Post Job Free
Sign in

drilling & directional drilling

Location:
Onesti, Bacau, Romania
Posted:
September 10, 2019

Contact this candidate

Resume:

Personal Information :

Full name : Adrian Suman

Address : Libertatii nr.112 street Onesti city, Bacau district, postal code: 601055 Date of bird : 04.01.1964

Marital status : Married, two children

Nationality : Romanian

License driving : yes

Criminal recorder : without

Education : High School Onesti(1978-1982) type of degree : Mechanic

: Petroleum and Gas University(1992-1997)type of degree : Field Drilling Engineer Training Well Control : IPG Ploiesti(2006)

Managing Wellsite Operations : PetroSkills(2006)

Lost Circulation Technology : MI Swaco(2006)

I.W.C.F.-Surface BOP Stuck : Drilling Supervisor Certificate(2006) Directional Drilling Spec1D : SLC,Sugar Land_USA(2007) ADS-Advanced Drilling : SLC,Sugar Land_USA(2008)

Directional Drilling Spec2D : SLC,Sugar Land_USA(2009) Offshore Survival with HUET : Pavia,Italy (2010)

HDD Guidance Engineer : June 2012

I.W.C.F. : Drilling Supervisor Certificate(2013)

Offshore Survival with HUET : OPITO at CERONAV(14.Dec-2018) Oil & Gas UK Medical certificate : 10.01.2021

Personal Activity / Responsibilities :

Febr.2019-Present : DD Consultant – SLB Europe

Febr.2019 : DD Consultant - Weatherford Kuwait

Feb.2016-Aug.2017 : Freelancer

Sept.2013 – Jan.2016 : DD Supervisor(employee) - BHI Kuwait February 2012 – Sept. 2013 : DDS Consultant - BHI_Kuwait onshore DDS Consultant - SLB Indonesia_ Tender barge

HDD Guidance Engineer - Prime Horizontal Ltd.-Holand Rig Manager - Hassi Messaoud_Algeria

July 2007 – January 2012 : Schlumberger at Drilling & Measurement Division Specialist Directional Driller - DD3

Projects : All Romanian fields (Petrom group OMV) Onshore & Offshore (Jack-up) Germany - Wintershall:2 projects

Hungary - ExxonMobile

Ukraina - Tiway : 12 ” & 8 ” section,rig #809 Weatherford Kuwait Energy : 8 ” section,rig #808 Weatherford

Regal Petroleum : 12 1/4” & 8 ” section,rig #5914 Saipem) Cadogan Petroleum PLC & Saipem drilling contractor : PPAK A9625640 XP motor job : 17 ” section from 545m to 2623m with KO point from vertical at 1300m,build 1 deg./30m till 19.64 deg. at 1889m,drop to vertical at 2478m with same average dogleg and keep vertical to TD section at 2623m(13 3/8’ cassing);12 ” Section Vertical from 2623m to 3973m(95/8” casing); 8 ” Section vertical from 3973m to 5323m( 7” linner) Bulgaria(JKX Bulkan Ltd & Weatherford drilling contractor : 8 section, “S” well) Turkye(T.P.A.O. : Bati Raman402 with 12 ” & 8 “section at 83 deg. and intersect offset vertical well with RMRS system, Caylarbasi-9A with 16” & 12 1\4” section and intersect first vertical well,cement plug and continued for second intersection,but stoped due to mud losses) 2007 – July : Gulf Drilling International(Qatar) – Tollpusher(Rig manager) Duties / direct charge : Supervise the execution of drilling, Optimization of drilling parameters, Checking for security rules and B.O.P. regulation, Dismounting–Transport–Mounting drilling rig, General monitoring for the drilling operations.

Drilling a horizontal wells in the upper Arab C reservoir(11500 ft MD & 6337.5 ft TVD) with Baker Hughes

(directional drilling) and MWD&LWD by Schlumberger. Rig - National Oilwell with Top Drive technology

2006-2007 : Petrom group OMV – Drilling Supervisor Duties / direct charge :

-Responsible for the day-to-day site planning and execution of drilling activities,maintaining maximum HSE and operational efficiency, at maximum value in terms of cost versus benefits

- Supervise the drilling contractors and service personnel to ensure all work performed conform to safety, quality and highest value requirement and in accordance the well program

- Ensuring full compliance with Health, Safety and Environmental(HSE) policy standards and objectives, delivering high quality and cost-effective wells according to approved well programs 2005-2006 : Foserco - Assistant Rig Manager in Republic of Kazakhstan(KasMunay Gas) Duties / direct charge : Supervise the execution of drilling, Optimization of drilling parameters, Prepares and delivers daily drilling operation report including various drilling parameters, material supply and consumption, costs, and other associated information,General monitoring for the drilling rig regarding drilling parameter, Management of the drilling crew

2001- 2005: S.C.Rafo S.A. - Borzesti - Petroleum Engineer Duties / direct charge : Offer specialized assistance to the operational personal in realizing the fabrication program, Verify and account for the modification of the technological parameters, Coordinate, Supervise and make decision for the reduction of energy and raw material,Supervise the technological program and fulfilling of production tacks in accordance with the established production schedule 1997 – 2001: Foserco S.A. TG.Ocna – Rig manager

Duties / direct in charge : Checking for all drilling operations, Optimization of drilling parameters, Checking for security rules and B.O.P. regulation, Ensures that all activities are carried out in accordance with the Company's safety policies and procedures,Assuring permanent control and communications with head quarter regarding : technical program, general monitoring, dynamic of drilling, daily reports, Direct responsibilities for the special operations :casing,cementing jobs, fishing jobs, bring in a well, Management of the drilling crew. Water borehole drilling for domestic and industrial water supply till 800m deep.



Contact this candidate