Post Job Free
Sign in

Electrical Engineer

Location:
Chennai, Tamil Nadu, India
Posted:
September 09, 2019

Contact this candidate

Resume:

Abishek Kalyanaraman

#**, ****#*, ******* *****, 47th Street, 9th Avenue, Ashok Nagar, Chennai-600083 996-***-**** **************@*****.***

Objective A ability background. dynamic to analyze, graduate Competent synthesize seeking engineer opportunities and design of the electrical engineering within world the systems electrical and an garnered and efficient energy by disseminator means sector. of I would strong of the like educational acquired to harness expertise my to the Systems. industry. My primary focus areas are Renewable Energy, Transmission and Distribution Systems and Power Education

Masters Degree in Electrical Engineering March 2015 - November 2017 Royal Melbourne Institute · · Postgraduate Major: Conversion, Minor: Renewable Switched of Technology Advanced Certificate Mode Electrical Control Power (RMIT)in Energy Engineering Supplies, System,, Melbourne, Systems, Power Real Time Protection August System Australia Estimation Analysis 2014 and High and Auckland and Control Voltage Control Engineering, University Electrical of Technology, Energy Auckland, · · Bachelor’s Major: Minor: Electrical Specialist New Degree Zealand Power Readings in Electrical Systems (Integrated Engineering Analysis) Sep, Advanced 2009 – April Control 2013 Systems, SRM Digital Easwari Signal Engineering Processing College · · Major: Transmission Minor: Power Signals Chennai Plant and and Distribution Systems, Engineering, Power High Electronics Voltage Engineering, Power System Analysis, Protection and Switchgear, Relevant Work Experience

Intern · · · Student · · · Intern · · · Devised Created Assisted Resolved Worked Planned Worked Developed Designed Inesh Inesh Engineer 3G a on on periodical in electrical and system a developing modems design research, highly developed Smart Smart to Trainee calculations maintenance faults secured monitor to design Energy Energy a enable software variants in CNC smart and wind Asahi communications Pvt. Pvt. including machines development for including to incorporated energy Ltd Ltd machines, monitor India short Oct July produced 1 Glass the ɸ 2017 of 2013 updated circuit, between and with Smart data Pvt. 3 at – ipv6 – ɸ using AC/Dec a December Ltd Energy daily direct wind energy technology DC, 2017 Java check Aug center Earthing/connected Meters meters coding 2014 sheets Chennai 2013 remotely platform and Shielding – and and Sep Chennai control wire to breakdown 2014 prevent operated centers Chennai energy graph theft Projects

Transient · · · Automation · · · Knee · · · Multimedia · · Real · · · Enhanced loads Designed Achieved Developed Enabled Incorporated Designed Health SOS Imported Design Developed Assembled couplers Overcame Time Replacement function in and and parallel multi and desired a knee Stability signals Implementation the oscillations a a recovery load a implemented Processing of discrete photo-PV was a a transient mode transformer Festo angle fully controller cell with from induced results voltaic Enhancement Post-rated functional operation tracking monitoring control the Handling in multimedia stability MPPT with Project existing a 100W, Operation to system to proper to alert system improve achieved of a generate by Human in reduction of Solar system maximum Station loads PV programming others to digital files, Kundur’s April for ensure of cells oscillations Monitoring Machine by Energy 86 3 visualized a using when filter ɸ virtual amalgamating of 2014 by W March Power real System transient 2-adding output recovery Area to patient Interface for the time industrial remove damping the Point 2016 multi control Residential System a power change time imported Feb is and Android Tracker in (the machine – HMI) up sorting distress by 2017 system location June supply embedded in to controlling March into signal PV 15%(App 2016 Purposes MPPT) – system station using current combined for Nov the tracking, with in verified 2015 general project noise time 2017 Control charger the implemented Bio-as – – transient and with a and using Jan KnE Electronic Nov needs third Ladder circuit, frequency improve location – Tracker 2015 MATLAB Apr test in swing by event Diagram boost in tracker 2013 adding quality tracking flowchart domain of converters, power and the of signals Algorithm additional failure opto- Skills & Abilities

SOFTWARE LEADERSHIP COMMUNICATION SALES Knowledge I a schedules, During students My skills, led team part a taught team of my time and three setting in tenure of me experience & faculty MATLAB/four during MANAGEMENT to and abroad, during employ has meeting project SIMULINK, greatly from pursuing my professionalism, project Dominos on goals impacted ‘Wind PLC masters, and on (as Energy Siemens ‘real decision my Manager diplomacy exposure verbal time Theft and making. implementation in and Control’. Alen Operations, to and written presenting Bradley)people These communication coupled skills., of Homer projects projects solar with energy Energy, and helped my skills. interacting for sublime Dig me residential SILENT, work communication with on PCS, creating purposes’ fellow and C, C+and +



Contact this candidate