FACKSON CHANDA
Plot ****/**/**, Kamwala South, Lusaka, Zambia E-mail: *****************@*****.*** Languages: English (Excellent), Cibemba (Excellent), Cinyanja (Fair) Tel/WhatsApp: +260-***-****** ENGINEER/TECHNICAL ADVISOR/METALLURGIST
PERSONAL ATTRIBUTES
(a) Possess a high level of broad problem solving and analytical skills with ability to perform under pressure.
(b) Good critical thinking skills, proactive and reactive thinking.
Hobbies/Interests: Able to travel, target oriented, planner, organizer, self-starter, watching/playing soccer & chess.
Valid SADC Driver’s License: Class C.
Passport No.: ZN828308
N.R.C No.: 194645/32/1 – Zambia, Central Africa. EDUCATION
Bachelor of Engineering (Copperbelt University, Zambia) 1999 - 2003
Diploma in Mining Metallurgy (Copperbelt University, Zambia) 1993 - 1995 AREAS OF EXPERTISE
Proficient in: Electrical Engineering, Construction Supervision/Management, Drawings, Budget Control & BOQs. Familiar with: Civil, Building, Quality Assurance & Control, Preparation of Tender/Solicitation Documents. Computer Skills: MS Word, Excel, Power Point, AutoCAD, Project Office 2021. SKILLS SPECIFICATIONS
(a) Developed leadership and management skills.
(b) Strategic/Business planning skills.
(a) Good working knowledge of computer.
(b) Knowledge of Engineering Procedures.
(c) Working Knowledge of Plant, Electrical Maintenance and Engineering Procedures.
(d) High analytical skills/Knowledge of electric motor drive systems (Soft starters and VSDs).
(e) Exemplary work ethics.
MEMBERSHIP TO PROFESSIONAL BODIES
• Member: Engineering Institution of Zambia, (Membership Number: 008762)
• Member: Engineers’ Registration Board, (Membership Number: 002434) Valid for 2024 WORK HISTORY
Munyola Enterprises Limited, Zambia (Project Manager) April 2020 - Date Key Role: Planning, coordinating and implementing all electrical maintenance and repair activities in order to ensure maximum availability of plant and equipment. Key Accountability
(a) Develop and monitor electrical maintenance plans to maximize plant and equipment availability.
(b) Supervise and coordinate electrical maintenance activities to ensure high plant availability.
(c) Analyze electrical plant performance data and reports to resolve recurring problems in order to improve plant reliability and availability.
(d) Design and implement energy management programs in order to reduce production costs.
(e) Supervise contracted electrical maintenance works to ensure contractors are up to standard and complete tasks.
(f) Carry out periodic work site inspections to determine adherence to project objectives, work standards, safety practices, rectify deficiencies identified and recommend areas needing improvements.
(g) Ensure optimum and efficient utilization of resources within budget limits, (time, labor, and transport).
(h) Prepare engineering reports by collecting, analyzing, and summarizing data for improvement purposes.
(i) Provide technical advice in electrical plant and equipment to ensure improved availability and reliability.
(j) Manage and encourage staff, optimizes their outputs and effectively manages relationships in order to achieve organizational goals.
(k) Performs any other duties that may be delegated from time to time by superiors. Page 2 of 3
IFAD/Ministry of Agriculture, Zambia (Quality Assurance Engineer) Nov. 2015 – Mar. 2020 Key Role: Responsible for the efficient design and supervision of all infrastructural works in order to effectively contribute to the attainment of program objectives by IFAD/Ministry of Agriculture, Zambia. Key Accountabilities
(a) Supervised, rehabilitated and electrified 20 agricultural camp houses, 3 Farmer Training Centres (FTCs), 15 storage sheds, 8 weirs, Seed Testing Laboratory for Ministry of Agriculture in Zambia.
(b) Prepared designs, drawings and BOQs for the rehabilitation and construction works for tendering purposes.
(c) Provided Engineer’s cost estimates for purposes of preparing Annual Work Plans and Budgets (AWPBs).
(d) Assisted the Ministry’s Procurement at National level to prepare solicitation documents (74No.).
(e) Assisted the Ministry with the selection of contractors (52No.).
(f) Reviewed, approved contractors’ Program of Works, certified IPCs and participated in scheduled site meetings.
(g) Prepared, where applicable environmental reports; EPBs, ESIAs for submission to appropriate statutory bodies.
(h) Prepared and submitted weekly, monthly, quarterly and annual standing reports. Project Total Value: USD30m.
Kailjee Construction Zambia Limited (Project Manager) Mar. 2014 – Oct. 2015 Key Role: Management and supervision of REA Grid Extension Projects in 2 of Zambia. Key Accountability
(a) Prepared BOQs/Tender documents for HT grid extension lines: 33kV, 11kV and 0.4kV for distribution.
(b) Planned, coordinated, budgeted and supervised junior staff to maximize company profits.
(c) Client and national agencies consultation to ensure legal framework, advice and guidance on the installation and commissioning of HT and MV lines in relation to existing SHEQ legislation.
(d) Participated in FAT, attended site meetings with client and other stakeholders.
(e) Prepared and submitted weekly, monthly, quarterly and annual standing reports.
Utilink Zambia Limited (Electrical Engineer/Team Leader), Lusaka Feb. 2013 to Feb. 2014 Key Role: Supervised REA projects and ZESCO Limited for the contract for the supply, delivery, installation and commissioning of grid extension lines and transformers in selected rural areas of Zambia. Key Accountability
(a) Executed project plans and ensured compliance and conformity to the safety standards.
(b) Provided supervision to the project team and conducted Factory Acceptance Tests (FATs).
(c) Coordinated and inspected construction activities.
(d) Carried out commissioning of the works in conjunction with REA and ZESCO Limited.
Precise Products Limited (Project Engineer Mar. 2009 – Dec. 2012 Key Role: Supervised projects involving civil, building and electrical services for the company and its clientele. Key Accountabilities
(a) Planned, coordinated and monitored civil, building and electrical works.
(b) Ensured all activities were carried out within approved budget without compromising the quality of the service.
(c) Ensured quality assurance during and after installation as well as monitoring and evaluation of projects.
(d) Project identification, preparation and conducted feasibility studies on the proposed undertakings.
(e) Prepared civil, building, construction and electrical infrastructure designs and specifications.
(f) Inspected and supervised works and ensured strict adherence to routine maintenance schedules.
(g) Prepared BOQs and provided Engineer’s estimates to management.
(h) Maintained, including troubleshooting of up to 500kVA Generators for the company and its clientele.
(i) Designed, installed and maintained solar and power backup systems.
(j) Prepared and submitted weekly, monthly, quarterly and annual standing reports.
Indeni Petroleum Refinery Company Limited (Instrumentation Specialist), now Indeni Energy Limited Jan. 2006 – Feb. 2008
Key role: Responsible for the installation and maintenance of all instrumentation in the plant and control room. Key Accountabilities
(a) Designed and installed new instruments as well as maintenance of plant equipment.
(b) Critically analyzed flow, pressure, temperature and level with a view to maximizing plant operations availability.
(c) Proposed, designed and constructed civil work additions and changes to the overall outlook of the Instrumentation Section.
Page 3 of 3
(d) Responsible for installation, maintenance and operation of the SCADA, RTU, PLC Systems.
(e) Prepared and issued job specifications and time schedules for all active projects
(f) Ensured compliance to SHEQ standards and other regulatory requirements.
(g) Responded to emergencies as it was necessitated.
(h) Responsible for training personnel under the department.
(i) Determined civil, building and construction works and engaged, supervised and monitored contractors.
(j) Procured and inventory Management, especially for critical spare parts and consumables.
(k) Submitted reports to the Technical Manager and/or Management.
(l) Ensured quality assurance and quality control for al instrumentation and equipment in the plant.
ZCCM, Mufulira Division (Government Entity) – Plant Metallurgist Jan. 1996 – Dec. 1998 Key Role: Risk based inspections to ensure integrity of structures and materials Key Accountabilities
(a) Undertook mechanical integrity assessments of the Concentrator Department.
(b) Facility and equipment condition assessments against the prevailing technical standards.
(c) Generated risk profiles for entire operating facilities.
(d) Ensured compliance to the safety standards as prescribed by the mines safety standard.
(e) Responded to emergencies as it was necessitated.
(f) Responsible for training of personnel under the Concentrator Department.
(g) Procured and inventory Management, especially for critical spare parts and consumables.
(h) Planned and executed all works related to civil, building and construction in and around the department.
(i) Submitted reports as and whenever due.
OTHER ACHIEVEMENTS
(a) Designed, planned and supervised electrical works: One Stop Shop, a World Bank funded project and commissioned by then UN Secretary General Banki Moon (2012), Livingstone, Southern Province, Zambia.
(b) Designed, planned and supervised all electrical works for the construction of Spar International Zambia, Livingstone, opposite Auto World.
(c) Kasumwa EnviroConsult General Suppliers (KEGS)/Zenith Consulting Company Limited: Participates in conducting ESIAs and EPBs for REA for Grid Extensions for: o The 590kW Kasanjiku Mini-hydro Power Project in Mwinilunga District, North-Western Province (2016) o Mushindamo, Kankolonkolo, Mufulira, Mwinuna, Kabwe, Chembe, Milenge, Kawambwa, Kalomo, Kayambi, Mundu and Mpepo Districts in six (6) Provinces (2015/2016). ESIAs and EPBs for:
o Great North Mall (Novare Great North), Great North Road, Lusaka (2015). o Woodlands Shopping Mall (2015).
o Large Timber Concession in North-Western Province (2015). o Construction of a modern university in Kabompo District, North-Western Province - Ministry of Higher Education (2017).
o Construction of a modern university in Katete District, Eastern Province - Ministry of Higher Education
(2017).
o Construction of a 7.0 Million Bulk Fuel Storage Facility in Chipata District, Eastern Province - Ministry of Energy (2018).
o Sawmill Installation project in Shiwang’andu district, Muchinga Province - Rong Da Zambia (2019). o Construction of a Water Transfer Canal Project in Zimba district, Southern Province, partnered with Trusted Partners of South Africa - Silverlands Ranching Limited (2020). REFEREES
Mr. Robby Kasubika Mr. Ngosa Pande Mr. Wilson Serphus Shonga Senior Lecturer – Faculty of Forestry Director General Treasurer The Copperbelt University Metropolitan Business Solutions United Mineworkers’ Union of Zambia P.O Box 21692 Plot No. 34919/1080, Kamwala South P.O Box 40695 Kitwe, Zambia, Copperbelt Province Lusaka, Zambia, Lusaka Province Mufulira, Zambia, Copperbelt Province Tel/WhatsApp.: +260-********* Tel/WhatsApp.: +260-********* Tel/WhatsApp.: +260-********* E-mail: *******@*****.*** E-mail: **********@*****.*** E-mail: *************@*****.***