SUMMARY OF QUALIFICATIONS
Graduated with a four-year Bachelor of Civil Engineering (Hons) degree from University of Peradeniya, Sri Lanka.
Excellent project management skills gained through work by managing projects at a tight schedule and gained knowledge related to construction engineering, transportation engineering and material engineering through work experience.
Well-developed problem solving and analytical skills gained through work and undergraduate career by providing immediate assistance during difficult situations.
Excellent team player by working in a team at all times during projects and worked collaboratively to complete the projects on time.
Outstanding knowledge in AutoCAD, MS Project, STAAD.Pro, Civil 3D, Revit and MS office and operating systems.
Solid knowledge of Operating Total station for Land and Engineering Surveying and calculating cut and fill volumes using Civil 3D and AutoCAD by Outputting job data.
Solid knowledge of QA/QC through working as the Quality Control Engineer in Training in a multi- story apartment construction project.
RELEVANT PROFESSIONSAL EXPEREINCE
Project Coordinator at Boomer Engineering(Pvt)Ltd, Sri Lanka July 2017 to August 2019
Maintained a project schedules, monitor project progress using MS Project and communicate with project managers and contractors and subcontractors to achieve the target.
Inspected buildings and landscaping renovations from start to end of construction period and check work is carried out according to the drawing, ensure safety standards and specifications are followed, and prepare final reports with photographs and update in the tracking excel sheet system.
Expanded knowledge in tendering and preparing specifications in detail by preparing tender documents for lobby, laundry room renovation, landscaping work, exterior and interior painting, fully window replacement, and asphalt pavement for parking lots.
Engaged and investigated City of Colombo orders and notice of violations which are received to properties and involve with contractors to find solutions, get building permits and follow the corrective actions.
Gained building system maintenance knowledge by inspecting heating and ventilation systems, sprinkler systems and domestic water distribution systems, fire detection and protection system, backflow preventers and Fire alarm monitoring.
Carried out inspections on concrete repairs, exterior and interior painting, asphalt pavements, curb constructions, landscaping, road construction, sidewalks and other tasks as required according to the building code and by laws.
Gained communication skill through attending site meeting with clients and contractors to discuss progress and construction issues and gain relationship with contractors and consultants.
Responded to emergencies and enquires, coordinate with contractors to resolve the issues quickly such as main domestic waterline blocks, heating boilers and domestic hot water boilers repairs. Project estimator at Boomer Engineering (PVT) LTD July 2016 –June 2017 Project: Proposed New Milk Factory for Milco (PVT) LTD Consultant: Desmi(Pvt)ltd Denmark
Client: Milco(Pvt)Ltd
Contract Value: USD 264 Million
Gained experience in both Civil & MEP disciplines while doing projects feasibility studies and cost forecasting
Preparation of Cost plans and Pre Tender Estimates and material reconciliations.
Prepared interim payment applications, cash flows and on site measurement and joint measure- ments of the Project.
Prepared cost analysis and claims for variations which were not in initial scope and due to changes made by client.
Attending site meetings and progress meetings weekly.
Prepared Sub-contractor’s evaluations and negotiations and payments. Civil Engineer at MAGA (Pvt) Ltd, Sri Lanka January2015 – July 2016 Project: Green NSBM Green University
Consultant: Engineering Consultant (Pvt) Limited
Client: National School of Business Management (NSBM)
Ensured that all equipment’s used for constructions are calibrated and are in proper working condition.
Used coordinate system to setting out buildings and main vertical columns using Total Station.
Experienced in optimizing cut and fill volumes in land site before construction of buildings using mapping contours in Civil3d by outputting the elevation data in coordinate system using Total station. And got experience in making decision on final landscaping and finish floor levels by consider all the legal criteria’s.
Gained experience in designing and laying of waste water pipe line system by considering existing elevation and minimum slopes to be maintained in various locations and drawing as built for the work performed.
Sound knowledge of PE pipe welding using Electro Fusion machine and tools which use to peel off the welding surface of the pipe just before the welding and gained experience in laying of fire and Supply water lines using PE pipes.
Prepared accurate detailed field notes, progress reports and extra work records
Supervised contractors for structural work, brick and masonry work, installing curtain wall, air conditioning systems and monitored unsafe working conditions in site, report to the supervisor
Monitored the construction materials and workmanship for compliance with industry quality standards
Gained knowledge in structural, architectural, mechanical, electrical and plumbing drawing and worked with staff to accomplish the work with corrective measurement
Experienced in preparing as-built drawings using Auto CAD of piles, pile caps, sewer lines, asphalt roads analyse and maintain survey data
Prepared Request for Inspection (RFI) and conducted inspection with the consultants according to inspection test plans
Ensured that all non-comforting products, work, and procedures are reported in the Non
Conformity Report(NCR), informed the quality managers about the issues, and ensured that the NCR was closed in a timely manner followed by corrective actions
Inspected and supervised all plumbing systems including cold and hot water supply systems, sewer & waste water systems
Reviewed quality plans provided by manufacturers, technical specifications and test reports and submit material approval sheet for the consultant approval.
Monitored labour activities, ensured health and safety procedures are followed and directed them to use personal protective equipment at all times
Monitored ‘Finishing Works’ including tiling, ceiling, masonry, plastering, and internal/external wall painting and installation of guard rail for balcony and stair cases, aluminium windows, doors, granite floor tilling and sanitary fitting
REFERENCES