GREGORIO
G. MANZO
BS ARCHITECTURE
Post Box 690, Postal Code 322
Sohar, Sultanate of Oman
c/o Edwin G. Manzo
ada41v@r.postjobfree.com
ada41v@r.postjobfree.com
ABOUT ME: WORK EXPERIENCE ( Summary of Job Descriptions on page- 4 ) Studied Bachelor of Science in
Architecture at the
Technological Institute of the
Philippines, Manila. With
professional experience in
field of Architecture & Interior
Design and Construction.
Project Management, Mgt. in
Building Information Modeling
(BIM), computer aided design
& drafting (CADD) manual
drafting and sketching, 3D
modeling & rendering.
JOMARI ENTERPRISE
Project Manager
Pasig, M. Manila
Jan 2017 – Present
Holylife Hospital - UBF Healthcare Inc., Life Homes Subdivision, Rosario Pasig
Existing & New Building, consist of 1 basement &
Parking, Ground Lobby and Out-Patient Services, 3
Floors Medical Rooms and Roof Deck.
Contract Period: 1.5-Year Value: Php. 75 M.
TAKENAKA CORPORATION
SINGAPORE Design Architect, BIM & Site Coordinator PROJECT INVOLVEMENT:
International Airport:
Terminal 4, Singapore
Terminal 3, Dubai
Terminal 3, Singapore
7 Star Hotel:
Palm Jumeirah Sofitel Hotel
and Resort, Dubai.
Restoration of 18th Century
Bldg. & Clock Tower, SG.
LRT & MRT Station, Singapore.
Wafer Fab/Clean Room, SG.
Hospitals:
100 Beds Holylife Hospital Mla
100 Beds Hospital, Khafji, KSA.
Oil & Gas Refinery (OSI)
ARAMCO, Rastanura, KSA.
KANOO Residential Compound
Residential Palace and
Resdtl. Villas, Dammam KSA.
Royal Saudi Airforce
Community Center Dar Al
Riyadh, Al Kharj KSA.
Singapore
Jan 2014 – Nov 2016
Proposed Terminal 4, Changi Airport
New passenger terminal building with a planned
capacity of 16 million passenger movements annually, a multi-storey car park and an open-air car-park
accommodating up to 1,500 lots. A two-storey
holding area for taxis to pick up arriving passengers, road improvement work to facilitate traffic —
including vehicles departing from T4 to East Coast Parkway. A connecting bridge across Airport
Boulevard for buses and airside vehicles, and a 68m- high Ramp Control Tower for air traffic-control
operations.
Contract Period: 3-Years Value:S$985million
SATO KOGYO (S)
Construction Pte. Ltd. Project Architect
Singapore
Sep 2011 – Nov 2013
Victoria Theatre and Victoria Concert Hall Additions
& Alterations
Conservation and Restoration of 107 year old
Heritage Building including the Clock Tower and the restoration of Clock Movement and 5 Historical Bells. Contract Period: 2-Years Value: S$44,980,000.00 M. Page 2 of 6
COMPUTER SKILLS: EVAN LIM-PENTA
Construction Co. LLC Project Architect
Microsoft Project, BIM - Revit
Architecture 2014, AutoCAD
2014, 3D Studio Max
Accurender V3.0, INTERGRAPH
MicroStation (unix &
windows) INTERGRAPH
IRAScan 32, Macromedia
Dreamweaver, Apple
Macintosh OS.X, MS Office
2010, DOS/Unix/Windows 98/
NT4.0-Server/Workstation,
Windows 2000 Server/Pro,
Microsoft FrontPage,
Microsoft Visio Pro.
Adobe Photoshop, Adobe
Lightroom, Adobe Premiere
Pro.
Dubai, UAE
Sep 2009 – Oct 2010
The Construction of Palm Jumeirah Sofitel Hotel &
Resort
Consist of Basement Car Park, Main Hotel Bldg.,
Banquet Bldg. Apartments, Lodge Villas, Beach Suites, Restaurants & Swimming Pools.
Contract Period: 3-Years Value:850 Million AED.
SYSTEM CONSTRUCT
L.L.C. Senior Architect
Dubai, UAE
Oct 2006 – Sep 2009
Sama Dubai; Lagoons Sales Center. Value: 52M AED
Sama Dubai; Jumeirah Hills Sales Center
Value: 52M AED
Dynergy Technology; Factory & Office Building
Value: 15M AED
UAE Exchange; Exchange Center/Ground + Mezz.
Value: 1.6M AED
AL ABBAR STAINLESS Project Coordinator
OTHER SKILLS:
UAV Pilot (Drone) with 12 hrs.
total flight time.
Photography & Videography
Photo & Video Editing.
(DJI Phantom 2 - Vision Plus)
IT – Administration of File
Storage Server, Installation &
configuration of CAD &
Graphics Software, printer and
plotter support.
Dubai, UAE
Jul 2005 – Aug 2006
The Construction of Dubai International Airport,
U.A.E.
Car Park, Terminal 3 and Concourse 2
Internal Package - Consist of Stainless Steel claddings, Glass & Aluminum, Curtain Walls & Spider System.
Value:145M AED
SHIMIZU (S) CORP. Site Architectural Coordinator
Singapore
Apr 2004 – Jul 2005
The Construction of Singapore Changi Airport
Terminal 3
GFA 430,000 sqm. Spread over seven levels
(including 3 levels of Underground car parks) 28
boarding gates, including 8 gates capable to handle the new super Jumbo Jet Airbus A380.
Value: US$ 882 Million, 3.5 Years.
FOLLOW ME:
A.M. ASSOCIATES
(Singapore) PTE. LTD. IT/CAD Manager
Singapore
Apr 1999 – Jul 2005 SSMC Wafer Fab, ST Microelectronics -AMK8, SMU LinkedIn:
https://www.linkedin.com/in/
greg-g-manzo-30b88a64/
SMALLWOOD,
REYNOLDS, STEWART
STEWART & ASSOCIATES
PTE.LTD. IT/CAD Specialist
Facebook:
https://www.facebook.com/R
enaissance-Studio-
Photography-
Singapore
July 1998 – Apr 1999
West Bay Complex, Doha Qatar
Consists of Hotel, Marina, Retail Office Tower & Club Fountain Square, Tampa, Florida, U.S.A.
Page 3 of 6
Continuation…. HAN, YIP & LEE
ASSOCIATES
Technical Manager
Singapore
July 1996 – June 1998
Sengkang LRT Station,
Sengkang HDB Proj.
Choa Chu Kang MRT Station
Residential Villas, Multi Storey Car Park
APCO - Architects and
Town Planners
Collaborative CAD – Architectural Designer
Singapore
Feb 1995 – July 1996
St. Michael and Aberdeen Private Condominium,
Serangoon Rd.
Hazel Park Private Condominium, consist of
Apartments, Clubhouse, Basement Carpark,
Swimming Pools & Tennis Courts.
EDAS - Engineering
Design and Supervision
Firm CAD Architect
Al Khiobar, KSA
Feb 1993 – Dec 1993
100 Beds Arabian Oil Company Hospital &
Residential Villas.
ARABSCAN Rebdi and
Belali Consulting Engineer Team Leader/Coordinator Dec 1991 – Dec 1992 On-Shore Inspection, ARAMCO Dhahran & Rastanura, Kingdom of Saudi Arabia. (World biggest Oil Refinery)
AL SUHAIMI DESIGN. CAD Architect
Dammam, KSA
Mar 1989 – Dec 1991 Residential Villas & Commercial Complex I. AL KHALDI
ENGINEERING OFF. Architectural Designer cum Draftsman Dammam. KSA
Jan 1985 - 1989
Al Zamil Residential Complex,
Al Kanoo Residential Complex, consist of swimming
pool, man-made lagoon & Landscape Areas.
Residential Villas
TRANS ASIA (Phils.) INC. Mechanical Draftsman (HVAC, Piping, Fire Sprinkler) Makati, M.Manila
Oct 1982 – Jan 1984
Royal Saudi Air Force, Al Kharj, KSA
Military Community consist of High-rise Apartments, Shopping, Center, Radio/TV Stations & Underground
Fuel Oil Storage Tank.
Page 4 of 6
JOB DESCRIPTIONS:
Project Management: Coordinating internal resources and vendors for the flawless execution of projects. Ensuring that all projects are delivered on-time, within scope and within budget. Coordinate internal resources and third parties/vendors for the flawless execution of projects.
Ensure that all projects are delivered on-time, within scope and within budget. Developing project scopes and objectives, involving all relevant stakeholders and ensuring technical feasibility.
Ensure resource availability and allocation.
Develop a detailed project plan to track progress. Use appropriate verification techniques to manage changes in project scope, schedule and costs.
Measure project performance using appropriate systems, tools and techniques. Report and escalate to management as needed.
Manage the relationship with the client and all stakeholders. Perform risk management to minimize project risks. Establish and maintain relationships with third parties/vendors. Create and maintain comprehensive project documentation. Site Works & Coordination: Prepare design program and schedules using Microsoft Project. Propagate the principle of design as per contractors’ point of view to accelerate site works.
Attend meetings, create accurate project notes and take follow-up action on projects.
Identify and resolves issues and conflicts within the project team. Coach, mentor, motivate and supervise project team members as per standards. Build, develop and raise any business relationships vital to the success of the project. Ensuring project transfer and drawings between parties as required by project. Study in advance all related works as per construction drawings and revisions in accordance with the specifications and contracts.
Liaise with the main contractor and sub-contractors to coordinate all interfacing materials.
Coordinate with the estimation department if there is any variation in the design. Prepare progress report. Conduct weekly or urgent meeting to the design team to keep them inform of any changes or discrepancies on the job site. Prepare Site Clarification Request (SCR / RFI) for clarification of discrepancies and missing information from the construction drawings. Design support; also prepare partial plans, elevations, sections and detail drawings of stainless steel cladding, aluminum doors and windows as well as curtain walls - unitized & spider system. Document control such as monitoring of sample submission, approval status of shop drawing and to ensure all trades are on schedule. Request for Information (RFI) for clarification of any discrepancies or missing information to the Consultants including site supervisions.
Monitor daily site activities, structural and architectural works on site whether it is to be constructed in accordance with construction drawings and specifications. Perform ON-SHORE INSPECTION (OSI) and AS-BUILT drawings in ARAMCO Rastanura Oil Refinery, employee batch no. C-50891. Coordinate with Production Manager, Cad operators and other group leaders regarding work schedule. VECTORIZATION and RASTER EDITING of Aramco existing Drawings, E1D, PID, ILD, Detail Plan and Page 5 of 6
ISOmetric drawings using INTERGRAPH MicroStation 32, MicroStation PC and AutoCAD R11.
Do plans and section of underground Fuel Oil Storage Tank. Do Fire Protection and H.V.A.C. plan.
Do Waste, Water and Storm drain piping layout. Do swimming pool piping plan and Flow diagram.
BIM Mgt & Coordination : Responsible for BIM implementation and enforcement. Review and Documentation, design and coordination conflicts.
Run and analyze clash detection on federated model. Communicate conflicts in model; both real and potential.
Prepare and distribute clash reports to facilitate the coordination process. Manage and distribute coordinated digital documents to the project team. Do site inspection and liaising with trade contractors. Meet with the designer consultants and other contractors as required to facilitate review of models as needed.
Create a plan for implementation base in the project requirements, who are the team members, what is the project what are the goals. Report on the company’s current and projected state in regards to BIM implementation.
Architectural & Interior
Design:
Involved in preparation of architectural & interior drawings, concept design to development of construction drawings, design competitions, 3D modeling and rendering, interior design and client presentations, conceptualize/interpret design and micro detailing.
Conducted in-depth studies and analyses of areas to be designed to establish requirements that insure that the user's needs are met. Developed schematic furniture layouts to determine practical requirements and project limitations.
Assisted the project manager and client with developing collateral equipments, including cost and acquisition strategy.
Estimated material requirements and costs and presented design to client for approval.
Advised client on interior design factors such as space planning, layout and utilization of furnishings or equipment, and color coordination. Project design coordination, do construction and shop drawings, liaise with contractors and building material suppliers.
Strong knowledge in CADD system and Customization. Strong design skills in Commercial & Residential Planning & Design. Capable to lead from small to large size team player in transparent honesty and integrity
Ability to meet strict deadlines and communicate effectively in English. Extensive knowledge of construction detailing and specifications. Page 6 of 6
EDUCATION & TRAINING: TECHNOLOGICAL
INSTITUTE OF THE
PHILIPPINES
Bachelor of Science in Architecture
1979 - 1983 Architectural Design
ARABSCAN, REBDI BELALI MicroStation 32
Feb. 1992 IRAS, PC & Workstation
CROWN SYSTEMS (S)
PTE. LTD.
Autodesk Revit Architecture Fundamentals 2014
July 15, 2015 Autodesk Revit Architecture
REFERENCES
Engr. Jobert Acantilado, General Manager, JOMARI ENTERPRISES Yamamoto, Project Manager, TAKENAKA CORPORATION (S). Jun Kato, Project Manager, SATO KOGYO (S) Pte. Ltd. Massimo Mercurio, Managing Director, A.M. ASSOCIATES, Singapore I hereby certify that the above information is true and correct to the best of my knowledge and belief. GREGORIO G. MANZO
Applicant