Post Job Free
Sign in

Quality Control Process Piping

Location:
Houston, TX
Posted:
October 29, 2024

Contact this candidate

Resume:

John D. Scaife

**** ****** *****

Pearland, TX **584

318-***-****

*********@***.***

www.linkedin.com/in/john-scaife-761

AWS Certified Welding Inspector

Member# 140353298

Professional Experience: Specialty Welder, Supervisor and QC for Industrial Construction as an Independent Contractor

(1989-present)

SWAT (Specialty Welding and Turnarounds)

Gonzales, LA

February 2022-present

Supervisor and QC for process piping and oversee mechanical work at various refineries and plants nationwide including Marathon Texas City, Marathon Garyville La, Calumet Great Falls Montana, Air Products Baton Rouge, Delek Big Spring Tx, Calumet Princeton La. PARFAB Companies

Tulsa, OK

November 2021-January 2022

Quality Control and supervisor to oversee weld quality and perform visual test acceptance, dye penetrant acceptance, and x-ray film acceptance. Capture welder stencils and perform weld mapping. Review packages for issues and discrepancies and refer to the management team for prospective correction and/or RFI through the Engineering team. Catamaran Industrial Services

Gonzales, LA

February 2020-August 2021

Superintendent. Oversee all work at Formosa Plastics in Port Comfort TX. Work included Scheduling, planning, hiring, equipment rental, toolroom stock and supply, equipment procurement, prefab set up, installation of piping and equipment, final walk down with the client, and demob from the facility. The team completed four shutdowns in 2020 and, as a result, were added to the blanket maintenance contract in 2021.

SWAT (Specialty Welding and Turnarounds)

March 2019-February 2020

Supervisor. Inspect process piping and oversee mechanical work at various plants and facilities including Marathon Detroit, Marathon Texas City, and Calumet Shreveport.

MBG Construction

January 2019-March 2019

Superintendent. Facility and capital work at a tank farm in Deer Park. Work included all hiring, assessment, planning, equipment rentals, material procurement, prefab, trenching, and installation of piping and equipment. Worked closely with company representatives and engineers to make sure scope and timelines were achieved. Amec-Foster Wheeler Construction

Chocolate Bayou, Tx.

January 2018-January 2019

Pipe Welder, Pipe Foreman. Hired to weld 2 Chrome for OSBL pipe rack. Promoted to Foreman due to previous experience and project falling behind. Promoted to supervisor of the OSBL pipe rack in February in order to identify project issues that were impeding progress. Project was completed on time.

Repcon Industrial

Shell Refinery. Deer Park, Tx

November 2017-December 2017

Specialty Welder. Weld and assist with installation of process piping at Shell Deer Park facility for a major shutdown. CB&I Specialty Piping

January 2017- November 2017

Pipe Welder, Fitter, Supervisor, G-40. Various shutdowns as a permanent employee. Jobs in Mississippi, Louisiana, and Tennessee. Turner Industries Group

BASF, Pasadena Tx

August 2016-January 2017

Piping Foreman/Punch List Foreman. Working Packages in different units. Meeting with the Client and walking down packages for Final Punch List. Assign job tasks to Foremen and clear items as work was completed. Worked closely with Engineering to obtain Field Change Orders and Drawings. Update P&ID drawings to reflect changes. SWAT

June 2016- August 2017

Combo Welder. Welded on p9, Stainless Steel (304 L), Low Temp Carbon, and A105 Carbon as well as Structural. Assist Pipe Fitters in rigging and moving in spools.

SWS

October 2015-June 2016

Pipe Welder, Assistant Foreman. Fab, weld, and install new piping for an additional dock at Marathon Texas City dock location. Excel Construction, Inc.

April 2015-October 2015

Pipe Welder. Weld and assist with installation of big bore, heavy wall Stainless piping at CF Industries in Plaquamine La. Shield Energy Services, INC.

Dickinson, ND.

May 2012-April 2015

Owner/Operator. Oilfield service company. We mainly built Well Pads from the ground up. This included setting and leveling all the equipment such as, up to 14 10k barrel tanks, Separators,and out to the pipeline, heater/treaters. Blow down tanks, and flares, all piping from the wellhead through the equipment.

Fluor Daniels Construction

2001-2012

New Power Plant construction at various sites in Texas, Oklahoma, Mississippi, and Georgia. I worked as a Combo Welder, Pipe Fitter, Piping Foreman, and QC Assistant on several projects.

Mega Crane Inc.

1997-2001

Offshore crane and hook-up jobs. Welder, crane operator, Supervisor. Using mobile cranes, ranging from 10 ton-150 ton, remove and/or replace equipment for oil production on platforms in the Gulf. Refurbish platforms. Piping and Structural redesign and replacement. As a Supervisor, I was responsible for all work performed, ensuring that all applicable Codes and Standards were met or exceeded. Piping codes ASME B.31.3 and Structural codes AISC 207-20. Ensure that all safety requirements were met or exceeded according to OSHA standards by all personnel and equipment. Brown Steel Contractors Inc.

Newnan Ga., Louisville Ky

1989-1997

(currently listed as Caldwell Tanks, Inc)

Fabrication and erection of elevated water storage facilities. My first job as a welder in 1989. In 1991, promoted to Asst. Foreman. In 1993, promoted to Foreman. As the senior Supervisor on each project, I led a 5 man team that fabricated and erected 100k gallon up to 1 million gallon water towers. Oversaw all aspects of construction including, tower erection and bolt-up, water tank fabrication, crane and rigging, welding and safety.

Professional References:

Matt Whatley, Project Manager at Catamaran

870-***-****

Brian Brigdmon, Superintendent at TIC Construction

417-***-****

Brandon Stringfellow, Project Manager at SWAT

228-***-****



Contact this candidate