Post Job Free
Sign in

Project Management Mig Welder

Location:
Douala, Littoral, Cameroon
Posted:
October 23, 2024

Contact this candidate

Resume:

ARC & MIG WELDER/ FITTER

NAME

:

JOHANES MBAH MBAH

DATE OF BIRTH

:

** ***** ****

STATUE

:

Married

NATIONALITY

:

Camerounian

EXPERIENCE

:

** ***** & over

TEL

:

+237-***-**-**-** / 681952956

Affiliation to associations/professional groups : Staff representative at ENEM from 2021 to 2023

Head of Welders 2021 till date

TRAINING

Training at THE NASLAN ENGINEERING GROUP Center Located at Bonaberi as a 6G Approved Welder with Matricul F115

AREA OF SKILLS AND RESEARCH

Taking readings

Reading of overall plans ; definition and

manufacturing

Reading a welding procedure

Mastery of chamfering and control techniques

metrological

Tracing and cutting of all types of metals

Good mastery of assembly techniques

mechanically welded elements

Good mooring and handling technique for heavy parts

Good mastery of the mechanized air plasma jet cutting

ARC and MIG welder in all positions

Ability to work at height and mastery of

techniques for handling heavy parts

Assembler of metal structures

MY MOST BEAUTIFUL EXPERIENCES PROFESSIONAL :

Experience with ENEM

My daily life in the ENEM workshop, as head of welders

Since 2021 :

Coordinate all the welders according to the

work to be carried out

Supervision of welding work using various MIG – MAG – TIG – SMAW processes

Contribution to the choice of filler metals following the different processes

Reading, interpretation and implementation of DMOS

depending on the projects

Supply management of filler metals

Active participation in various projects on client site

July 2024 : Replacement of the stainless steel hopper of the spent grain press including transfer screw on behalf of GUINNESS Cameroon. Critical project requiring the shutdown of the brewery.

Dec 2020 to Jan 2021 : Manufacturing and assembly of ten gates at the Bépanda stadium in Cameroon on behalf of MAGIL

Oct to Dec 2020 : Prefabrication and assembly of two tanks with a unit capacity of 150 m with mechanical agitators and intended for the storage of liquid latex for SUDCAM

2019-2020 : Manufacturing and assembly at quay 41 of the port of Douala of 12 palm oil storage silos with a total capacity of 180 m

Sept 2018 to Dec 2018 : SUPPLY WORK AND INSTALLATION OF A 2-POST METAL AWNING FOR THE TRADEX DAMARA SERVICE STATION IN DAMARA RCA

Location : DAMARA

Main characteristics of the project : Manufacturing, transport and assembly On the site.

Position : Metal construction works supervisor

Activities Carried Out : Welder/fitter

Project cost : 45,030,479 FCFA (excluding tax)

Funder :

Contact and verification address : B.P. : 3489 Douala-Cameroon Bonaberi Ndobo

Email :****@*****.**/www.enemcameroun.com

2018 : Manufacturing and installation of a 10 m tank equipped with an electric gauge and intended for storing lubricating oil for Kribi Power Development Company Cameroon (KPDC)

Dec 2017 to May 2018

Project Name :SUPPLY, PREFABRICATION, TRANSPORT AND ASSEMBLY OF TWO VERTICAL TANKS (2x500 M3 AND 750 M3)

Location : BAMBARI

Main characteristics of the project : The responsibilities were the management of the material and the quality control of the manufacturing operations and the admissibility in the assembly of the elements (Verticality, horizontality,

Position : Metal construction works supervisor

Activities Carried Out : Welder/fitter

Project cost : 762,160,148 FCFA (excluding tax) Donor :

Contact and verification address : B.P. : 3489 Douala-Cameroon Bonaberi Ndobo

Email :****@*****.**/www.enemcameroun.com

Feb 2017 to Mar 2017 : SUPPLY, PREFABRICATION, TRANSPORT AND. ASSEMBLY OF THREE VERTICAL TANKS (JETA1, DIESEL & WATER)

Location : BANGUI – Central Africa Republic

Main features of the project : The client was Tristar and the tanks were intended for MUNUSCA to be used to store fuel and water for their mobility.

Position : Metal construction works supervisor

Activities Carried Out : Welder/fitter

Project cost : 660,313,453.81 FCFA (excluding tax)

Funder :Contact and verification address : P.O. :3489 Douala-Cameroon Bonaberi Ndobo

E-mail :****@*****.**/www.enemcameroun.com

Mar 2017 to Apr 2017 : Rehabilitation of the framework and change of the roof sheets of the clinker belt conveyor

The project took place with the belt conveyor in service, the success of the project was based on the wearing of PPE and the scrupulous compliance with working rules and procedures.

Apr 2017 to May 2017 : Replacement of steam piping lines at GUINNESS Cameroon

Aug 2017 to Sept 2017 : Installation of a coiled tank and connection of SOCAPALM pipes intended for preheating diesel

Sept 2017 to Oct 2017 : Structural repairs on the RTG (Mobile Gantry) at the Douala International Terminal (DIT Container Terminal )

Oct 2016 to Nov 2016 Manufacturing and assembly of the framework for the stand of the Buea Town stadium

Location : CITY OF BUEA

Main characteristics of the project : Project assigned to One month from the start of

The African Women’s Cup, where her skills strongly contributed to the success and compliance with deadlines ; work under pressure for 30 days for manufacture and subsequently assemble a cantilever frame with tie rod in Buea. Position : Welder/fitter

Activities Carried Out : Main foreman during this mission

Project cost : 170,000,000 FCFA (excluding tax)

Feb to Mar 2013 : Manufacturing and assembly of booms for heavy machinery at SUDCAM

LANGUAGE OF EXPRESSION

French :Good Oral expression and Basic written expression

English : Good oral and written expression

COMPUTER SKILLS : Basic knowledge.

HOBBIES

Sport : Football, Athletics

Movies, Traveling

I, the undersigned JOHANES MBAH MBAH,

certify, in all conscience, that theInformation above accurately reflects my situation, my qualifications andmy experience.

Douala, 22/10/24



Contact this candidate