ABUL HOSSAIN
ELV SITE ENGNEEAR
*********@*****.***
EDUCATIONAL BACKGROUND
Diploma in Electrical Engineering from Bangladesh Technical Education Board - Dhaka in 2001
COMPUTER SKILLS
Operating system windows 98/2000/XP, Windows 10
Microsoft Office,XL
EXPERIENCE SUMMARY
POSITION
COMPANY
PERIOD
Asst. Engineer
Abul Khair Group Companies – Bangladesh
02-09-2002 to 06-05-2003
Electrical & ELV Supervisor
ETA M& E Division -UAE
13-05-2003 to 22-04-2014
Elv supervisor
VOLTAS LTD QATAR
06-04-2014 TO 30-07-2019
ITE ENGNEER ELV
VOLTAS LTD QATAR
31-07-2019 TO PRESENT
Present Roles & Responsibilities
Detailed study of electrical & ELV drawings & specification to arranging the materials as per Bill of Quantities.
Installation and supervision of G.I .EMT conduit tray trucking as per drawing.
Ordering the ELV System all type of cable and material as per site condition.
Installation of ELV system all CO panel, DDC panel, FA,PAVA panel, MSFD control panel & Telecom Rack.
Installation of BMS,CO,FIRE ALARM,PAVA ALL DEVICE
Cable pulling and termination of BMS CO SYSTEM fire alarm,PAVA,MSFD, access control,CCTV, Elin k for lift & data.
Cable pulling of fiber optic splicing light testing & ODTR.
Knowledge testing and commissioning co system BMS fire alarm with 3rd party.
Manpower and Material Management.
Handling the all ELV sub conductor's and supplier
Preparation of material indents to stores and follow up of required materials till it reaches the site.
Handing-over of job to client.
A dynamic professional with 19 years’ experience in Project Management, Project Planning, Site Management, Sub-*contractor Management, Execution, Coordination and Team Management.
Currently associated with M/s Voltas Ltd as Project Engineer – electrical /elv Projects at Doha - Qatar.
Gained significant exposure in BOQ preparation, Planning & Execution of ele/elv Project. Exposure in foreseeing *performance bottlenecks and taking corrective measures to avoid the same.
Gained significant exposure in BOQ preparation, Planning & Execution of ele/elv Project. Exposure in foreseeing *performance bottlenecks and taking corrective measures to avoid the same.
Excellent analytical, trouble shooting and inter-personal skills with proven ability in driving quality enhancement, *process improvement and cost savings initiatives during the career span.
Name of Organization
Voltas ltd Qatar
Start Date
14-04-2014
End Date
Till date
Position Held
Site Engineer ( Service )
Duties &
Responsibilities
To Follow Site work as per Approved Drawings(ELV,BMS,ELE- containment)
To follow ELV works as per drawings ( Fire alarm, cctv, ACS)
To follow QA/QC approved
To Follow Location Clearance & material Arrangement
To Follow Location Clearance & material Arrangement
To Follow DB, MCCE, SMDB, installation and termination and approval.
To Follow FA,PA,CCTV,BMS,AV,CO installation and commissioning
BMS, CO system installation and Commissioning.
To follow sub- contractors work and bills
BMS – T&C FOR SITE HANDINGOVER
ELV – T&C FOR SITE HANDINGOVER
CO SYSTEM – T&C FOR SITE HANDING OVER
THIRD PARTY SYSTEM – T&C FOR HANDING OVER.
fiber optic cable pulling,splicing vfl testing,otdr
TO FOLLOW ALL SYSTEM NETWORKING
Projects Handled
Qatar Hand Ball Stadium 06-04-2014 to 19-11-2014 Duhail, Qatar
Workers Hospital WH & IHC 20-11-2014 to 02-08-2016 Sanaiya, Qatar
Doha Festival City (DFC) 03-08-2016 to 30-04-2017 Doha,Qatar
Vendome Mall 1-05-2017 to at present Lusail, Qatar
Name of Organization
ETA M&E UAE
Start Date
13-05-2003
End Date
22-04-2014
Position Held
SUPERVISOR ELECTRICAL, ELV
Duties & Responsibilities
Emirates palace hotel( cph)from 13-05-2003 to 05-02-2005 electrical &elv
contenment and cable pulling Abu Dhabi
Dubai air port hanger 06-02-2005 to 10-12-2005 electrical &elv all
contentment and cable pulling Dubai
star butte hotel 11-12-2005 to 16-03-2007 electrical &elv all contentment &
cable pulling termination, testing Dubai
Dubai metro trade center station from 21-09-2008 to 25-06-2009 – electrical
all work Dubai
Alreem island zone d 50 story building from 28-06-2009 to 05-02-2011
all electrical elv contentment cable pulling termination,testing Abu Dhabi
Cleveland clinic ccad from 06-02-2011 to 10-03-2014 all elv work fire alaram,
pava,cctv,door access control,wifi,data,bms,pmcs all contentment,cable
pulling,termination .testing and commission.
liberty house commercial &residential building 17-03-2007 to 20-09-2008 dubai.
Projects Handled
Emirate place hotel (cph) Abu Dhabi,
Dubai airport hangar,
Star buek hotel Dubai,
Liberty house commercial &residential building Dubai,
Dubai metro trade center station Dubai.
Al ream island 50 story building Abu Dhabi,
Cleveland clinic ccad Abu Dhabi
PERSONAL PROFILE:
Nationality
Bangladesh
Date of Birth
2/2/1983
Sex
Male
Marital Status
Married
Languages
English, Hindi & Bangla