OBJECTIVES
TECHNICAL To professional can knowledge, add grow organizational work value utilize & QUALITIES to to in skills work goals. fulfill contribute and a driven and firm the apply capacities where with and project my to a I
Good Drawing, Erection understanding and Planning Maintenance. of of Projects, Electrical
Both theoretical Electrical practical Instruments. knowledge as well as of Different
Working productively output comes. more so efficiently that maximum and
Regular Electrical Ratios and analyzing Load Analysis. Consumption of organizations with
Planning assignments goals Formulating strategic operations. within and plans time long to scheduling to achieve term/enhance parameters. short pre-set term
Proficiency Office in AUTO Cad, MS-
Desired Electrical Position: Engineer/ QC-Engineer/ QC-Inspector SS
CONCORD QC-Inspector: ELECTRICAL September, CONTRACTING 2017 up to EXPERIENCES Present LLC: Doha Metro Project, Qatar
Familiarization of Project BOQ.
Preparation of Method Statement with ITP
Submitting and Transmitting of Method Statement with ITP for Engineers Approval
Revising of Method Statement as per Engineers comments
Preparation of Material Approval Request
Material Submittal and Transmittal for Engineers approval
Internal Inspection of Incoming and outgoing materials from the warehouse
Consultant Preparation of Material Inspection Request to invite the Main Contractor Inspector and
Revision of rejected/ failed Material Inspection Request
Internal Cable Containment Inspection for materials the Installation of the first fix materials like Conduits, Boxes and all
Preparation drawings and of schedules Installation to Inspection invite the Main Request Contractor having all Inspector the reference and Consultant documents for like Inspection
Internal System Inspection for the Installation of Devices and Equipment for Telecom and Signaling
Preparation drawings and of schedules Installation to Inspection invite the Main Request Contractor having all Inspector the reference and Consultant documents for like Inspection
Internal Cable Testing (Megger, Continuity and Fluke LAN Test) for the laid cables
Preparation documents Consultant for like of Inspection Cable drawings Pulling and and schedules Testing to Inspection invite the Request Main Contractor having all Inspector the reference and
Internal Inspection for the termination of all cables related to its own device and equipment
Preparation drawings and of schedules Termination to invite Inspection the Main Request Contractor having Inspector all the reference and Consultant documents for Inspection like
Preparation Method drawings Statement, and of schedules Final ITP, Acceptance to Material invite Inspection the Approval Main Contractor Request, Request having Related Inspector all Inspection the and reference Consultant Request documents for per Inspection system, like
Receiving rectification Punchlist from the Main Contractor or Consultant and refer to Site team for
Closure of revised Final Acceptance Inspection Request GULF Electrical FARABI & Instrument PETROCHEMICAL Assistant INCORPORATION: Engineer: May, 2016 Jubail up to City May, Saudi 2017 Arabia
Familiarization of the drawings and to be clear what is my scope of the site.
technicians Take off and and estimate laborers of all needed the tool’s, at the materials construction especially site. the number of manpower
Safety orientation of all members at the construction site.
In kicks cable and tray etc. works, assigned one group for fabrication of all the tray bends’ offset,
straight Including position. fabrication of support for the tray especially in vertical and horizontal and
If with the the support exact has measurement been fabricated, according planning to the follows drawings. for the installation of support
Cable pulling of all the FCU Unit, AHU for Supply and instrument gadget supply.
Loop checking to assure of complete tagging and location.
Termination course according of instrument to the termination devices and schedule supply is including behind on to that. the MCC panel and of
Proceed to free commissioning the supply and control for instrument.
Then proceed to meggering cables.
Trouble shooting for the cables that did not acceptable for the inspection.
Prepare the documents need to submit for inspection.
Signature for all the documents need to submit for inspection.
Double check the document to avoid errors or mistake for the request for inspection
(RFI)
When done, I can request to my Engineer for inspection and testing. VOLTAGE Manila, Electrical Electrical Philippines & QA ELECTRICAL Instrument / QC Engineer: CONTRACTOR Project April, In Charge 2015 CORPORATION: up (PIC)to October, : October, # 2015 5 2015 Saint up Catherine to May, 2016 Taguig Metro
and To coordinate equipment with location client layout representative for the site regarding installation approve inspection actual purposes. layout drawing for all system
Responsible for the daily, weekly and monthly report for all Electrical activities.
Prepared Material take-off and cost estimation for the project.
the Prepared week. construction schedule and manpower scheduling for the team to be accomplished for
Monitoring and inspection for every various phase of work.
Supervision and inspection activities for electrical scope of work.
Preparation request) with for status the inspection to be submitted report and comment sign by for the all Project the inspected Manager WIR (work inspection
Prepared test report and accomplishment status report of the project.
AYIN Cadet Prepared once CONTRACTOR the Electrical area Red Line was Site totally Marking Engineer: AND TRADING completed. for March the actual CORPORATION: 2014 site up installation to May New 2014 for Port As-City Built Manila drawings Philippines to be submitted
Submit & making daily report to the Project Manager every end of the day
Site monitoring for all working activities twice a day
Deploying the works to the project in charge as per advice of Project Engr.
Distributing the approved drawing that the team needed at site
Coordinates scope to the project in-charge regarding the completed work depend upon the priority
Attending staff from the the coordination contractor & subcontractor meeting once a week together with the corresponding personnel or
Coordinates copy two system for the and contraction to the to finalized another reference. discipline the solution regarding with the the red clashing line mark issue up for on the the routing drawing between as advance the Electrical NAPOCOR-Supervisor BOAC DIESEL (Casual)POWER : April PLANT: 2013 up Bantad to Nov. Boac, 2013 Marinduque Philippines
Working equipment as and an electrical instrument site devices supervisor monitoring through activities. supervision for all the electrical
instrument Site monitoring devices every @ 1hour site. interval for all the electrical equipment including the
Computer instrument System devices encoding based on for the the observation actual status report for all at the site electrical equipment and
Daily submitted report every preparation end of the for the day status to the for electrical all the site equipment engineer and instrument devices to be
are Attending the actual coordination status and meeting condition scope for all every equipment first day and of the instrument week to comprehend devices @ site. what Electrical NAPOCOR-(OJT) Maintaining On the & POWER Instrument Job Training the BARGE cleanliness Trainee: 120: Balanacan From & safety March rules Mogpog, 2012 and up regulation Marinduque to May 2012 at all Philippines times.
Working the electrical as an equipment electrical & and instrument instrument site devices trainee installed through at monitoring/site. supervision for all
Attending procedure tool of safety box talk rules every and morning site regulation to avoid accident and to maintain the correct
Coordinating need to replace for or all to site repair. technician regarding the equipment and instrument that they
Making on my site the monitoring report for the to be equipment submitted and to the instrument engineer. that have damage or defective base
Encoding excel file into the number the site computer and type of monitoring the equipment equipment. and instrument into the system using EDUCATIONAL TERTIARY: Tanza, SECONDARY: PERSONAL School (PRIMARY: School (2005-1999-Age: 2009) 2005) Boac, in in Bangbang,Bangbang,Marinduque Marinduque Bangbang Bangbang DATA Gasan,Gasan,BACKGROUND 26 Elementary National (years State 2009-Marinduque Marinduque College old 2015) High Height: Weight: Birthday: Civil Gender: Citizenship: Father’s Mother’s Semilla(Religion: Status: +Name: ) Name: Roman Married 5’6” 154 February Male Filipino Adora Arnel lbs Semilla Catholic Sumo 17, 1993 Passport Passport 2020 Expiration number: Date: EC5776210 Oct. 22, CHARACTER Dialect English Registered (REE) 0058683 I and can Electrical Filipino speak REFERENCE & Engineer write: no.: Site (Contact EHAF Electrical Consulting Mr. number: Euclid & Instrument (Sumo 974-Engineers) 55435753) Engineer Doha Qatar Sr. Metro Concord Mobile QA/ Rail QC Mr. number: Electrical Engineer Project Julius +Quitara 974-Singapore 3108-1246 Junior Mitsubishi-Technical 27F Pioneer Mobile Robinsons Electrical Engr. number: St.Services, Hitachi Mandaluyong John Cybergate Design +63-Robert Corporation Power 917-Engineer Leynes Systems 304-Center City 3851 Town 3, information best Registered of I my Mr. hereby knowledge Arjay is Electrical true Applicant certify Sumo and and that Engineer correct Semilla belief. the above to (REE) the