Post Job Free
Sign in

Construction Manager Plant

Location:
Miami, FL
Posted:
October 02, 2019

Contact this candidate

Resume:

Michael D, Lynch

*** ** ***** ******

Plantation FL 33324

813-***-****

***********@*****.***

Summary of Qualifications

Experienced construction manager with over 30 years’ experience in concrete construction as general superintendent having spearheaded award-winning projects. Developing winning formula of strong engineering design background; hands on expertise; and excellent customer reporting. Extensive knowledge of the construction process; project planning; and ability to schedule construction in order to resolve any potential conflicts. Projects included processing plants, submarine bases, energy plants, airports, resorts, hotels, condominiums, high rise office buildings, shipyards, shopping centers, hospitals, prisons, and bridges.

Americraibe International Professional Experience January 2019-Present general superintendent

-$114M remodel, 3-14 story Y shaped building gutted to slabs and columns and exterior walls, MEP, elevators, enlarged 140 columns, re-pour the foundations wrapped with structural fabrics, and total removal of exterior walls and balconies and eyebrows

Harwood International September 2017-2019

general superintendent

-30-story reinforced concrete high-rise with emphasis on MEP, structural concrete and glass in Dallas, TX

Walsh Construction 2016-September 2017

AMLI (general superintendent)

-36-story high-rise, $160MM project consisted of reinforced concrete with structural steel and sloped glazing and 10-story parking garage in Dallas, TX Kast Construction 2015- 2016

Vue and Westin (general superintendent)

-Three building, $150MM project comprised of 20 story condo, 20 story hotel and 8 story parking garage located in Sarasota, FL

Coastal Construction 2012- 2014

Saxony Hotel (general superintendent)

-Two story, underground parking garage which consists of three separate buildings with tremie slab; 18 story, condo-hotel project located in Miami Beach FL.

Manhattan Construction, Tampa FL 2008-2012

The Element (general superintendent)

-35 story high rise 395 units, 10 floors of parking and amenities deck. Architectural concrete.

Turner Construction, Orlando FL 2004-2008

The Vue, Lake Eola, Orlando FL (general superintendent)

-35 story high rise with 1M sf tunnel form multi use condominium. $110M budget

The Sanctuary, Pine Street, Orlando FL (general superintendent)

-800,000 sf condominium, a multi-use facility with 375 units including a five story parking garage

Fluor Daniel Construction Company, Grand Cayman Island 2002-2004 The Ritz Carlton, Grand Cayman (general superintendent)

-Seven buildings, 800,000 sf condominium, a multi-structure project consisting of reinforced concrete structures, ranging from seven to nine stories. $250M budget Sordoni/Skanska Construction Company, Tampa FL 1998-2002 The Ritz Carlton Hotel, Sarasota FL (project superintendent)

-26 story reinforced concrete frame hotel with high-end finishes. Challenging elevated, post tensioned, 4’ thick girder slab.

Immunex Drug Corporate Headquarters, Seattle WA (general superintendent)

-Construction of seven buildings of multi-structure campus including two multi- story laboratory facilities and the five story corporate headquarters building. Project consisted of post-tensioned concrete frame buildings with high-end finishes, structural glazing, total energy complex and sub-terrain utility corridor. International Plaza, Tampa FL (project superintendent)

-Taubmann Centers 8,000T structural steel, 2M sf concrete high end finishes. Glass curtain wall, marble, stamp concrete and other specialty finishes. Bay Street won Architectural Concrete Award.

Beers/Skanska Construction Company 1992-1998

University of South Florida Dormitory Residency Hall (project superintendent)

-740,000 sf residence hall complex, consisting of 14 buildings ranging from five to seven stories with concrete frames, brick veneer, and curtain wall. 14 buildings. $75M budget

WFLA Channel 8 Studios, Tampa Tribune Headquarters FL (project superintendent)

-480,000 sf eight story digital television communications center consisting of an integrally colored, architectural concrete frame. Built as a hurricane safe structure to withstand 130 mph winds. This was an architectural award winner. $60M budget.

JH Pomeroy Engineering Projects 1986-1992

-Santa Fe/ Misner 7 Mile Bridge, Marathon FL

Association of Civil Engineers Award.

-Sunshine Skyway Bridge, St Petersburg FL

Largest segmental structure in the US with $800M budget

-Sun Coast Dome, St Petersburg FL

60,000 seats, multi-purpose, enclosed stadium

Peter Lyman Award Winner

-American Shipbuilding

5 T-5 tankers for US Navy with dual berthing docks for the US Navy and T5 Tankers

JA Jones 1978-1986

-Trident Submarine Base, Kings Bay GA

-Duval County Pre Trial facility, Jacksonville FL

First modular jail structure in the southeast

Education

Massachusetts Institute of Technology- Special degree in pre stressed concrete design procedures

Harvard School of Design- Application of Prestressed Concrete and Systems Construction Methods.

Associated General Contractors- Superintendent/Project Management Training Program Northeastern University, College of Engineering – BS Civil Engineering Awards

• Peter Lyman Award (excellence in engineering)

• Architectural Concrete Award for the Sanctuary in Orlando FL

• First Precast Segmental Bridge Award for Sunshine Skyway Bridge (St Petersburg FL)

• Architectural Concrete Award 2000 for International Plaza Tampa FL References

Steven Guzzon, Project Executive at Kast Construction, former project executive at Sardoni, Skanska and Manhattan (813/830-3077)

Kenny Batchelor, Construction Manager for Faena Inc (786/553-9502) Jim McCombs, Construction Manager formerly with Turner (407/625-8197) Walt Korkusz, President of CEG Texas (210/637-0977) Bill Carlson, Morganti Construction (203/743-2675) Brian Fern, Project Manager, Morganti Construction (203/743-2675)



Contact this candidate