... 145,000 manhour Primavera P6 8.2 craft resource loaded heat trace schedule which contains level of effort and logic-driven refinery construction activities with peak manpower of 120 field workers Built/maintained/updated a 1,000+ detailed activity/3 ...
- Apr 25
Columbus, OH
... in warehouse and maintained storage layouts Maintained tanks as Tank Mechanic September 2010 – December 2012, Domino Sugar Refinery, Chalmette, LA Forklift Driver Loaded and unloaded refined sugar orders from the truck and placed it properly in ...
- Feb 24
Columbus, OH
... 1988 to March 1995 MOVE DRILLING EQUIPMENT- RIGS- DOZERS Steam Turbine Apprentice TAMPA ELECTRIC July 1982 to March 1987 REPAIR STEAM TURBINES, VALVES, GAS TURBINES, GENERATORS, HP-LP STEAM TURBINE REPAIR WOKED AS A HELPER ON THE TRAVELING CREW. ...
- 2024 Sep 25
Columbus, OH
... power plants, refineries & nuclear plants Heavy rigging Numerous projects for the Oil and Gas Industry, located at the BP Refinery - Toledo, OH The Husky Refinery - Lima, OH Columbia Natural Gas Company east of Mansfield OH The Valdez, Alaska Marine ...
- 2024 Jul 17
Dublin, OH
... ●Improved product profitability analysis for services $500M gas turbine engine manufacturer by identifying cost drivers, walking though shop floor, correcting accounting errors that impacted supply chain. ●Implemented ASC 842 technology solutions ...
- 2024 Mar 10
Columbus, OH
... Citrus Heights, Ca 95621 Independent Engineering Consultant for: Industrial Burner, boilers, and steam turbine • I performed sales and marketing for industrial burners, industrial boilers up to 131 bars and steam turbines for power plants up to 40 ...
- 2023 Dec 10
Columbus, OH
... • Site Safety Manager 2015 SCE&G Fall Outage, Urquhart Plant Unit 1 Turbine shell and piping replacement. • System Safety Manager 2016 TECO Plants Tampa Area: Coal-fired Power Plant Maintenance. • Site Safety Manager 2021 INEOS Battleground ...
- 2023 Aug 20
Columbus, OH
... a whole new customer segment • Gap Inc Automated Storage and Retrieval system (ASRS), reducing labor costs by 5% • Gap Inc Two Popup DCs, enabling 150K+ additional units of inventory direct-shipped daily • Grew Gap account from 2 consultants to 40 ...
- 2023 Apr 07
Dublin, OH
... October 2000 to October 2002 Chennai, Tamilnadu, India As GE's Compressor Technology Drafting team leader at TATA Global Engineering Development Center (TCS-GEDC), executed mechanical engineering design projects for GE's Gas Turbine business. ...
- 2023 Mar 21
Columbus, OH
... Support DCS project for F-2 in the PROVOX system for the implementation of expansion and the 2000 efforts. Those activities ... DI water), Steam generation with boilers and a turbine with a cogeneration system and the electric distribution system. ...
- 2023 Mar 21