RESUME
Name: Londhe Sachin Haridas
Mobile: +91-898*******, +917*********
E-mail: ada6ec@r.postjobfree.com
OBJECTIVE
To gain employment with a company that offers me a consistently positive atmosphere to learn new technologies and implement them for the betterment of the business. EDUCATIONAL QUALIFICATION
EDUCATION
DETAILS
YEAR OF
PASSING
COLLEGE/
SCHOOL
UNIVERSITY/
BOARD
PERCENTAGE
MARKS
B.E. 2012-2013 JJM, Jaysingpur
Shivaji
University,
Kolhapur
69.50%
H.S.C. 2007-2008
DBF Dayanand
College, Solapur Pune 66.33%
S.S.C 2005-2006
SNV, Uplai BK,
Solapur Pune 75.46%
CURRICULUM PROJECTS
● Carbon Fiber Reinforced Concrete (CFRC).
● Latest Formwork Type: MIVAN Formwork.
INDUSTRIAL TRAINING
● Completed 25 days training in M/S. Tingre Construction in Ariyana site, Karadi, Pune. WORK EXPERIENCE
1. B. G. Shirke Construction & Technology PVT. LTD. (Delhi) – [From 10 SEP. 2013 to 31 JULY 2018]
Project Name - MIG, LIG & EWS Houses BY using pre-fab technology (having structural RCC members i.e columns, beams & slabs all precast) in NARELA & Rohini DELHI.
(A Turnkey Project)
Project Cost – 1394 Crores & 6400 Crores.
2. JMC Projects India LTD., Thane (1 Agust 2018 to 3 August 2019) Project Name-Immansa Project, Kalptaru Group, Thane(W) Key Skills –
a. Site Engineer Work –
● Mobilization Work of Site WBM road, electric sub- station, site fencing, TBM shifting, labour colony, store & office work handle. Also that time plate load test & piling test conducted for soil bearing capacity checking for raft foundation.
● In Precast Shear Wall,Column & Slab factory installation time batching plant foundation, Factory foundation, track plate and roller fixing, vibration station foundation, lifting station foundation etc activities carried out.
● Lineout for Excavation of buildings.
● Lineout for PCC and Positioning of PCC & Raft as per Drawing.
● Steel Checking & Concreting work carried foundation to end of building work.
● Maintaining Daily Assessment Report.
● Work out BBS of LIG & EWS building.
● Executing all works regarding LIG/EWS Building i.e. Raft foundation, Erection work, Concerte work, Block work, Internal and External plaster, flooring activities, waterproofing work, Aluminum window, Door frame & shutter, internal & external painting work, etc
● To watch and inspect the Construction work and assure that it is done in full accordance with the Drawings, Technical Specifications and Bills of Quantities.
● Inspecting and Testing Materials prior to their use at site as per Sample approved by the Consultant and ensuring removal of rejected material out from site.
● Planning & Monitoring All Structural & Finishing Activities Like Shuttering, Concreting, Steel, Scaffolding, Brickwork, Plaster, Flooring, Cladding& Other Works.
● Working out of Standard Quantities as per drawings & Specifications.
● Checking contractors Bills at various stages of works.
● Checking of Layout and Setting out of Building/Structure w.r.t Existing Structures and site levels.
● Ensuring the correct implementation of the works according to Technical Specifications, to Designs and Quality of materials.
● Preparing list of Tests that may be required and following these Tests to be carried out at site, keeping a Log of all Tests conducted at site.
● Coordination with all concerned Departments for smooth & timely Execution of Contract.
● Calculation and Planning of Resources requirement to achieve the Aimed Production Rate.
● Scheduling of Manpower, Material, and Equipment & Activities for actual daily needs on site.
● Preparation of Daily Production, Inventory and Pending order status.
● Maintaining a filing system for all Site Memos and Instructions, measured quantities of work and material on site, Reports and other Documents and correspondence pertaining to the construction activities.
● Ensuring that Health and Safety measures are adopted and followed to the full extent. I hereby declare that the above written particulars are true to the best of my knowledge and belief. Place: Signature
Date: (Mr.Sachin Haridas Londhe)