Resume

Sign in

Engineer Electrical

Location:
Ghaziabad, Uttar Pradesh, India
Salary:
90000
Posted:
December 08, 2019

Contact this candidate

Resume:

,CURRICULUM VITAE

Name

:

Manjeet Singh Grewal

Present Employer

:

Engineers India Limited New Delhi (Govt. of India) (A Premier Consultancy Organization of Asia in Oil / Gas / Petrochemicals fields )

Present Employment Title

:

Senior Manager (Electrical System design / Project Cost Estimation)

Phone No./E-Mail

:

+91-971*******/ ada0vz@r.postjobfree.com

Contact Address

:

C-95 Chander Nagar (T.H.A.) Ghaziabad -201011 (NCR) India

Nationality

:

Indian

Education Qualifications

:

HR Secondary School(11th Class ) passed in 1975

Diploma (3 years Programme) in Electrical Engg. (1975-1978) from Technical Board of Delhi Administration-passed in 1978 (India)

AMIE (B.E./B.Tech. (Electrical Engg. 1978-1981))-Associate membership of Institution of Engineers (India) in Electrical Engg. branch from Delhi Centre in December 1981. The Institution of Engineers (India) is an extension of Institution of Engineers (UK) .

Total Experience

:

38.5 years which includes 20 years of Electrical distribution system Design + 17 years of Project Cost Estimation & 1.5 years of Electrical site Supervision in Oil/Gas /Other Projects in India /abroad

Detailed Professional Experience

Total work Experience in the company (Engineers India Ltd, New Delhi India) : 38.5 Years

A Combined Experience of Supervision & management /achievement of implementation with 100% accuracy of Electrical system design implementation . (Basic Engineering detailed engg.), Electrical site supervision & Project Cost Estimation, for various Refinery / Petrochemicals / Gas /others projects in India/ overseas (Algeria), while working in ENGINEERS INDIA LIMITED . EIL is a Govt. of India Company (A Premier Consultancy organisation in Asia operating in Oil & Gas fields & various other fields in India /abroad for more than 50 years ) . Head office of the company is located in New Delhi (India) . My fields of experience are as mentioned below:

- 20 years of Electrical system design engineer - Basic engg. & detailed engineering as mentioned in the detailed career summary mentioned below (Dec 1979 -Dec 1999) in head office -New Delhi

- 18 months as Electrical site (Supervision) Engineer as detailed below in the detailed career summary at site as an Electrical Site Engineer (Dec1999 - May2000) at Mathura Refinery (Uttar Pradesh) India

-17 years of Project Cost Estimation Engineer as per the details mentioned in the detailed career summary below (cost estimation based upon the engg. MTOs from all Engineering disciplines) (June 2000—till date) in head office -New Delhi

DETAILED CAREER SUMMARY (starting from the latest)

As Cost Engineer:

Supervised, Managed, achieved the desired results for the detailed cost estimate with 10% accuracy (for DFR) including estimates for all engineering disciplines ( Civiil, Structural, Electrical, Mechanical, Rotating, Piping, Instrumentation /others) for projects in DFR (Detailed feasibility Report) mode

Supervised, Managed, achieved the desired results, for the detailed cost estimates for all individually procured items/ packages with 10% accuracy for ordering purposes for EPCM ( Engg, procurement, construction, Project management) type of projects .

Supervised, Managed achieved the desired results for the detailed cost Estimates with 10% accuracy (for Bid Comparison / ordering purposes ) for various EPCC / LSTK (Lump sum turnkey) type of projects.

Supervised, Managed achieved results for the detailed Project Cost Estimates with required accuracy for all engg. Deptts. (Civil, Structural, Mechanical, Rotating, Piping, Instrumentation others) . for various PMC (Project Management Consultancy) jobs quoted by the company

Supervised,managed, achieved the desired results for the detailed Magnitude of Order/EMD /Bid Comparison cost Estimates for Process, Civil,Structural, Electrical, Mechanical,Rotating, Piping, Instrumentation/Other engg deptts MRs, Tenders, MTOs for various jobs / projects

Supervised, Managed, achieved the desired results for the Order of Magnitude /EMD / Bid Comparison Estimates with 10% accuracy for ordering purposes for all Electrical Items (from 220V to 220KV) Including Tenders, MRs, MTOs electrical items for all types of Projects in my Company I was solely responsible for each & every Electrical Engg. item in the deptt.

Carried out the Financial Analysis for calculation of IRR for checking the feasibility of the project from profitability point of view for desired term /age of Plant

Did the cost monitoring & preparation of regular cost monitoring reports for various jobs on day today basis

Cost variance analysis/review for ordering purposes of various Change Orders, New Items Claims, Change of scope items/packages for various projects

Carrying out the negotiations for various items/ projects on day today basis with cost analysis reports with the vendors /Contractors

Corodination with all other engineering deptts / discussing with them for calculation of most optimum cost for various items/packages

Above activities were performed for various Refinery, Petrochemicals, Gas Plants, Pipelines metallurgy & other projects in India/abroad as mentioned below

Following are the detailed work History for various jobs supervised / managed during the tenure/ working in the company

Project Name :

Captive Power Plant -Skikda Refinery (ALGERIA ), Cairns Energy-India ( Gas plant, KPC (Kuwait)- Refinery Renovation job & GAIL (India) – LPG Plant & Various other jobs of various clients in India

Client Name :

M/S SONATRACH (Algeria)-CPP, M/s CAIRNS Energy (India), M/S KPC (Kuwait), GAIL (Gas Authority of India Limited India ) & various other clients in India

country :

Algeria, Kuwait, India

Job Title :

Senior Manager (Costing)

Period :

August -2013 onwards

Project Phase :

EPCM (Cairns Energy), PMC (Captive Power Plant -Skikda) jobs Cost Estimates

Responsibility :

Supervised, Managed & prepared the detailed Cost Estimates for all Process unit equipments / Items for all the above jobs for different phases. depending upon the phase/type of the job

Project Name :

Rehabilitation /Adoption Project of Skikda Refinery at Skikda –ALGERIA

Client Name :

M/S SONATRACH Refinery located at Skikda

Country :

ALGERIA

Job Title :

Senior Manager (Costing ) ALGERIA

Period :

September -2011 to August-2013 (working in ALGERIA)

Project Phase :

PMC scope for 10% Refinery expansion (Rehabilitation/Adoption ) for M/S SONATRACH Refinery Skikda ( Algeria )

))Responsibility :

The job constituted 10% capacity expansion of existing skikda refinery & addition of various new downstream units including the Modernization of existing Instrumentation & Fire protection network in the existing refinery . I was entirely responsible for review / management/recommendation of detailed cost estimates for process items for all engineering disciplines/ departments at site including cost estimates for new items other than those specified various in tenders, packages. Also did the cost estimation for various new site works, new labour jobs, manpower supply & review/ recommendation of CBAs for Process equipments/ items. I was required to facilitate the detailed cost calculations for recommending the most justifiable cost of the Change orders/ new process items / new site job/additional jobs, for carrying the negotiations by Client with the vendors/Contractors. The project was executed in Project Management Consultancy scope by the company.

Project Name :

South Jetty Pipeline Project for IOCL India

Client Name :

Indian Oil Corporation Limited India

Country :

India

Job Title :

Manager (Costing)

Period :

October 2010 to September 2011

Project Phase :

Cost Estimation during DFR & during execution of the job

Responsibility :

South Jetty Pipeline Project for M/S IOCL Supervised/managed the detailed cost estimation for various process equipments, Bulk Materials & tenders involved on OBE Basis, Also responsible of cost monitoring of the project The job included incineator, Fire protection system, laying tenders etc.

Project Name :

Compressor station at Chailsa & Kailaras for Gas Authority of India Limited India

Client Name :

Gas Authority of India Limited India

Country :

India

Job Title :

Manager (Costing)

Period :

March 2008 to October 2010

Project Phase :

Costing during Detailed Estimate (DFR stage ) & during execution stage

Responsibility :

b) Compressor Station at Chailsa & Kailras Supervised, managed the detailed cost estimation of various process equipments & Bulk Materials & tenders involved on Conventional /LSTK . Also responsible for cost Monitoring of the project . The project was executed at Grass root level Estimates for settlements of Extra Claims for various items/jobs. Conducted successful negotiations for minimising the cost of various items

Project Name :

Cost Engg Activities for various jobs of various Clients (India)

Client Name :

Indian Oil Corporation Limited (India), Bharat Petroleum Corporation Limited (India), Indian Petrochemicals Corporation Limited (India) Oil & Natural Gas Commission (India), Gas Authority of India limited (India)

Country :

India

Job Title :

Deputy Manager (Costing )

Period :

March 2005 to March 2007

Project Phase :

Estimation of for all types of job Estimates

Responsibility :

Managed/Supervised /achieved with desired results for the estimates for EPCC (LSTK) Bid Comparison Estimates (for ordering purposes) for Additional Processing Facilities Project for ONGC Uran Hazira- India

Managed/Supervised/achieved the desired results for the estimates for EPCC (LSTK) Bid Comparison Estimates (for ordering purposes) for Butanization Project for ONGC Hazira -India

Managed/Supervised /achieved the desired results for EPCC (LSTK) Bid Comparison Estimates for Fire Network Project for Client ONGC Hazira- India

Managed/ Supervised/achieved the desired results for the cost estimates for all the electrical items for all the jobs in the department as I was the only Electrical engineer in the deptt.

Project Name :

Bina Refinery Marketing Terminal BPCL located at Madhya Pradesh India

Client Name :

BHARAT PETROLEUM CORPORATION LIMITED (Madhya Pradesh) india

Country :

India

Job Title :

Deputy Manager (Costing)

Period :

2007 to Sept 2009

Project Phase :

Estimation at feasibility (DFR) as well as during execution stage

Responsibility :

Bina Refinery Marketing Terminal The job included the detailed cost estimation of various process equipments, Bulk Materials Also the of the jib cost Monitoring in Conventional/LSTK execution of project was executed at grass root Marketing Terminal. Conducted successful negotiations for minimising the cost for various items of the project

Project Name :

Cost Engineering activities for various jobs in the dept.

Client Name :

Different Clients IOCL BPCL ONGC CPCL GAIL India

Country :

India

Job Title :

Deputy Manager (Costing)

Period :

April 2001 to March 2005

Project Phase :

Execution Stage

Responsibility :

Supervised/ managed/achieved the desired results for the cost estimates for DFRs Tenders, Material requisitions, MTOs The types of Estimates included EMD / Bid Comparison, Single Vendor Estimates, EPCC Electrical estimates. All Cost related Activities as described have been performed for the following Jobs. in refinery, Petrochemicals Metallurgy & other process related units Conducted successful negotiations for minimising the cost for various items

AS ELECTRICAL SITE ENGINEER –in the field of construction (Dec1999- May2000)

Project Name :

VDU Phase addition III of Furnace of Mathura Refinery Mathura (India) (Expansion of the VDU Unit / & its stack at Mathura Refinery site

Client Name :

Indian Oil Corporation India Ltd. (IOCL Mathura)

Country :

India

Job Title :

Deputy Manager (Electrical site execution )

Period :

1999 to 2000

Project Phase :

Electrical Site Supervision for the subject job in (EPCM) Conventional Mode

Responsibility :

Posted as Electrical Site Engineer at Mathura refinery & was entirely responsible for all day-to-day site supervision of electrical contractor’s activities for VDU Phase-III project of Mathura Refinery .The job constituted an Addition of third Furnace with stack structure Site activities included the daily supervision of Electrical Installation works, testing of all Electrical equipments (Plant Lighting Power. Lightening Protection, Earthing works) / Pre-commissioning checks/ commissioning of HT/LT sw.gr, HT/LT motors / HT/LT Cables/ Variable speed drives / Control schemes checks/ Tender works execution including lighting fixtures/cabling/Fire Alarm/ Plant Communication Telephone system) Preparation of check lists for all the electrical equipment packages/ installations Check list for all electrical equipments such as HT/LT switchgear VFDs cable trays/trenches Flameproof eqpts installed at site & supervision for installation for electrical engineering (lighting/power/earthing eqpts as per the as per engg. Layout drawings, also preparation of as Built drawings

AS ELECTRICAL DESIGN ENGINEER -

Project Name :

Air Vacuum Unit of Indian Oil Corporation Ltd India-Mathura (India) AVU Unit)

Client Name :

Indian Oil Corporation Limited India (IOCL Mathura)

Country :

India

Job Title :

Deputy Manager (Electrical) Design Engineer

Period :

1998 to 1999

Project Phase :

Implementation of Elect engg design for the job From Concept To Commissioning for AVU Project at Mathura (India)

Responsibility :

Supervised//Managed /achieved 100% desired results as an Electrical engineer for the job executed . I was entirely responsible for accomplishment of all basic & detailed electrical design engineering for the Project. Prepared the Design Basis document for designing electrical system for the project. Conducted the Load analysis, Load Flow studies, Fault level analysis, voltage profile during normal & transient conditions, motor starting studies Calculations for sizing of HT/LT switchgear, HT/LT Cables . Calculations for Sizing of HT generators, HT/LT transformers, DG sets, NGR,UPS, VFD, Battery system, power factor correction. Preparation of Single line diagrams indicating ratings & protection for feeders. Prepared Area Classification Drawings & selection of electrical equipments as per Classification requirements. Engineering for procurement include preparing the MRs, TQ s, TBAs, PRs Electrical Data sheets for electrical Equipments it included vendor discussions, vendor visits vendor drawings approval Also designed the Fire Alarm system, Paging/Intercom system Telephone system, Normal & emergency lighting system, Lightening protection system, Plant Earthing system with Lighting, Cabling & Earthing layouts. Sub Station s design Heat tracing system Cathodic Protection system .Designed the entire cable trays /trench system & their layouts for all HT/LT/Other Cables of plant . Calculations of detailed MTOs of lighting cabling & earthing & F,A,/P.A./ telephone FLP/safe eqpts cable trays/ trenches & connected accessories for preparing the Electrical erection Tender. Preparation of all Control schematics, Vendor Drawings approval. Preparation of Protection Coordination for all conventional/numerical relay settings. Conducted site coordination, site visits, vendor shop visits, vendor discussions for the overall satisfactory completion & commissioning of the project.

Project Name :

High Density Polyethelene Project of Gas Authority India Ltd. at PATA (Uttar Pradeh India )

Client Name :

Gas Authority of India Limited (GAIL) India

Country :

India

Job Title :

Dy Manger (Electrical) Design Engineer from concept to commissioning

Period :

1994 to 1998

Project Phase :

Implementation of Electrical system design for the project From Concept to Commissioning of the HDPE Project

Responsibility :

Supervised//Managed /achieved 100% desired results as an Electrical engineer for the job executed . I was entirely responsible for accomplishment of all basic & detailed electrical design engineering for the Project. Prepared the Design Basis document for designing electrical system for the project . Conducted the Load Analysis, Load Flow studies, Fault level analysis, voltage profile during normal & transient conditions, motor starting studies, Calculations for Sizing of HT/LT switchgear, HT/LT Cables . Calculations for sizing of HT generators, HT/LT transformers, DG sets, NGR,UPS, VFD, Battery system, power factor correction . Preparation of Single line diagrams indicating ratings & protection. Prepared area Classification drawings & selection of electrical equipments as per Classification requirements. Sub Stations design Engineering for procurement include preparing the MRs, TQ s, TBAs, PRs for electrical Equipments it included vendor discussions, vendor visits vendor drawings approval Also designed Heat Tracing system Cathodic Protection system, Fire Alarm system, Paging/Intercom system Telephone system, Normal & emergency lighting system, Lightening protection system, Plant Earthing system with their respective layouts. Designed theentire cable tray /trench system & their layouts for all HT/LT/Other Cables of plant . Calculations of detailed MTOs of lighting cabling & earthing & F,A,/P.A./ telephone FLP/safe eqpts cable trays & connected accessories for preparing the Electrical preparation of Electrical Erection Tender. Preparation of all Control schemaitcs, Vendor Drawings approval. Preparation of Protection Coordination for all conventional/numerical relay settings. Conducted site coordination, site visits, vendor shop visits, vendor discussions for the overall satisfactory completion & commissioning of the project.

Project Name :

Modification jobs Fifth Furnace addition Propane unloading Addition og Reactor in power plant of MGCC Project of IPCL at Nagothane (Maharashtra) India

Client Name :

Indian Petrochemicals Corporation Limited Nagothane India

Country :

India

Job Title :

Sr Engineer (Electrical) Design Engineer from concept to commissioning

Period :

1991 to 1994

Project Phase :

Implementation of Electrical engineering design for the project From Concept to commissioning of various modification jobs n

Responsibility :

Supervised//Managed /achieved 100% desired results as an Electrical engineer for the job executed . I was entirely responsible for accomplishment of all basic & detailed electrical design engineering for the Project. Prepared the Design Basis document for designing electrical system for the project. Conducted calculaitons for Load Analysis, Load Flow studies, Fault level analysis, voltage profile during normal & transient conditions, motor starting studies, Calculations for Sizing of HT/LT switchgear, HT/LT Cables . Calculations for sizing of HT generators, HT/LT transformers, DG sets,NGR, UPS, VFD, Battery system, power factor correction. Preparation of Single line diagrams indicating ratings & protection. Prepared Area Classification Drawings & selection of electrical equipments as per Classification requirements. Sub Station design Engineering for procurement include preparing the MRs, TQ s, TBAs, PRs for electrical Equipments it included vendor discussions, vendor visits vendor drawings approval Also designed the Heat Tracing system Cathodic Protetion system Fire Alarm system, Paging/Intercom system Telephone system, Normal & emergency lighting system, Lightening protection system, Plant Earthing system with their respective layouts. Designed the entire cable tray /trench system & their layouts for all HT/LT/Other Cables of plant . Calculations of detailed MTOs of lighting cabling & earthing & F,A,/P.A./ telephone, FLP/safe eqpts cable trays & connected accessories for preparing the Electrical preparation of Electrical Erection Tender. Preparation of all Control schemaitcs, Vendor Drawings approval. Preparation of Protection Coordination for all conventionalrelay settings. Conducted site coordination, site visits, vendor shop visits, vendor discussions for the overall satisfactory completion & commissioning of the project.

Project Name :

Gas Cracker Plant situated at Nagothane Maharashtra India

Client Name :

Indian Petrochemicals Corporation Ltd. Nagothane India

Country :

India

Job Title :

Sr Engineer (Electrical) Design Engineer

Period :

1987 to 1991

Project Phase :

Implementation of Electrical power distribution system, From concept to commissioning of Gas Cracker Project

Responsibility :

Supervised//Managed /achieved 100% desired results as an Electrical engineer for the job executed . I was entirely responsible for accomplishment of all basic & detailed electrical design engineering for the Project. Prepared the Design Basis document for designing electrical system for the project . Conducted the Load Analysis, Load Flow studies, Fault level analysis, voltage profile during normal & transient conditions, Sizing of HT/LT switchgear, HT/LT Cables . Sizing of HT generators, HT/LT transformers, DG sets, UPS, VFD, Battery system,, Preparation of Single line diagrams indicating ratings & protection. Prepared Area Classification Drawings & selection of electrical equipments as per Classification requirements. Engineering for procurement include preparing the MRs, TQ s, TBAs, PRs for electrical Equipments it included vendor discussions, vendor visits vendor drawings approval Also designed the Fire Alarm system, Paging/Intercom system Telephone system, Normal & emergency lighting system, Lightening protection system, Plant Earthing system with their respective layouts. Designed the entire cable tray /trench system & their layouts for all HT/LT/Other Cables of plant . Calculations of detailed MTOs of lighting cabling & earthing & F,A,/P.A./ telephone FLP/safe eqpts cable trays & connected accessories for preparing the Electrical preparation of Electrical Erection Tender. Preparation of all Control schemaitcs, Vendor Drawings approval. Preparation of Protection Coordination for all conventional relay settings. Conducted site coordination, site visits, vendor shop visits,vendor discussions for the overall satisfactory completion & commissioning of the project.

Project Name :

Polyester Staple Fibre Project of Bongaigaon Refinery Project Assam India

Client Name :

Bongaigaon Refinery & Petrochemicals Ltd. Bongaigaon Assam India

Country :

India

Job Title :

Electrical Engg. Design & Implementation

Period :

1984 to 1987

Project Phase :

Implementation of Electrical power distribution system,from concept to commissioning for the Project

Responsibility :

Supervised//Managed /achieved 100% desired results as an Electrical engineer for the job executed . I was entirely responsible for accomplishment of all basic & detailed electrical design engineering for the Project. Prepared the Design Basis document for designing electrical system for the project . Conducted the Load Analysis, Load Flow studies, Fault level analysis, voltage profile during normal & transient conditions, Sizing of HT/LT switchgear, HT/LT Cables . Sizing of HT generators, HT/LT transformers, DG sets, UPS, VFD, Battery system,, Preparation of Single line diagrams indicating ratings & protection. Prepared Area Classification Drawings & selection of electrical equipments as per Classification requirements. Engineering for procurement include preparing the MRs, TQ s, TBAs, PRs for electrical Equipments it included vendor discussions, vendor visits vendor drawings approval Also designed the Fire Alarm system, Paging/Intercom system Telephone system, Normal & emergency lighting system, Lightening protection system, Plant Earthing system with their respective layouts. Designed the entire cable tray /trench system & their layouts for all HT/LT/Other Cables of plant . Calculations of detailed MTOs of lighting cabling & earthing & F,A,/P.A./ telephone FLP/safe eqpts cable trays & connected accessories for preparing the Electrical preparation of Electrical Erection Tender. Preparation of all Control schemaitcs, Vendor Drawings approval. Preparation of Protection Coordination for all conventional relay settings. Conducted site coordination, site visits, vendor shop visits,vendor discussions for the overall satisfactory completion & commissioning of the project.



Contact this candidate