Post Job Free
Sign in

Team Members Quality Control,High standard of safety

Location:
Kazakhstan
Posted:
October 28, 2024

Contact this candidate

Resume:

Curriculum Vitae

John Saint-Yves Middlemiss

PERSONAL SUMMARY

FIRST NAMES John Saint-Yves

SURNAME Middlemiss

DATE OF BIRTH 10 February 1967

MARITAL STATUS Relationship

CHILDREN Two

RESIDENTIAL ADDRESS South African Citizen

Johannesburg

CONTACT DETAILS Cell 082-***-****

E-mail ***************@*****.***

AVAILABILITY Immediate

MISSION STATEMENT

Since qualifying as an Electrician in 1991, I extended my expertise into middle management and eventually managing contracts in different parts (which also included installation and commissioning of hydraulic equipment and pneumatics) over the world, implementing a high standard of safety and quality to give the client an efficient safe plant/project in the right time frame. Over the years I have also used my skills to train and uplift people to make them understand more about the environmental and safety standards. This created a happy and safe working environment, allowing me to achieve what I did in the construction industry and to work with all levels of management and workers. Continue to expand already extensive knowledge of electrical trade and management skills.

S. A Passport Valid

S. A Drivers Licence

British Passport (awaiting Issue)

MV Switching Certification completed (awaiting registration with the Dept. of Labour)

3 Phase Licence completed (awaiting registration with the Dept. of Labour) Curriculum Vitae

John Saint-Yves Middlemiss

CAREER CHRONOLOGY

Company Presently Self Employed / Freelance

Period June 2023 - Present

Currently engaging in completing my 3 Phase Wireman’s Licence

Completed MV Switching course

Company First Quantum

Sub Contractor – Lightcon

Zambia

Period 10 March 2023 – 25 June 2023

Contract Complete

Responsibilities

Construction of Heavy Duty Vehicle Workshop/New Offices

Trenching of MV / LV cables/termination

O/H line tie-ins

Installation of Distribution Panels/MCC

Installation of MV / LV cable racking/cables

LV Distribution

Quality Control

Commissioning and testing of installation

Company Botselo Mills

Period September 2020 – February 2023

Position/s FMCG

Responsibilities

Maintenance

Fault finding

Electrical upgrades

Electrical installations

Company Self employed

Project Stud manager / Farm manager

Period August 2019 – September 2020

Responsibilities

Manage horse stud

Started snail farming

Acquired Provincial Colours and competed in The SA Champs Company Anglo American

Project Mafube Project

Period July 2018 – August 2019

Position/s Clerk of works

Responsibilities

Responsible for electrical installation

LV and MV

Commissioning

Curriculum Vitae

John Saint-Yves Middlemiss

Company AUSENCO

Project

Period

Tasiast Optimization Project 12K

February 2016 –June 2018

Position/s E & I&C Supervisor

Responsibilities

33 KV Over Head Line Installation

Installation 33 of KV and 6.6 KV Switch rooms

Mills

Conveyors

All MV cable installation and terminations/tie ins

LV cabling and cable routing Brown fields/Greenfields

Energising of Switch rooms

Lock out /Tag out –Competent (Kinross/Ausenco)

Working at Heights training (Kinross/Ausenco)

Permit issuing training (Kinross/Ausenco)

Transformer installations/Terminations

Crushers

Cyclone Towers

Daily progress updates./ Weekly progress meetings

Reporting of deviating to schedule

Routing and MV installation in Brown fields/ Green fields

VLF testing

Tie-ins and co-ordination with Client/

Forecasting and reporting.

Daily interaction with contractors to determine high risk and deviations.

Submissions of project schedule as per requirements of contract.

Planning and scheduling activities in terms of look ahead schedule.

Resolution of all E & I (site) problems relating to on site changes and design modifications to routing of E & I and supporting other construction trades.

RFI’s, S.I’s and NCR’s

Verification and technical resolution to T.Q.s

Checking P & ID’s for correctness and installation.

Mitigate any NCR’s, Lost time delays, Cost impacts.

Proactive in Quality Control / Audits.

Compilation of Drawing Registers.

Responsible for the entire E & I installation to the highest Quality Standards.

Implement good understanding and execution of HSE.

Successful management of all disciplines.

Curriculum Vitae

John Saint-Yves Middlemiss

Company Metix (Pty) Ltd, part of SMS Group, Malaysia. Project EPC Contract, Construction of Furnaces.

Period August 2014 – June 2016

Position/s E & I Construction Manager.

Responsibilities Adjudication O E & I Contractor.

Compiling of Bill of Quantities and Preambles.

Site establishment.

Daily progress updates.

Reporting of deviating of the schedule to Project Manager.

Early warning communicated to the Contractor and Project Management.

Forecasting and reporting.

Daily interaction with contractors to determine high risk and deviations.

Submissions of project schedule as per requirements of contract.

Planning and scheduling activities in terms of look ahead schedule.

Resolution of all E & I (site) problems relating to on site changes and design modifications to routing of E & I and supporting other construction trades.

Expediting structural equipment to site.

Verification and technical resolution to T.Q.s .

Checking P & ID’s for correctness and installation.

Mitigate any NCR’s, Lost time delays, Cost impacts.

Proactive in Quality Control / Audits.

Compilation of Drawing Registers.

Responsible for the entire E & I installation to the highest Quality Standards.

Implement good understanding and execution of HSE.

Successful management of all disciplines.

Conveyors

Furnaces

Substation-36 KV – Construction and Commissioning

MCCs

Buildings

Reason for

Leaving

Contract completed.

Company ABEINSA,Upington, South Africa

Project KHI Solar One Project 50 Mw.

Period January 2014 to August 2014

Position/s E & I Superintendent

Responsibilities Daily monitoring of contractors.

Excavation / routing of cables.

Quality Control.

Monitoring of good HSE practices.

Daily interaction with contractors and client to determine risks and deviations from quality and schedule.

Planning and scheduling in terms of three week look ahead.

Verification of technical queries of installation.

Correct installation of all power cabling (SWA) and fibre optic: o Single mode

o Multi mode

Splicing and commissioning of installation.

Reason for

Leaving

Contract completed.

Curriculum Vitae

John Saint-Yves Middlemiss

Company Professional Solutions Global, Mauritania

Period March 2013 – May 2013

Position/s Project Superintendent

Responsibilities Approving Risk Assessments and Safe Working Procedures; JSA’s

Compiling BOQ,s

Costing and quoting on additional work.

Co-ordinating with Government officials to be compliant regarding local work force

Hiring and monitoring local Sub-contractors

Quality Control and Non-Conformance;

Managing Compensation Events; and Site Instructions

Acquire new projects and managing relationships;(Kinross/Hatch)

Ensuring project is completed timorously;

Managing work force; local and Expatriates

Managing and keeping records of daily progress;/reporting

Upgrade of the existing gold plant,;

Routing and installation of all cable trays(power and instrumentation)

install instruments and fibre optic

loop checks, point to point checks

Overseeing installation of power station and Installation of 33 KV -11 KV-6.6 KV Overhead lines

Installation of earth grids and plant earthling (thermo –weld)

excavation /cable trenches

On hands terminating of 240’mm PEX Cables

Transformer Installations (from OHL to Transformer –switchgear-6.6 substation/feeders)

Cable routing/trenching and HI POT TESTING(DC)

Day to day planning of maintenance for the Tasiast Mine;

Commissioning and implementing lock out procedures. Reason for

Leaving

Contract completed.

Company Sukari (Pharaoh Gold Mines), Egypt Centamin Period November 2011 – August 2012

Position/s EPCM Contract – E & I Superintendent

Responsibilities Approving Risk Assessments and Safe Working Procedures;

Quality Control and Non-Conformance;

Managing Compensation Events;

Costing and purchasing of Equipment

Upgrade of the existing gold mine’s / CIL plant, floatation plant, mills / ball and sag and conveyers;

Overseeing installation of power station (Wartsilla) 6 x 7 Meg engines;

Overseeing refurbishing of 7 Meg Existing generator, electrical, piping and mechanical works (existing power station);

Pressure testing/flushing/pickle n passivation of all piping(commissioning)

Routing and installation of cable trays (MV-Instrumentation)

Transformer installation and terminations

Tie-ins with existing power reticulation

Planning shut downs, limiting loss of production

Transformers/switchgear

.

Reason for

Leaving

Project Complete

Curriculum Vitae

John Saint-Yves Middlemiss

Company End 2 End, Congo, DRC

Period June 2011 – October 2011

Position/s E&I Superintendent / Site Manager (Sulphur Plant) Responsibilities Approving Risk Assessments and Safe Working Procedures;

Quality Control and Non-Conformance;

Managing Compensation Events;

Installation of Sulphur plant at Mutanda Mine;

Complete Electrical and Instrumentation reticulation and installation;

Liaising with piping discipline and installation and routing of instrumentation cable ways.

Installation of instruments, point to point checks, loop checks

Fabrication and routing of power cable trays

MV Installation ;Transformer installation and terminations/switching

Earthing

Commissioning;

Building relationships with other divisions;

Draw of baseline program;

Progress and Technical meeting with client and subcontractors;

Value US$ 30 million.

Reason for

Leaving

Headhunted. Renewed challenges and opportunities.

Company SENET, Cote D’Ivoir- TONGON

Period August 2009 – May 2011

Position E & I Superintendent

Responsibilities Approving Risk Assessments and Safe Working Procedures;

Quality Control and Non-Conformance;

Managing Compensation Events;

installation and commissioning of Hydraulic equipment and pneumatics

Installation of 20 x 1MEG CAT gensets and synchronize;

Installation of 11 KV overhead lines

Installation of 13 MCC’s;

Installation and routing of all cable trays for Power and instrumentation;

oversee installation of instruments

loop checks, point to point checks

Earthing/ thermo welds

Conveyers;

Ball and sag mills;

CIL Plant;

Primary and Tertiary Crushers;

Gold Room installed;

PLC and SCADA installation and integration;

Electrical reticulation of camp facilities;

Hiring labour and subcontractors;

Planning, monitoring and progress and answering FEQ’s;

Planning, monitoring and ordering equipment and material;

Commissioning;

Lock out procedures;

Safety and Environmental;

Value US$ 300 million (entire project).

Reason for

Leaving

Contract complete

Curriculum Vitae

John Saint-Yves Middlemiss

Company HATCH JV, HMG – Durban

Period May 2007 – August 2009

Position NEC Electrical Supervisor

HATCH WAS THE COMPANY THAT GAVE ME THE OPPORTUNITY TO GO FOR THE NECESSARY COURSES TO EXTEND MY KNOWLEDGE AND EXCUTE THE NEC

Responsibilities Familiarize the sub-contractors and the main contractor with the NEC contract;

Insuring that contractors complied with the NEC;

Dealt with compensation events and risk management;

Approving Risk Assessments and Safe Working Procedures;

Quality Control and Non-Conformance;

Installation and routing of all cable within the port of Durban Harbou

Manage and QC all CCTV installations

Isolation of all redundant cables within the port;

Monitoring civil works and daily reporting;

Commissioning;;

Lock out procedures; Planning, monitoring and progress and answering FEQ’s;

Liaising with local municipal authorities regarding isolation permits and safe working practices;

Planning, monitoring and inspecting equipment and material prior to arrival on site (time management);

Safety and Environmental reports;

Liaising with port authorities on a daily basis regarding procedures and safe working practices for all contractors;

Relationship Management between port authorities/Transnet and Hatch. NOTE: Was NEC electrical supervisor for the upgrade of Durban Car Terminal, Harbour widening and sand by past project. Later sent to Woodmead Head Office where I was instrumental in the upgrade with implementation of the coal rail upgrade from Witbank to Ogies. Reason for

Leaving

Contract complete

Curriculum Vitae

John Saint-Yves Middlemiss

Company G. Liviero & Sons, – Durban

Period May 2005 – June 2007

Position Electrical Foreman (Construction)

Responsibilities Install all power on multiple construction sites;

Install power for overhead cranes;

Liaise with municipal representatives regarding power reticulation to the various sites;

Responsible for all crane maintenance;

Oversee sub-contractors’ electrical installations at Zimbali Estate and the upgrade of Durban Point;

Responsibly for ordering and handling of electrical material;

Implementation of safety practices;

Redline drawings;

Responsible for uninterrupted power on site;

Manage electrical workforce and report to CEO;

Reason for

Leaving

Head hunted by Hatch

Company Rotek (Eskom Department of Water and Forestry) Period February 2004 – May 2005

Position Electrical Foreman (Construction & Maintenance) Responsibilities Install all power on multiple construction sites;

Upgrade and maintenance of existing pump stations for DWAF (department of water and forestry);

Liaise with municipal representatives regarding power reticulation to the various sites;

Risk assessments, safe working procedures;

Responsible for all crane maintenance;

Installation of telemetry systems;

Upgrading and installation of lightning on all pump stations;

Oversee sub-contractors’ electrical installations - QC;

Responsibly for ordering and handling of electrical material;

Implementation of safety practices;

Redline drawings;

Responsible for uninterrupted power on site;

Responsible for daily report on vehicle logbooks and man hours

Quotations and submitting of invoices and payments;;

Manage work force;

Report to Senior Management weekly;

Reason for

Leaving

Better opportunity

Company Senet, Guinea

Period October 2004 – November 2004

Position Electrical Supervisor

Reason for

Leaving

DUE TO MALARIA HAD TO BE TREATED AND COULD NOT FINISH CONTRACT

Curriculum Vitae

John Saint-Yves Middlemiss

Company MDM – Mali - Morilla upgrade

Period February 2003 – July 2004

Position Electrical Supervisor

Responsibilities Approving Risk Assessments and Safe Working Procedures;

Quality Control and Non-Conformance;

Managing Compensation Events;

installation and commissioning of Hydraulic equipment and pneumatics

Installation of 11 KV overhead lines;

Installation of MCC’s;

Installation and routing of all cable trays for Power and instrumentation and fibre optic;

Conveyers;

Compilation of drawing registers;

Ball and sag mills;

CIL Plant;

Primary and Tertiary Crushers;

PLC and SCADA installation and integration;

Electrical reticulation of camp facilities;

Hiring labour and subcontractors;

Planning, monitoring and progress and answering FEQ’s;

Planning, monitoring and ordering equipment and material;

Commissioning;

Lock out procedures;

Safety and Environmental;

Reason for

Leaving

Contract complete

Curriculum Vitae

John Saint-Yves Middlemiss

CAREER CHRONOLOGY (Continued)

Company Location/Project Period Position

Presently Self-

employed

Durban, South

Africa

06/2023 -

Botselo Mills Durban, South Africa 09/2020 - 05/2023 FMCG Self-Employed 08/2019 - 09/2020 Stud/Farm Manager

Anglo American Mafube Project 07/2018 - 08/2019 Clerk Of Works AUSENCO Tasiast Optimization

Project 12K

02/2016 - 06/2018 E & I & C Supervisor

Metrix (Pty) Ltd-

Part of SMS

Group

Malaysia 08/2014 - 06/2016 E & I Construction

Manager

ABEINSA Upington, South

Africa

01/2014 - 08/2014 E & I Superintendent- 50

MW Solo Plant

Professional

Solutions Global

Mauritania 03/2013 - 05/2013 Project Superintendent Sukari (Pharaoh

Gold Mines)

Egypt Centamin 11/2011 - 08/2012 EPCM Contract-E & I Superintendent

End 2 End Congo, DRC 06/2011 - 10/2011 E & I Superintendent/Site Manager (Sulphur Plant)

SENET Cote D’Ivoir- Tongon 08/2009 - 05/2011 E & I Superintendent HATCH JV HMG Durban, South Africa 05/2007 - 08/2009 NEC Electrical Supervisor G. Liviero & Sons Durban, South Africa 05/2005 - 06/2007 Electrical Foreman

(Construction)

Rotek (Eskom

Dept of Water &

Forestry)

South Africa 02/2004 - 05/2005 Electrical Foreman

(Construction &

Maintenance)

SENET Guinea 10/2004 - 11/2004 Electrical Supervisor MDM Mali

Morilla upgrade

02/2003 - 07/2004 Electrical Supervisor

Era Beier Pinetown 08/2002 - 02/2003 Maintenance

UEC

Technologies

Durban 07/2001 - 08/2002 Foreman

Hendock

Engineering

Durban 03/2001 - 07/2001 Construction/Maintenance

Shear Electrical Gauteng 02/2001 - 03/2001 Installation/Maintenance Petrochemical

MDM Mali 12/2000 - 02/2001 Electrical Supervisor

Sappi Swaziland 10/2000 - 11/2000 Supervisor

Shear Electrical Gauteng 09/2000 - 10/2000 Installation/Maintenance Petrochemical

MDM/RAND

GOLD

Mali 06/2000 - 08/2000 Installation/Construction – Gold Mine

CMTD (NPA) Durban 06/1999 - 06/2000 Anaesthetics Technician SA Fabrics Durban 08/1997 - 06/1999 Foreman

Curriculum Vitae

John Saint-Yves Middlemiss

CAREER CHRONOLOGY (Continued)

Company Location/Project Period Position

Shear

Electrical

Gauteng 06/1997 - 08/1997 Maintenance/Installation Petrochemical

Hisbayco

Construction

Zaire 06/1997 - 06/1997 Installation/Construction

– Sulphur Plant

Kvaerner Davy Gauteng 06/1996 - 05/1997 Construction Computer Site

Installation

Gauteng 08/1995 - 04.1996 Installation

NPA Durban 08/1991 - 03/1995 Maintenance

Arban Conveyor

Care

Gauteng 04/1991 - 07/1991 Installation

Stilfontein Gold Mine Stilfontein 11/1985 - 04/1991 Apprentice ACADEMIC QUALIFICATIONS

Institution Qualification/Training Year Achievements Botselo Mills Maintenance

Fault finding

Electrical upgrades

Electrical installations

2020 Completed MV Switching

Certification (Awaiting Registration -

process in place)

Self-Employed Stud/Farm Management 2019

Anglo American Responsible for electrical

installation

LV and MV

2018

AUSENCO

33 KV Over Head Line Installation

Installation 33 of KV and 6.6 KV

Switch rooms

Mills

Conveyors

All MV cable installation and

terminations/tie ins

LV cabling and cable routing

Brown fields/Greenfields

Energising of Switch rooms

Lock out /Tag out –Competent

(Kinross/Ausenco)

Working at Heights training

(Kinross/Ausenco)

Permit issuing training

(Kinross/Ausenco)

Transformer

installations/Terminations

Crushers

Cyclone Towers

Daily progress updates./ Weekly

progress meetings

Reporting of deviating to

schedule

Routing and MV installation in

Brown fields/ Green fields

VLF testing

Tie-ins and co-ordination with

2016

Curriculum Vitae

John Saint-Yves Middlemiss

AUSENCO (cont) Client/

Forecasting and reporting.

Daily interaction with contractors

to determine high risk and

deviations.

Submissions of project schedule

as per requirements of contract.

Planning and scheduling activities

in terms of look ahead schedule.

Resolution of all E & I (site)

problems relating to on site

changes and design modifications

to routing of E & I and supporting

other construction trades.

RFI’s, S.I’s and NCR’s

Verification and technical

resolution to T.Q.s

Checking P & ID’s for correctness

and installation.

Mitigate any NCR’s, Lost time

delays, Cost impacts.

Proactive in Quality Control /

Audits.

Compilation of Drawing

Registers.

Responsible for the entire E & I

installation to the highest Quality

Standards.

Implement good understanding

and execution of HSE.

Successful management of all

disciplines

2016

Metix (Pty) Ltd-

Malaysia

Adjudication O E & I Contractor.

Compiling of Bill of Quantities and

Preambles.

Site establishment.

Daily progress updates.

Reporting of deviating of the

schedule to Project Manager.

Early warning communicated to

the Contractor and Project

Management.

Forecasting and reporting.

Daily interaction with contractors

to determine high risk and

deviations.

Submissions of project schedule

as per requirements of contract.

Planning and scheduling activities

in terms of look ahead schedule.

Resolution of all E & I (site)

problems relating to on site

changes and design modifications

to routing of E & I and supporting

other construction trades.

Expediting structural equipment

to site.

Verification and technical

resolution to T.Q.s .

Checking P & ID’s for correctness

and installation.

Mitigate any NCR’s, Lost time

delays, Cost impacts.

Proactive in Quality Control /

2015

Curriculum Vitae

John Saint-Yves Middlemiss

Metix (Pty) Ltd-

Malaysia

(Cont)

Audits.

Compilation of Drawing

Registers.

Responsible for the entire E & I

installation to the highest Quality

Standards.

Implement good understanding

and execution of HSE.

Successful management of all

disciplines.

Conveyors

Furnaces

Substation-36 KV

MCCs

Buildings

2015

ABEINSA-Upington Daily monitoring of contractors.

Excavation / routing of cables.

Quality Control.

Monitoring of good HSE

practices.

Daily interaction with contractors

and client to determine risks and

deviations from quality and

schedule.

Planning and scheduling in terms

of three week look ahead.

Verification of technical queries of

installation.

Correct installation of all power

cabling (SWA) and fibre optic:

Single mode

Multi mode

Splicing and commissioning of

installation

2014

Professional Solutions

Global-Mauritania

Approving Risk Assessments and

Safe Working Procedures; JSA’s

Compiling BOQ,s

Costing and quoting on additional

work.

Co-ordinating with Government

officials to be compliant regarding

local work force

Hiring and monitoring local Sub-

contractors

Quality Control and Non-

Conformance;

Managing Compensation Events;

and Site Instructions

Acquire new projects and

managing

relationships;(Kinross/Hatch)

Ensuring project is completed

timorously;

Managing work force; local and

Expatriates

Managing and keeping records of

daily progress;/reporting

Upgrade of the existing gold

plant;

Routing and installation of all

cable trays(power and

instrumentation)

2013

Curriculum Vitae

John Saint-Yves Middlemiss

Professional Solutions

Global-Mauritania

(Cont)

install instruments and fibre optic

loop checks, point to point checks

Overseeing installation of power

station and Installation of 33 KV -

11 KV-6.6 KV Overhead lines

Installation of earth grids and

plant earthling (thermo –weld)

excavation /cable trenches

On hands terminating of 240’mm

PEX Cables

Transformer Installations (from

OHL to Transformer –switchgear-

6.6 substation/feeders)

Cable routing/trenching and HI

POT TESTING(DC)

Day to day planning of

maintenance for the Tasiast Mine;

Commissioning and implementing

lock out procedures.

2013

Sukari (Pharaoh Gold

Mines)

Approving Risk Assessments and

Safe Working Procedures;

Quality Control and Non-

Conformance;

Managing Compensation Events;

Costing and purchasing of

Equipment

Upgrade of the existing gold

mine’s / CIL plant, floatation plant,

mills / ball and sag and

conveyers;

Overseeing installation of power

station (Wartsilla) 6 x 7 Meg

engines;

Overseeing refurbishing of 7 Meg

Existing generator, electrical,

piping and mechanical works

(existing power station);

Pressure testing/flushing/pickle n

passivation of all

piping(commissioning)

Routing and installation of cable

trays (MV-Instrumentation)

Transformer installation and

terminations

Tie-ins with existing power

reticulation

Planning shut downs, limiting loss

of production

Transformers/switchgear

2011

End 2 End-Congo

Approving Risk Assessments and

Safe Working Procedures;

Quality Control and Non-

Conformance;

Managing Compensation Events;

Installation of Sulphur plant at

Mutanda Mine;

Complete Electrical and

Instrumentation reticulation and

installation;

Liaising with piping discipline and

installation and routing of

instrumentation cable ways.

2011

Curriculum Vitae

John Saint-Yves Middlemiss

End 2 End-Congo

(Cont)

Installation of instruments, point

to point checks, loop checks

Fabrication and routing of power

cable trays

MV Installation ;Transformer

installation and

terminations/switching

Earthing

Commissioning;

Building relationships with other

divisions;

Draw of baseline program;

Progress and Technical meeting

with client and subcontractors;

Value US$ 30 million.

2011

Senet Approving Risk Assessments and

Safe Working Procedures;

Quality Control and Non-

Conformance;

Managing Compensation Events;

installation and commissioning of

Hydraulic equipment and

pneumatics

Installation of 20 x 1MEG CAT

gensets and synchronize;

Installation of 11 KV overhead

lines

Installation of 13 MCC’s;

Installation and routing of all

cable trays for Power and

instrumentation;

oversee installation of

instruments

loop checks, point to point checks

Earthing/ thermo welds

Conveyers;

Ball and sag mills;

CIL Plant;

Primary and Tertiary Crushers;

Gold Room installed;

PLC and SCADA installation and

integration;

Electrical reticulation of camp

facilities;

Hiring labour and subcontractors;

Planning, monitoring and

progress and answering FEQ’s;

Planning, monitoring and ordering

equipment and material;

Commissioning;

Lock out procedures;

Safety and Environmental;

Value US$ 300 million (entire

project).

2009

Curriculum Vitae

John Saint-Yves Middlemiss

Hatch Construction and Commissioning

Procedures

CLSP Training

HIR

IRCON

Legal Liability

NEC Introduction

Drafting Contract

Project Management

Supervisor Role

Change Management through

Compensation Events

Program

Planning

RCAT

Scaffold Safety Control(Inspector)

Site Safety

VFL and Incident Reporting

2008

Durban Technical

College

Installation Rules / Wireman

License

1995 N3 and commenced Wireman’s

Licence

Stilfontein Gold Mine Electrical Apprentice N3 1989-1991 South African

Defence Force

Military Service:

Corporal/Instructor

1986-1988 Special Forces

South West Africa Colours –

Equestrian Discipline

Milner High School,

Klerksdorp

Matric

Subjects:

Afrikaans

English

Mathematics

Biology

Science

History

1986 Provincial Colours (Western

Transvaal) – Swimming

Provincial Colours (Western

Transvaal) - Soccer

Provincial Colours (Western

Transvaal) – Equestrian Sport

OTHER QUALIFICATIONS

Qualified Riding Instructor – Equestrian Show Jumping Qualified Skipper – Durban Operator’s Certificate (skipper) Scaffolding Inspector

21 years Construction Experience (Mostly Gold Industry) MV Switching Course completed - Awaiting Licence Registration Completed 3 Phase Wireman’s Licence – Awaiting Registration/Dept. of Labour Lock Out and Tag Out

Confined spaces

Working at Hights

Curriculum Vitae

John Saint-Yves Middlemiss

COURSE COURSE DATE STATUS

Construction & Commissioning procedures 2008/03/19 11:00

Attended

Construction & Commissioning procedures 2008/03/19 11:00

Attended

CSLP Training Day 1 2008/08/13

07:30

Attended

CSLP Training Day 2 2008/08/20

07:30

Attended

CSLP Training Day 3 2008/08/27

07:30

Attended

Fire Fighter Level 1 2008/08/19

08:30

Invited

Fire Fighter Level 2 2008/08/19

08:30

Invited

HIRA 2008/04/14

08:00

Attended

Induction Starter Pack 2007/06/08

12:00

Attended

iPas DM Basic Training 2008/01/24

11:30

Invited

iPas DM Basic Training 2008/05/13

13:30

Invited

iPas DM Basic Training 2008/07/02

12:00

Invited

iPas TF 2008/05/14

10:00

Attended

Ircon Training Day 1 2007/10/02

11:00

Attended

Legal Liability 2008/04/17

08:30

Attended

NEC-1 Introduction to NEC3 Day 1 2007/11/21

08:30

Attended

NEC-1 Introduction to NEC3 Day 2 2007/11/21

08:30

Attended

NEC-2 Drafting anECC3 contract including contract Data & works Inf, from tender to award

2007/11/08

08:30

Attended

NEC-3 Role of the Project Manager and Supervisor in ECC3 and the agents under other NEC3

2008/05/29

09:00

Attended

NEC-5 Change management through compensation events in ECC3 2007/11/09 08:00

Attended

Programme & Planning in NEC3 contracts 2009/04/21

09:30

Attended

Programme Induction 2007/07/26

07:15

Invited

RCAT Day 1 2006/09/17

08:30

Invited

RCAT Day 2 2008/09/18

08:30

Invited

RCAT Day 3 2008/09/19

08:30

Invited

Scaffold Safety Control Inspection Day 1 2008/09/03 09:00

Attended

Scaffold Safety Control Inspection Day 2 2008/09/03 09:00

Attended

Site Safety Induction – Queenswarehouse 2007/05/29 09:00

Attended

VFL & Incident Reporting 2008/09/16

10:30

Invited

ROLE MODULES

iPas DM Basic Training

iPas TF

Programme Induction

WTS Module 06



Contact this candidate