Post Job Free
Sign in

Electrical Engineer

Location:
Jeddah, Makkah Region, Saudi Arabia
Posted:
September 26, 2019

Contact this candidate

Resume:

Emai

Con

CA

Profes

candid

Prof

New

From

Worki

respo

Install

Install

Testin

protec

W

W

HSE

l: hmsadiq_kh

tact: 0580656

AREER OBJEC

ssional, highly

date for position

fessional Ex

Saudi Bi

King Abdul

m May 2017

ing in an multi

nsible for

Passenger T

Air Traffic C

Main Rescu

4 Radio Site

2 Data Cent

Meteorolog

Crisis Mana

Multi storey

Load centre

Transportat

lation of first, se

lation of PVC, EM

ng and commissi

ction.

Ruby Tex

Working a

Pak pow

Working at Pak P

MEPCO

Working at 13

Qualificati

Diploma Sa

HSE Manag

H

han@yahoo.c

746

CTIVES:

qualified Electr

n requiring drive

xperience:

nladin grou

l Aziz Interna

To till Date

Billion Dollars M

Terminal Comple

ontrol Tower

ue and Fire Fight

es

tres

gical Observatory

gement Centre

y car park

es

tion centre

econd and third f

MT, RGS conduit

oning for lightin

xtile Mills Li

as a Power Hou

wer Tech ( E

Power Tech (Ene

Wapda132

32 grid Station

on & Achie

afety Inspector

gement System

Hafiz Muh

comCurrent Lo

rical Engineer w

e, initiative, resp

ups

ational Airpo

Mega Project: K

ex and supportin

ting building

y Building

fix systems up to

ts, cable trays, ca

ng system, small

mited

use Shift Engin

Energy Solu

ergy Solution) as

KV Grid Sta

n as Internee

evement:

r.

m.

hammad

ocation: Jedd

with excellent

onsibility and ch

ort (KAIA) J

KAIA (King Abdu

ng facilities

o termination.

able ladders and

power and SDB,

neer (February

tion )

s Assistant Eng

ation Bahaw

e (Oct 2009 to

Sadiq

ah KSA. Natio

organizational

hallenge

Jeddah

ul Aziz Internatio

d raceway with p

, FDB, CBS, UPS,

2016 to April 2

gineer (Nov 201

walpur

o May 2010 &

onality: Pakista

and team wor

onal Airport) as

proper support.

, safety panels in

017)

14 to January 2

& Nov 2012 t

ani

rking skills. Ide

s a Electrical En

ncluding LV cabl

2016)

to April 2013

al

ngineer Quality

es, grounding an

3)

Control Departm

nd lightning

ment

Responsibilities:

Having experience of maintenance or running Gas plant operating on Power plant.

Capacitor bank & power factor improvement panel

Good Knowledge of Star delta and DOL Reversed Forward and invertor& VFD

Maintenance of three phase and single phase motors.

Power & control cable Gladding & Termination

Power installation.

Earthling and lightning installation work

Power and control cable wiring & dressing.

Worked on PLC system operation.

Reviewing the project specifications with reference to client recommended standards.

Preparing RIW for the area of inspection.

Maintaining quality control records in support of activities in area of responsibility.

Preparing inspection reports and updating daily activities at site.

To make sure approved material is being used.

Check and verify construction drawing and plans for its completeness and compliance with applicable specifications, codes and standards, and ensure that the material / equipment to be of use.

Supervision of manpower according to their task or assignment.

To Review and interpretation of engineering drawings and make sure latest drawings are implemented at site.

Witnessing and sentencing of all site inspections within their disciplines.

Coordinate all site inspections with the site client.

Ensure that all inspection reports are accurate and that all attached documents are of current status.

Review all inspection reports for compliance.

Preparing RFI for any system for a are required at site.

Setup fully restricted Filling system for all documentation.

Daily and Weekly progress report for easy evaluation of project status.

To close any NCR or SI if it has been issued by consultant for any unaccepted works.

To prepare all PLF and PHO prior to final handling over.

Preparing all the summary sheets and binder for close out. ACADEMIC DETAILS:

Sr. # Degree Awarded Major Subject Board/University Division 1

Bachelor of Engineering&

Technology (Hons)

Electrical Power University of Engineering &

Technology Lahore

Jan 2015

2

Bachelor of Engineering&

Technology (pass) Electrical Power

islamia university

bahawalpur jan 2012

3

Diploma of Associate

Engineer Electrical

Punjab Board of Technical

Education, April 2010

4 matric Science BISE Bahawalpur 2006

ADDITIONAL SKILLS:

• Electromechanical Execution

• QA/QC Electromechanical

• Project Engineering & Administration

Management skills of international health and safety & controlling workplace hazards

Ability to work in a Challenging environment.

Ready to Work in tough conditions.

Prepared to relocate in any part of the world.

Possessing good leadership and inter personal skills.

Self confident with positive outlook & professional attitude. Computer Knowledge:

Software Installation.

Well at computer knowledge of internet concepts.

MS Office Word & Excel.

Operation.

Sufficient.



Contact this candidate