Profile Summary
Key Skills
• Forward-focused professional with 15 years 04 months of successful
career with diverse roles distinguished by commended performance as Quantity Surveyor and Quantity Estimation for civil, architecture, steel structures, piping, electrical and instrumentation disciplines.
• Proficiently analysed contract and tender documents, specifications, standard drawings, and special requirements with
clients/subcontract MOM (method of measurements).
• Undertaken Quantity Survey position in Oil & Gas, Refinery, Fertilizers, Petrochemical, Power Plants Construction Project for EPC, EPCM, LSTK & Contracting Company’s
• Managed pre- and post-contract quantity survey and estimation activities for engineering construction projects.
• Performed pre-contract quantity estimation activities such as, prepared tender and proposal BOQ, schedule of rates, budget estimation, tender documents, and subcontract agreements.
• Managed post-contract activities, such as created AFC or IFC BOQ, rate analysis, assessment of interim payment; moreover, reviewed and valued variations, claims, EOT, and disruption costs.
• Developed and prepared ongoing re-budgeting, quantity, and cost reconciliation; furthermore, performed task as progress reporting, site coordination, site measurements and verification.
• Gained expertise in quantification and costing and effective BOQ control and monitoring with excellent analytical and computer skills.
• Kept track record of successful completion of projects, worth multi- million dollars, by developing strong logs and database.
• Proven expertise in checking contractor’s interim valuations and final cost.
• Gained experience in final quantity acceptance and cost adjustments for final account towards contract closure.
• Managed in collecting and analysing information, error tracing, problem-solving, and decision making.
Pre and Post Contract QS activities
Quantity Estimation & Costing
Budget estimation, Tender
documents preparation
Drafting subcontract agreements
Establishing BOQ, Rate Analysis
Valuing variations, claims, EOT &
disruption costs
Ongoing Re-budgeting
Progress reporting & coordination
Site Measurement and Verification
Assessment of Interim payments
And Final Account
As Built Quantity Reconciliation
Procurement/Purchase
Establishing Logs & Database
Error Tracing & Problem Solving
Analytical & Computer Skills
Career Timeline (Recent 4)
Since Jun’23- Present Since Dec’21- Apr’23 Since Sep’21- Dec’21 Since Feb’21- Aug’21 MANISH ANANT SALVI B.E. AssocRICS
Sr. Quantity Surveyor (Civil, Steel, Architecture, Piping, E&I) M/S Toyo Engineering India Ltd., India
as Sr. Quantity Estimator
M/S JGC Arabia, KSA as Quantity
Surveyor
M/S Tata Projects Ltd, India as
Quantity Estimator
M/S SK ecoplant, UAE as
Cost supervisor /QS
+966-****-***** (KSA), +91-750**-***** (India)
*************@*****.*** / *************@*******.*** https://www.linkedin.com/in/manish-salvi-quantity-surveyor/ Education & Professional Qualification
Soft Skills
• Bachelor in Civil Engineering from IIBMT, Delhi, in 2022 with First Class
• Diploma in Civil Engineering from Government Polytechnic, Mumbai, in 2006, First Class with Distinction
• S.S.C. from New English School, Valang in 2003 with First Class Professional Accreditation & certifications
• AssocRICS Associated professional of RICS since November 2022 Work Experience
Jun’23 – To Present with M/S JGC Arabia, Saffaniyah, Saudi Arabia as Quantity Surveyor (1y,3m) Dec’21 – Apr'23 with M/S SK ecoplant (SK E&C), UAE as Cost Supervisor / QS (1y,4m) Sep’21 – Dec’21 with M/S Toyo Engineering India Ltd., India as Sr. Quantity Surveyor/Estimator –CSA (3m) Feb’21 – Aug’21 with M/S Tata Projects Ltd, India as Quantity Estimator(QS) (6m) Dec’18 – Feb’20 with M/S Daewoo E&C, Kuwait as Quantity Surveyor Engineer – CSA (1y,2m) Aug’15 - Dec’18 with M/S Hyundai Heavy Industries, Kuwait as Quantity Surveyor-Engineer (3y,4m) Aug’14 - Jan’15 with M/S Equate Petrochemical Company, Kuwait as Quantity Surveyor (5m) Sep’12 - May’14 with M/S Al-Suwaiket Support service, Saudi Arabia as Quantity Surveyor (1y,8m) Nov’07 - Aug’12 with M/S Toyo Engineering India Ltd., Mumbai as Asst. Designer (QS) (4y,9m) Mar’07 - Oct’07 with M/S DFX System Pvt. Ltd., Mumbai as CAD Engineer & Estimator (8m) Key Result Areas:
Stage 1: Preparation Level (Analyzing and preparing)
• Analyzed overall work scope, specification, design data, and unit plot plans. Developed a list of project elements
(Structure) to be quantified in the form of facility, Category wise WBS, and CWP (Construction work packages) WBS.
• Valued the preliminary budget estimate based on the conceptualized engineering drawings.
• Estimated quantity based on the design, drawings, specifications, unit price, and methods of measurement.
• Quantified for multi-discipline engineering fields, such as Civil, Architectural, Steel Structure, Piping, Mechanical, Electrical, and Instrumentation.
• Developed IFC Quantity Database and records from the IFC approved drawings, with respect to location plans and CWP
(Construction work package no) or with respect to the facility, followed standard drawings wherever required. Stage 2: Processing level (Valuing, assessing, and agreeing)
• Valued, and assessed subcontractor BOQ, interfaced with the contractor until agreement.
• Valued, assessed, and processed subcontractor interim payment statements in accordance with verification of the material quantities which are installed or executed by the subcontractor on the site.
• Conducted weekly site walk down for validation of Quantities installed, interfaced with the subcontractor, and provided a report for progress reporting.
• Prepared, maintained, and monitored construction Progress BOQ with respect to the drawings, facility, and CWP
(Construction Work Package).
• Evaluated and agreed all the quantities estimated and claimed by the subcontractor are in accordance with the engineering information, such as design drawings, specifications, unit price, and method of measurements.
• Analyzed the information received and identified the deviation or variation; furthermore, coordinated with the project management team to mitigate the additional cost.
• Supported and coordinated with other teams to receive or provide related information, such as quantity to be procured, the progress of installed quantity, and the remaining quantity to be installed. Stage 3: Assisting, Forecasting, and contract closure level
• Assisted in commercial, cost control and contracts administration processes.
• Valued, assessed, and processed variation, claims, EOT, and disruption costs. Communicator Innovator
Problem Solving
Collaborator Data Analysis
• Prepared and evaluated ongoing re-budgeting for the subcontract.
• Conducted forecast analysis of materials based on actual consumption.
• Performed forecast cost analysis for material, equipment, and manpower based on revised work plans and schedules.
• Reconciliation of material quantity at the final stage (at provisional acceptance or TOC).
• Managed to finalize the final BOQ after reconciliation of quantity based on As-Built Drawings.
• Prepared and assisted in budget monitoring, cost coding activity, Cost Value Reconciliation, and Earned Value Analysis.
• Valued, prepared, assessed, negotiated, and agreed on the final account settlement. Stage 4: Recording and storing level (maintaining logs and developing database)
• Developed and maintained the most useful work-related logs.
• Prepared a beneficial database with evaluated data such as material quantity, rates, labor, and other costs.
• Established reliable as-built indices records with necessary details for future projects as benchmarks or limits.
• Developed a database for average material consumption against the design quantities to analyze the losses or wastages.
• Prepared database for fuel consumption and productivity achieved by construction equipment in the project.
• Established the necessary document as a lesson learned, which would provide a benchmark or reference for future projects.
Recent Project:
ARAMCO, Zuluf Project, Safaniya, Saudi Arabia (Zuluf Onshore Oil Facilities Project) ADNOC, M Project, Fujairah-UAE (Underground Cavern Construction For Crude Oil Storage Project) KIPIC, Mina AL ZUOR Refinery, Kuwait (Al Zuor New Refinery Project) KNPC, CFP (Clean Fuel Project), MAB2 (Mina Abdullah Refinery), Kuwait IT Skills
Personal Details
Date of Birth: 18-May-1988
Languages Known: English, Marathi, Hindi
Current Address: Satyam Platinum, Flat-504, Plot-43, Sector-10, Kamothe, Navi-Mumbai,
Pin- 410 209, Maharashtra, India
Nationality: Indian
Passport No.: Z5368349, Date of Issue: 29/01/2019, Expiry; Date: 28/01/2029
Marital Status: Married (5 dependents)
Annexure
Projects - Field Quantity surveyor Projects - Quantity Estimation
• ARAMCO, Zuluf Project, Saffaniya, Saudi Arabia • VGO HDT, HPCL(HRPL), Pachpadra, Rajasthan (IFC BOQ)
• ADNOC, M Project, Fujairah-UAE • 5139 - SHEL ECC (Singapore). (IFC BOQ)
• KIPIC, Mina AL, ZOUR Refinery, Kuwait • 6237 - IPNC Panipat Naphtha Cracker Project (As built BQ)
• KNPC, CFP (Clean Fuel Project), MAB2, Kuwait • 6265 - KSRU Sulphur Recovery Unit Project (As built BQ)
• Equate Petrochemical Co., Shuaiba, Kuwait
• Royal Commission Project - RC15 & RC17 (IFC BOQ) Proposals - Quantity Estimation:
• 4705 - Indogulf Fertilizers ltd (IGFL) • 4677 - Hydrogen Generation Unit-CPCL
• 4706 - Chambal Fertilizers (CFG3) • 2269 - Crude Stabilization Unit- Oman/EP
• 6260 - CCR Regeneration Package GGS R, Bhatinda • 5150 - TIRE
• 4658 - Cairn Bhogat Terminal • 2275 - TAKREER_BOU
• 4665 - PLDSJ - Dahej Stand By Jetty • 4697 - ONGC Petro Additions Ltd. (OPAL)
• 4668 - SRU-IV IOCL Mathura • 4728 - Ras Tanura oil Refinery
• 4671 - MRPL CDU VDU Revamp • 4928 - IOCL, Panipat Refinery Expansion. (P25) Professional References
1. Kajol Bhattacharya - QS Manager at FDH JV, CFP(Clean fuel project) KNPC & at Mina AL, ZOUR Refinery, KIPIC, Kuwait Contact: +1-346-***-****(Houston, USA) *****.************@*****.*** 2. Rizwan Ahsan - Progress Engineer at FDH JV, CFP(Clean fuel project) KNPC, Kuwait Contact: +966-*********(KSA) ******.*****@*****.*** MS Excel & Excel VBA
MS Word/PowerPoint
AutoCAD
Access database
PlanSwift