Post Job Free

Resume

Sign in

Engineer Construction

Location:
Rawdat Al Khail, Qatar
Posted:
December 27, 2019

Contact this candidate

Resume:

PROFESSIONAL RESUME

VIJAYAN PUTHUMANAKUZHI KRISHNAN

Construction Engineer / Supervisor.

Email: - ada5i2@r.postjobfree.com Telephone: 00974 4407 -2950 - Mob: 00974 -55071181 Email for Communication: ada5i2@r.postjobfree.com Telephone: - 009**-******** / 009**-******** DETAILED RESUME

Page 1 of 6

PROFILE

To utilize my professional skills and experience, to achieve success in contributing towards the corporate objective of a progressive company that offers professional growth, while being resourceful and flexible, I believe to take responsibility to get a job in multifunctional business management, and diligence is my forte.

I am a professional with 32 years of rich experience in supervision of construction work related to Oil& Gas and Petro-chemical projects in Green field and Brown field including Shutdown work. The major Experience in Rotating, Static and Package Equipment’s construction work, Piping Installation, Steel structure Installation and related civil work. Also, have experience in Rotating Equipment Pre- commissioning and Commissioning work including Inspection of Rotating equipment’s construction work.

SUMMARY

More than 32 years of field experience, having enormous knowledge in Mechanical Engineering. In addition to this, enriched experience from field construction work supervision, coordination and Inspection. The major projects are RasGas EPCM project (Qatar Gas South), RasGas LNG onshore construction projects (with CMS&A and CTJV- Train# 4, Train#5, AKG-1, AKG-2, NGL-4, NGL-5, Train#6 & Train# 7). Also, have experience in many other LNG projects outside Qatar. LNG Project in Egypt (JGC-KBR Group), MLNG Tiga Project in Malaysia (JGC-KBR Group), OLNG Project in Oman (Chiyoda-Foster Wheeler-CFW), EQUATE Petro-chemical project in Kuwait with Word service Italia, Chiyoda LNG Project in Das island-UAE,OGD Project in Habshan-UAE, OAG Project Das island-UAE with TECHNIP France. Strong Technical Knowledge that ensure enhanced production. Ability to read drawings quickly and set up job systematically. Seasoned leader who is capable to command and control the employees, to ensure a safe production and professionalism in work. Hands-on experience in analyzing critical/risky job for possible hazards, in order to monitor every activity of employees to ensure compliance with the required safety precautions and provide a safe work culture by preventing accidents, incidents, injuries and damages. WORK EXPERIENCE

Current Employment

From : July 2010 to till date

Company : CHIYODA ALMANA ENGINEERING LLC

Position : Senior Construction Engineer.

Project/s Involved. : RG LT-EPCM (several Brownfield Projects) Qatar Gas South. Major Projects (RFS) :

Major Brownfield Projects:- SRU Enhancement projects, DLN Projects in several assets.QP Condensate Supply Project, LNG Truck loading project and MEG Storage Tank project.

Major Shutdown Projects:- Compressor Rotor Replacement Projects(56-K004,46- K004,AKG-1 Turbine Tube Replacement projects), BAHX Replacement projects( 665- E001& 55-E007), Hot oil furnace burner replacement project( 197-F091),53-E002 Heater replacement project, 30’’ & 6’’ Isolation of By-pass line projects( 665/775- E003&E002),Sales gas back-up Tie-in projects(Train6& 7) etc. PROFESSIONAL RESUME

VIJAYAN PUTHUMANAKUZHI KRISHNAN

Construction Engineer / Supervisor.

Email: - ada5i2@r.postjobfree.com Telephone: 00974 4407 -2950 - Mob: 00974 -55071181 Email for Communication: ada5i2@r.postjobfree.com Telephone: - 009**-******** / 009**-******** DETAILED RESUME

Page 2 of 6

Major Projects Related Early work support:- Supervision of Barzan Pipeline project site survey, Topography, Soil investigation including TSF & Area preparation for EPC and Road works support including e-CPW handling.

NFE FEED Support: - Supervision of site survey, Topography, Soil investigation INCLUDING Bore hole and sample collection. Also, work as e-CPW performing authority. Other general early works are setting of camp, Generator house and other required facilities like preparation of laydown etc.

Duties and Responsibilities: Initial Stage

Engineering Support for feasibility study feed and detailed Engineering with field related activities.

Preparation of constructability review report

Preliminary Rigging study report preparation

Detail schedule preparation and review( Level-3 to Level-6)

Preparation of RFQ (Request for Quotation), Bid evaluation, assessment and related communications.

Resource assessment, Construction readiness review.

Coordination and communication with all stakeholders.

Subcontractors queries clarification

Method statement, Job Safety Analysis, rigging plan, review and approval

Material approval

Organize and attend Meetings.

Duties and Responsibilities: Execution Phase

Monitoring and supervision of all sub-contractor’s project site activities

Monitor the safety & quality requirements related to the projects.

Lead the safety initiative and continuous monitoring on the strict compliance of standards and procedures.

Monitor daily progress against the schedule.

Monitoring all Tie- in and Hot tap activities

Coordination with all other departments like Project, Engineering, Procurements, Safety& QA-QC team.

Coordination with all discipline supervisors and evaluate the site progress in daily basis

Coordination with Clients, Subcontractors and vendors.

Attend weekly progress meeting.

Monitoring all pre-commissioning and commissioning activities

Supervision of Piping and Equipment work related to the project.

Supervision of Rotating equipment installation, alignment, pre-commissioning and commissioning work including Inspection.

Monitor Steel structure work including civil work.

Coordinate with E&I team and ensure required support to complete the project within the schedule.

Evaluation of project progress & payments.

PROFESSIONAL RESUME

VIJAYAN PUTHUMANAKUZHI KRISHNAN

Construction Engineer / Supervisor.

Email: - ada5i2@r.postjobfree.com Telephone: 00974 4407 -2950 - Mob: 00974 -55071181 Email for Communication: ada5i2@r.postjobfree.com Telephone: - 009**-******** / 009**-******** DETAILED RESUME

Page 3 of 6

Supervision of all pre-shut down, shut down, and post shutdown activities with high standard of safety and quality

Monitor the Shutdown progress and complete all activities on or before targeted schedule.

MAC/PSSR & Punch close out

Duties and Responsibilities: Project Close out Stage

De-mobilization of project related resources and area re-instatement.

Red mark-up submission & As-built drawing review.

Support final dossier submission

TSF removal & Re-instatement.

Previous Employment

Project : OAG-1 Project Das Island-

From : March 2010 to June 2010

Company : Technip-France

Position : Mechanical Engineer

Duties and Responsibilities:

Supervision of Rotating and static Equipment commissioning

Installation of Vessel& Column internal work

Lube oil flushing

Monitor Pump and Compressor Rotor setting, Balancing, installation, Alignment, Inspection and start-up.

Project : Ras Laffan Onshore Expansion Project (RASGAS - Train# 6, Train#7 & AKG-2) From : April 2007 to December 2009

Company : Chiyoda Technip Joint Venture

Position : Rotating Equipment Supervisor

Major Works : GE Oil & GAS, Gas Turbine Drive compressors, Steam Drive compressors, Pumps, Air Fin coolers, Companders Construction, Pre-commissioning and commissioning works including related Steel structure, Piping and Civil work

Duties and Responsibilities:

Supervision of Frame# 9, 6, 5 GE Gas turbine and Compressor construction work, Steam turbine compressor construction work, Motor drive pumps construction work, Compandors Construction work, Air fin cooler work.

Supervision of Foundation preparation based on Rotating Equipment’s foundation drawing

Monitor Equipment erection

Supervision of Levelling, Alignment, Inspection, Grouting.

Supervision of all installation work including filter house and air inlet system

Supervision of Exhaust stack and duct work constriction& alignment

Monitor the installation of Fuel gas skid and line installation

Monitor Lube oil system pump and skid installation including Lube oil flushing. PROFESSIONAL RESUME

VIJAYAN PUTHUMANAKUZHI KRISHNAN

Construction Engineer / Supervisor.

Email: - ada5i2@r.postjobfree.com Telephone: 00974 4407 -2950 - Mob: 00974 -55071181 Email for Communication: ada5i2@r.postjobfree.com Telephone: - 009**-******** / 009**-******** DETAILED RESUME

Page 4 of 6

Installation of firefighting system including CO2 skid & Line work

Monitor all cooling system piping steel structure and civil work related to the turbine and auxiliary skids.

Monitor all pre-commissioning work including function test of all systems with the support other disciplines.

Project : Ras Laffan Onshore Expansion Projects (RASGAS-Train#4,Train#5,AKG-1,NGL4 & 5) From : November 2004 to March 2007

Company : Chiyoda-Snamprogetti & Co (CMS&A).

Position : Rotating Equipment Supervisor

Major Works : GE Gas turbine drive compressors, Pumps Air fin coolers Construction, Inspection Pre-commissioning and Commissioning works Duties and Responsibilities:

Supervision and inspection of all types of rotating equipment related to LNG Construction.

Supervision and inspection of Motor & Gas turbine drive compressors erection and alignment.

Supervision and inspection of Motor drive pumps erection and alignment.

Supervision and inspection of vendor supplied pipe installation, hydro-test, and chemical cleaning and lube oil flushing procedure preparation and lube oil flushing activities.

Supervision and inspection of vendor supplied platform and structure installation and alignment.

Supervising equipment grouting and preservation work.

Preparing the final As-Built Drawings.

Enforce Project Safety and Quality Procedures, rules and regulations and ensure the use of only safety and Quality working methods.

Supervision and inspection of Air fin cooler erection and alignment, pre-commissioning and commissioning activities.

Supervision and inspection of Motor solo run along with Electrical Group.

Supervision and inspection of all rotating equipment pre-commissioning and commissioning activities.

Installation and Commissioning of EOT cranes.

Project : SEGAS (JGC-KBR-LNG project Demaitta-Egypt) From : October 2003 to October 2004

Company : Dodsal PTE Ltd.

Position : Equipment Engineer

Major Works : All types of Rotating Equipment’s, Static Equipment and Package Equipment’s Construction, Pre-Commissioning and commissioning works. Duties and Responsibilities:

Supervision and coordination to other discipline and vendor representatives.

Supervision of Turbine drives (GE frame #7) compressor (NP C3&MR) construction, pre-commissioning, and commissioning activities.

Supervision of motor drive compressor, pump erection, alignment, oil flushing and commissioning activities.

Supervision of air fin cooler construction and commissioning activities.

Supervision of static equipment erection, alignment, grouting, tray installation work and PROFESSIONAL RESUME

VIJAYAN PUTHUMANAKUZHI KRISHNAN

Construction Engineer / Supervisor.

Email: - ada5i2@r.postjobfree.com Telephone: 00974 4407 -2950 - Mob: 00974 -55071181 Email for Communication: ada5i2@r.postjobfree.com Telephone: - 009**-******** / 009**-******** DETAILED RESUME

Page 5 of 6

chemical filling.

Supervision of BOG compressor (Reciprocating) liner, piston installation work.

Supervising the construction activities of boiler, heat exchanger & incinerators.

Implementing the all safety practices, procedures and correct unsafe work practices.

Project : MLNG Tiga Project(JGC-KBR), Bintulu, Malaysia From : May 2001 to June 2003

Company : Dotanah Engineering and Construction Sdn. Bhd. Position : Equipment Engineer

Major Works : All types of Rotating Equipment’s, Static Equipment and Package Equipment’s Construction, Pre-Commissioning and commissioning works. Duties and Responsibilities:

Ensure Equipment installation works complied as per project specification, drawings, method of statement and quality assurance.

Responsible to coordinate with client, vendor for the equipment construction and inspection activities.

Responsible for (Train 7 & Train 8 LNG) Plant all rotating & static equipment installation, alignment, vendor pipe installation, testing, lube oil flushing and pre-commissioning activities.

Major equipment work includes turbine drive (frame 7 GE) NP Compressor, motor drive compressor and pumps, air fin cooler assembly, erection, alignment work, vessel, heat exchanger, column, erection, alignment grouting, internal tray work, platform installation, etc.

Project : NGL Project (Hyundai), Dhukhan Qatar

From : September 2000 to March 2001

Company : Mecon

Position : Supervisor

Major Works : Rotating Equipment’s erection works, Rotating Equipment’s and static equipment’s work related to shutdown works.

Duties and Responsibilities:

Supervision of shut down activities.

Supervision of rotating equipment construction activities.

Project : Oman LNG (Train1 & 2), Sur-OMAN

From : June 1998 to April 2000

Company : Chiyoda Foster Wheeler Co. (CFW)

Position : Rotating Equipment Supervisor

Major Works : GE Gas turbine drive compressors, Pumps Air fin coolers Construction, Inspection Pre-commissioning and Commissioning works Duties and Responsibilities:

Supervision and coordination to other discipline and vendor representatives.

Supervision of Turbine drives (GE frame #7) compressor (NP C3&MR) construction, pre-commissioning, and commissioning activities.

Supervision of motor drive compressor, pump erection, alignment, oil flushing and commissioning activities.

Supervision of air fin cooler construction and commissioning activities.

Supervision of static equipment erection, alignment, grouting, tray installation work and chemical filling.

Supervision of BOG compressor-(Reciprocating) liner, piston installation work. PROFESSIONAL RESUME

VIJAYAN PUTHUMANAKUZHI KRISHNAN

Construction Engineer / Supervisor.

Email: - ada5i2@r.postjobfree.com Telephone: 00974 4407 -2950 - Mob: 00974 -55071181 Email for Communication: ada5i2@r.postjobfree.com Telephone: - 009**-******** / 009**-******** DETAILED RESUME

Page 6 of 6

Supervising the construction activities of boiler, heat exchanger & incinerators.

Implementing the all safety practices, procedures and correct unsafe work practices.

Project : World Service Italia (Ethylene Glycol Project) From : August 1996 to September 1997

Company : Al-Bahar Jaccorossi

Position : Mechanical Foreman (Construction)

Duties and Responsibilities:

Supervision of static and rotating equipment erection, alignment work. It includes reactors, heat exchangers, vessel, column and its internal tray works.

Project: ADNOC OGD project-Habshan & ADGAS LNG Project Das Island, Abu Dhabi, UAE. From : April 1993 to December 1995

Company : CCIC

Position : Equipment Foreman

Project : TISCO-Bihar, Ajax Engineering & IPA Bangalore (All in India). From : December 1986 to November 1992

Position : Service Engineer and Supervisor

Duties and Responsibilities:

Equipment installation, alignment, trouble shooting, maintenance and commissioning activities in all over India.

EDUCATION / QUALIFICATION

Diploma in Mechanical Engineering –Board of Technical Education, Kerala.

PUC- Kerala University.

Date of Birth: - 26/05/1963.

SOFTWARE EXPERIENCE

MS DOS, MS-Word, Excel, MS-Power Point

OTHER INFORMATION

Languages Known: English, Hindi and Malayalam



Contact this candidate