CURRICULUM VITAE
Saravana Prasath. S
**/* *********** ****** *** street, kaladipet
Mobile : +91-994*******
Chennai -600019,Tamil Nadu, India
*****.*******@*****.***
SKYPE: sarav.prasath1
Qualifications & Memberships
B.Tech (chemical Engineering)
St.Peter’s Engineering College, Anna University, Chennai (2007-2010)
Diploma in Petro-Chemical
Chennai Petroleum corporation Ltd,Chennai (2004-2007)
Market Sectors
Oil & Gas, LNG, Refinery Petrochemical.
Senior Process Engineer around 10.0 years of experience in Process Design of Oil & Gas Process Facilities, Refinery, Petro-Chemical, Work experience includes Basic Engineering, Vendor Package/Equipment Design, Front End Engineering & Design (FEED), Detail Engineering, Pre-Commissioning, Commissioning.
Project Role – Senior Process Engineer
Preparation of PFDs, P&IDs, Cause & effect Charts, Process Equipment Datasheets, Relief valve calculation, Process Datasheets for Instruments. Key Role player in engineering technical review meetings such as Design Review Meetings; P&ID review meetings, Vendor document review meeting etc.Supporting the project team in various stages of project such as FEED,DEC,Pre-commissioning,Commissioning, performance tests, project start-up, Asbuilt and Project hand over activities.
Career Highlights
June 2019 to till date – Senior Process Engineer Kellogg Brown & Root (KBR) – Chennai, India.
KBR, (Kellogg Brown & Root) is an American engineering, procurement, and construction company and a leading licensor of proprietary petrochemicals, refining technology.
TECHNICAL PROFESSIONAL – PROCESS
OMAN LNG DEBOTTLENECKING PROJECT OLNG FEED BROWNFILED LNG OMAN
The project aims to enhance production capacity additional 15% by making brown filed modifications in the existing LNG plant.
The entire cooling water network hydraulics demonstrated with pipenet software and starving exchangers validated with site conditions. The CW starving exchangers rectified with proper mitigation measures post demonstrating through Pipenet software.
LNG Supercritical PSV sizing for LNG Expander and Heavy Mixed refrigerant expander.
Previous Employers
Chicago Bridge &Iron(CB&I) (June 2014 – Aug-2018),
Valdel Engineers &Constructed ( June 2013-June 2014)
Protech Consultant Pvt Ltd (May 2010 – June 2013)
Site Experience
Chennai, Oman, Nigeria
Country Experience
Oman, Nigeria
Key Clients
TOTAL, AFISKY REFINERY, MPL, Nigerian LNG
Training
Process Simulation in chemsys
Oct- 2018 to May 2019 – Senior Process Engineer Kellogg Brown & Root (KBR) – Chennai, India
Nigeria LNG Train -7 FEED Project Nigeria, Bonny Island
Nigeria LNG have six train at present is planned to increase the capacity from 22 MTPA to 30 MTPA so they planned to construct train 7. NLNG chosen to conduct the FEED, pushing the company closer to realizing its expansion goals of increasing liquefied natural gas production. Handling a team of 15 member in Nigeria Engineering team (NETCO).
Responsibilities included:
Development of P&ID for Acid Gas recovery Unit and Dehydration unit.
Involved in HAZOP review and Close out report.
PSV Scenario analyses for Common Liquefaction Unit.
PSV Sizing.
Depressurization calculation.
April 2016 to August 2018 – Process Engineer Chicago Bridge and Iron(CB&I) – Gurgaon, India
CB&I is a one of the large EPC company headquarters in Woodlands Texas it is a leading licensor of proprietary petrochemicals, refining, and technologies with particular strength in the areas of olefins processing technologies.
Total petrochemical Ethane cracker Texas
EPC Total petrochemical 1000 KTA ethane to ethylene conversion with steam cracking
Ethane to ethylene conversion with stream cracking heater
Technology: Lummus
Responsibilities included:
Basic Engineering Package adequacy check for De-ethanizer unit, Regeneration complex loop hydraulics.
Preparation of PFD, P&ID and DPDT.
PSV Scenario analyses & PSV Sizing
Causes and effect.
ORPIC Ethane cracker OMAN
Responsibilities included:
BOG(Boil of gas unit) of Propane and Propylene tank PFD,P&ID,DPDT.
PSV Scenario analyses & PSV Sizing and Hydraulic Calculation .
Aug 2014 to August 2016 – Process Engineer Chicago Bridge and Iron – Gurgaon, India
Afisky refinery Russia
Afisky refinery to Sour water stripping unit and Amine recovery Unit
Responsibilities included:
Preparation of PFD, P&ID and DPDT, Hydraulic calculation for Amine recovery unit and Sour water stripping unit. 2 Phase separator, 3 Phase separator as per API 12J
PSV Scenario analyses & PSV Sizing.
Languages
English, Tamil and Hindi
Software Skills
ASPEN HYSYS
ASPEN FLARENET
SPPID
Personnel Details
Father’s name : Selva kumar
DOB : 10-10-1988
Marital Status : Single
Sex : Male
Nationality : Indian
Language : English, Tamil, Hindi
Passport No. : J4693563
April 2013 to August 2014 – Process Engineer Valdel E&C, Bengalure VEC is an Indo-American joint venture with S&B Engineers and Constructors Ltd provide a comprehensive range of services in Engineering, Procurement Assistance and Construction Management.
Atyrau refinery Kazakhstan
Atyrau refinery to set up 60 TPD Sulphur Recovery unit
Responsibilities included:
Preparation of PFD, P&ID and DPDT, Hydraulic calculation for Sulphur recovery unit.
PSV Scenario analyses & PSV Sizing,
Pump hydraulic, Control valve hydraulics, Separator sizing.
Preparation of datasheets for pumps, vessels, flow elements, Control valve.
Causes and effect, Alarm and trip list
Preparation of PVRV sizing Calculation as per API 2000
June 2010 to April 2013 – Commissioning Engineer Protech consultant Pvt Ltd-Chennai
Protech is a reputed firm of consultants, provide services in detailed engineering and procurement for petrochemical and chemical plants.
Manali petrochemical Chennai – Manali
PGMME Plant expansion project
Responsibilities included:
Preparation of scope of work documents, man hour optimization
Preparation of PFD, P&ID and DPDT, Hydraulic calculation
Preparation of HAZOP report .
Pre-commissioning activities
P&ID verification in site and preparation of punch list
Functional Test (Cause & Effect) & Sequence Test
Technical BID analysis for pumps
Preparation of Instrument and equipment datasheets.
Preparation of I/O List.
Review of vendor deliverables
Participating Operations/Contractor/Vendor project review meetings.
Assisting commissioning team and close out of punch list items
Developing of operating and start-up procedures
Year
Client
Project Name
Project Location
Project Type
Project Scope
2018-2019
NLNG
NLNG-Train 7
Nigeria
FEED
FEED,NLNG Train 7
2016-2018
Total
1000 KTA Ethane cracker
Texas, USA
BEP Package
EPC
2016-2015
Afisky Refinery
SRU Plant
Russia
ARU,SWS unit Package
EPC
2015-2014
Atyrau Refinery
SRU Plant
Kazakhstan
SRU unit Package
EPC
2010-2013
MPL
PGMME Plant
Manali-Tamilnadu
Commissioning, Detailed engineering
EPC
Your’s Sincerely
SARAVANA PRASATH