Post Job Free
Sign in

Pipe Fitter Port Arthur

Location:
Port Arthur, TX
Salary:
$35
Posted:
October 30, 2024

Contact this candidate

Resume:

Career Objective

To provide safe quality work in pipe and installation within the oil and gas industry. Utilizing years of hands on field experience in fabrication and management, in addition to certifications that assess the quality and integrity of the product.

Work History

February 2021- May 2021

SWS Turner, Pipe Fitter. Over saw pipe fabrication and installation of pipe, layout and installed piping, supports, spring cans, hangers, etc. per Isometric drawings, modifications by Iso, repairs in live units.

November 2019-Dicember 2020

S&B, Pipe fitter . Over saw pipe fabrication and installation of pipe, layout and installed piping, supports, spring cans, hangers, etc. per Isometric drawings at Sunoco in Nederland Tx.

November 2015- Septe 2019

Mastercraft, Pipe Fitter – Forman: Exxonmobil Baytown, Texas NAG expansion. Over saw pipe fabrication and installation of stainless and carbon steel piping.

June 2015- October 2015

Zachry, Pipe Fitter-Pipe Forman: Air Liquide at Port Neches TX. Field verified and fabricated spool offsets, after successful completion installation of pipe spools promoted to Foreman. Area of responsibility Cold box and Argon box where oversaw and pipe installation and closure weld tie ins.

April 2015- June 2015

KBR, Pipe Fabricator: Replaced and installed piping to cooling water station at a turnaround in Dupont, Orange TX. Transferred to turnaround where we revamped a diesel refining station to increase efficiency working with lock out tag processes at ExxonMobil Baytown.

February-March 2015

Performance, Pipefitter: Demo and removal of piping with pneumatic cutting equipment. Then continued to use bull rigging techniques to install 24”-36” xh spools to rack in live unit. Turnaround at OCI Beaumont, TX January 2015

Tradesmen International, Pipe Fitter: Fit layout and installed piping, supports, spring cans, hangers, etc. per Isometric drawings to 100’ elevation of the Compressor deck. New construction Sabine Pass, LNG September 2014- December 2014

S&B, Pipe Fitter: During predown assigned as responsible lock out tag out authority, walked down systems and installed locks per p&id’s to isolate a safe work area. Then demoed fire damaged pipe using pneumatic cutting machines. Installed new piping using laser levels, string lines, and plumb bobs at Chevron. Port Arthur, TX

December 2013- September 2014

KBR, Pipe Fitter: Lay out pipe penetrations on coordinate per Isometric. Installed rigging to erect piping for flare line. After fabrication of pipe spools with odd offsets and safe, efficient installation

was promoted to Foreman to supervise pipe installation of 3 pipe racks in the live unit. New Construction project at Invista Chemical plant. Orange, TX

September 2013- November 2013

KBR, Pipefitter: Pre down, Under lock out tag out installed all steel braided hoses, blinded and removed piping, to flush and drain system. Safely executed hot taps and installation of high pressure piping systems during turnaround at BASF Chemical plant. Port Arthur, TX.

January 2013- May 2013

S&B, Pipefitter: Responsible of installing piping to boiler system all metric with random lengths requiring accurate field dimensions, precision cutting and fabrication at a New construction expansion at Valero Refinery. Port Arthur, TX

September 2012- November 2012

STI Group, Pipe Fabricator: Lead pipe fabricator worked alongside boilermaker crews to insure any and all modifications to new system installation were calculated and fabricated efficiently. Turnaround at Flint Hills Refinery. Port Arthur, TX

January 2012- August 2012

Turner, Pipefitter: Fit up and installed all heavy wall stainless piping to heater at Valero, Port Arthur tx. Then transferred to fabricate and install piping 2”-60” carbon and stainless-steel to the headers, stress free vessel connections, rack pipe and down comers in new construction project at Air Products. Port Arthur TX

January 2011- December 2011

PCL, Pipefitter: Provided quality pipe fabrication in Tank yard upon completion executed high pressure hydro test of systems. New Construction expansion project at Motiva Refinery, Port Arthur TX

September 2010- December 2010

February 2010- August 2010

November 2017- October 2019

Sun Industrial, Pipefitter-Pipe Foreman: Fit up and installed all heavy wall stainless piping to heater at Valero, Port Arthur tx. Then transferred to fabricate and install piping 2”-60” carbon and stainless-steel to the headers, stress free vessel connections, rack pipe and down comers in new construction project at Hackberry Louisiana LNG

Certifications and Qualifications

NCCER in Pipe fabrication and installation. Written and hands on plus certification.

#9013303

Francisco meza



Contact this candidate