ARC & MIG WELDER/ FITTER
NAME
:
JOHANES MBAH MBAH
DATE OF BIRTH
:
STATUE
:
Married
NATIONALITY
:
Camerounian
EXPERIENCE
:
** ***** & over
TEL
:
+237-***-**-**-** / 681952956
Affiliation to associations/professional groups : Staff representative at ENEM from 2021 to 2023
Head of Welders 2021 till date
TRAINING
Training at THE NASLAN ENGINEERING GROUP Center Located at Bonaberi as a 6G Approved Welder with Matricul F115
AREA OF SKILLS AND RESEARCH
Taking readings
Reading of overall plans ; definition and
manufacturing
Reading a welding procedure
Mastery of chamfering and control techniques
metrological
Tracing and cutting of all types of metals
Good mastery of assembly techniques
mechanically welded elements
Good mooring and handling technique for heavy parts
Good mastery of the mechanized air plasma jet cutting
ARC and MIG welder in all positions
Ability to work at height and mastery of
techniques for handling heavy parts
Assembler of metal structures
MY MOST BEAUTIFUL EXPERIENCES PROFESSIONAL :
Experience with ENEM
My daily life in the ENEM workshop, as head of welders
Since 2021 :
Coordinate all the welders according to the
work to be carried out
Supervision of welding work using various MIG – MAG – TIG – SMAW processes
Contribution to the choice of filler metals following the different processes
Reading, interpretation and implementation of DMOS
depending on the projects
Supply management of filler metals
Active participation in various projects on client site
July 2024 : Replacement of the stainless steel hopper of the spent grain press including transfer screw on behalf of GUINNESS Cameroon. Critical project requiring the shutdown of the brewery.
Dec 2020 to Jan 2021 : Manufacturing and assembly of ten gates at the Bépanda stadium in Cameroon on behalf of MAGIL
Oct to Dec 2020 : Prefabrication and assembly of two tanks with a unit capacity of 150 m with mechanical agitators and intended for the storage of liquid latex for SUDCAM
2019-2020 : Manufacturing and assembly at quay 41 of the port of Douala of 12 palm oil storage silos with a total capacity of 180 m
Sept 2018 to Dec 2018 : SUPPLY WORK AND INSTALLATION OF A 2-POST METAL AWNING FOR THE TRADEX DAMARA SERVICE STATION IN DAMARA RCA
Location : DAMARA
Main characteristics of the project : Manufacturing, transport and assembly On the site.
Position : Metal construction works supervisor
Activities Carried Out : Welder/fitter
Project cost : 45,030,479 FCFA (excluding tax)
Funder :
Contact and verification address : B.P. : 3489 Douala-Cameroon Bonaberi Ndobo
Email :****@*****.**/www.enemcameroun.com
2018 : Manufacturing and installation of a 10 m tank equipped with an electric gauge and intended for storing lubricating oil for Kribi Power Development Company Cameroon (KPDC)
Dec 2017 to May 2018
Project Name :SUPPLY, PREFABRICATION, TRANSPORT AND ASSEMBLY OF TWO VERTICAL TANKS (2x500 M3 AND 750 M3)
Location : BAMBARI
Main characteristics of the project : The responsibilities were the management of the material and the quality control of the manufacturing operations and the admissibility in the assembly of the elements (Verticality, horizontality,
Position : Metal construction works supervisor
Activities Carried Out : Welder/fitter
Project cost : 762,160,148 FCFA (excluding tax) Donor :
Contact and verification address : B.P. : 3489 Douala-Cameroon Bonaberi Ndobo
Email :****@*****.**/www.enemcameroun.com
Feb 2017 to Mar 2017 : SUPPLY, PREFABRICATION, TRANSPORT AND. ASSEMBLY OF THREE VERTICAL TANKS (JETA1, DIESEL & WATER)
Location : BANGUI – Central Africa Republic
Main features of the project : The client was Tristar and the tanks were intended for MUNUSCA to be used to store fuel and water for their mobility.
Position : Metal construction works supervisor
Activities Carried Out : Welder/fitter
Project cost : 660,313,453.81 FCFA (excluding tax)
Funder :Contact and verification address : P.O. :3489 Douala-Cameroon Bonaberi Ndobo
E-mail :****@*****.**/www.enemcameroun.com
Mar 2017 to Apr 2017 : Rehabilitation of the framework and change of the roof sheets of the clinker belt conveyor
The project took place with the belt conveyor in service, the success of the project was based on the wearing of PPE and the scrupulous compliance with working rules and procedures.
Apr 2017 to May 2017 : Replacement of steam piping lines at GUINNESS Cameroon
Aug 2017 to Sept 2017 : Installation of a coiled tank and connection of SOCAPALM pipes intended for preheating diesel
Sept 2017 to Oct 2017 : Structural repairs on the RTG (Mobile Gantry) at the Douala International Terminal (DIT Container Terminal )
Oct 2016 to Nov 2016 Manufacturing and assembly of the framework for the stand of the Buea Town stadium
Location : CITY OF BUEA
Main characteristics of the project : Project assigned to One month from the start of
The African Women’s Cup, where her skills strongly contributed to the success and compliance with deadlines ; work under pressure for 30 days for manufacture and subsequently assemble a cantilever frame with tie rod in Buea. Position : Welder/fitter
Activities Carried Out : Main foreman during this mission
Project cost : 170,000,000 FCFA (excluding tax)
Feb to Mar 2013 : Manufacturing and assembly of booms for heavy machinery at SUDCAM
LANGUAGE OF EXPRESSION
French :Good Oral expression and Basic written expression
English : Good oral and written expression
COMPUTER SKILLS : Basic knowledge.
HOBBIES
Sport : Football, Athletics
Movies, Traveling
I, the undersigned JOHANES MBAH MBAH,
certify, in all conscience, that theInformation above accurately reflects my situation, my qualifications andmy experience.
Douala, 22/10/24