Principal Piping Designer FLUOR, Sugarland Tx.
Personal References:
Sonny Guerrero – 713-***-****/ 713-***-****
Patty Edwards- 713-***-****
James Griffin- 281-***-****